33
|
Mon Oct 3 17:29:53 2022 |
IC, VK, VI (ND) | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting #3 | |
Shift summaries for the ring for last
week are at
https://elog.lal.in2p3.fr/THOMX/Commissionning/568
https://elog.lal.in2p3.fr/THOMX/Commissionning/570
|
|
|
35
|
Mon Oct 10 10:04:49 2022 |
VK, IC, VI, JH, ND | Under Process | Shift summary | resumes |
|
Summary of the ring commissioning meeting #4 | | - 300 turns achieved.
- Probably more but limited by
libera cut-off frequency. |
|
|
37
|
Mon Oct 17 10:02:07 2022 |
VK, IC, VI, JH, SC, ND | Reference Solution | Info | resumes |
|
Summary of the ring commissioning meeting #5 | | See slides attached to the indico page
https://indico.ijclab.in2p3.fr/event/8885/
Pb with BPM => visual check |
|
|
38
|
Mon Nov 7 23:53:29 2022 |
VK, IC, VM, JH, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Discussed recent orbit correction of
the expanded orbit.
Need
to make run with cavity detuning from |
|
|
40
|
Mon Dec 5 17:42:51 2022 |
CB/HG/SC/KD | Fixed | Info | resumes |
|
Programme linac semaine 5 décembre | | Lundi 5 décembre :
redémarrage technique
Pb refroidissement Pb |
|
|
42
|
Mon Jan 9 10:12:40 2023 |
IC, VK, VM, SC, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Notes from last week:
Beam was very unstable
(probably energy instabilities), lot of time |
|
|
43
|
Mon Jan 16 09:38:16 2023 |
VK, VM, SC, ND, HG | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Summary of last week:
- On Thursday the beam energy was
very different from usual (magnets current |
|
|
44
|
Mon Jan 23 09:54:14 2023 |
VK,IC, SC, VM, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | No beam last week. No beam this week.
Machine recovery on 2/2 => Nicolas
may try to tune the machine with students. |
|
|
47
|
Mon Feb 20 10:06:36 2023 |
VM, VK, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | This week: beam on Thursday.
So far we did not see any screenshot
of Ring variables check. |
|
|
50
|
Mon Mar 20 10:08:24 2023 |
IC, VK, VM, JH, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | - Went up to 100kV in the cavity once it
was tuned.
- Achieved nice storage stable |
|
|
51
|
Thu Mar 23 12:29:05 2023 |
ND | New Solution | Info | resumes |
|
Réunion Physique ThomX | | Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/
Quelques notes de la réunion
de Physique de ThomX: |
|
|
57
|
Mon Jun 19 09:46:32 2023 |
IC, VK, VM, LS, JH, SC, ND | New Solution | Shift summary | resumes |
|
Summary of the ring commissioning meeting | | Report from last week:
- Attempted the strategy suggested
by Alex |
|
|
59
|
Mon Jun 26 09:57:52 2023 |
VK, IC, LS, ND | New Solution | Shift summary | resumes |
|
Summary of the ring commissioning meeting | | Discussion mécanique
- Tous les dipoles ont été
alignés par rapport à des surfaces |
|
|
13
|
Thu Dec 10 14:43:07 2020 |
Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020 | Not Fixed | Problem | problemes |
|
Clients 1, 4 et 5 non fonctionnels | | En complément du message de Hayg,
client 4 et 5 ne fonctionnent pas non plus
(en plus de client 1). |
|
|
14
|
Wed Mar 3 10:49:14 2021 |
Hayg | Under Process | Info | problemes |
|
WC tests TANGO | |
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean
Dans les variables MeanStd :
Charge 1 :
er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean
Charge |
|
|
15
|
Wed Mar 3 11:30:46 2021 |
Hayg | Under Process | Info | problemes |
|
RE: WC tests TANGO | |
|
|
|
22
|
Fri Mar 4 11:07:28 2022 |
CB/SC | | Problem | problemes |
|
liste des actions à menées | | |
|
|
4
|
Thu Jul 16 09:50:37 2020 |
Entered by Sophie Chance from 134.158.195.143 on Thu Jul 16 09:50:21 2020 | Under Process | Info | etc |
|
demarrage à blanc | | debut du démarrage à blanc
9h45. Démarrage prévu par étape. |
|
|
11
|
Wed Dec 9 14:26:35 2020 |
Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020 | Fixed | Info | etc |
|
re-organisation PC-client en SdC | | suite à la discussion de lundi 7
/12/20, les PC clients en SdC ont été
déplacés et re-organisé |
|
|
12
|
Wed Dec 9 14:33:08 2020 |
Hayg | Under Process | Info | etc |
|
RE: | | Pour info :
client 1 ne fonctionne
pas encore. Il n'a pas été |
|