25
|
Fri Sep 2 08:51:46 2022 |
MO | | Shift summary | etc |
|
démarrage | | 8h35 mise sous tension: PSS, LB9000,
modulateur, chillers |
|
|
6
|
Thu Dec 3 10:58:11 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020 | Fixed | Info | docs |
|
demarrage a blanc 3 dec 2020 | | Bilan démarrage à blanc 3
dec 2020 : (H Monard, S Cavalier)
but : verification etat IHM pour |
|
|
7
|
Thu Dec 3 13:45:13 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020 | Fixed | Info | docs |
|
signal photodiode laser | | |
|
|
28
|
Fri Sep 23 09:44:14 2022 |
IC, VK, AM, VC, ND | Under Process | Info | docs |
|
Beam requirements for the ring | | The following parameters are required for
ring operations:
- At least 50pC on TL/DG/ICT.01 |
|
|
31
|
Tue Sep 27 17:45:54 2022 |
ND | Under Process | Info | docs |
|
RE: Beam requirements for the ring | | An IHM to check some of these parameters
has been created (git/panneaux/StatusInfoIHM_ring_vars.py)
and added to Plateforme_IHM... |
|
|
32
|
Wed Sep 28 09:56:44 2022 |
ND, IC | Reference Solution | Info | docs |
|
Steerers and BPM map for the ring | | See attached files. |
 |
|
39
|
Mon Dec 5 10:05:11 2022 |
VK, IC, VM, JH, KD, ND | New Solution | Info | analyse |
|
Summary of the ring commissioning meeting | | The ring orbit has been re-established
despite some difficulties after the shutdown.
The ring cavity has been started. |
|
|
41
|
Tue Dec 6 00:15:55 2022 |
ND | New Solution | Info | analyse |
|
RE: Summary of the ring commissioning meeting | | Regarding the remote control of the RF
synthetizer: it can only be controlled via
GPIB and RS-232. |
|
|
49
|
Mon Mar 13 09:39:39 2023 |
IC, VM, SC, JH, VC, ND | New Solution | Shift summary | analyse |
|
Summary of the ring commissioning meeting | | Excitation (betatron oscillation) on the
beam observed by exciting it with the extraction
kicker => initial measures of the tune. |
    |
|
53
|
Mon May 22 10:05:30 2023 |
IC, VK, LS, JH, ND | New Solution | Shift summary | analyse |
|
Summary of the ring commissioning meeting | | === Summary of last week:
- Frequency was reduced to 500.0202MHz
but the beam stayed only for 100s of turns |
|
|
54
|
Tue May 30 10:12:30 2023 |
VK, IC, JH, VM, LS, MB, ND | New Solution | Info | analyse |
|
Summary of the ring commissioning meeting | | Main studies:
- Measure bucket width in phase
on Thursday at 500.02MHz => no storage |
|
|
1
|
Tue Nov 19 11:16:39 2019 |
Entered by Hayg Guler from 134.158.195.145 on Tue Nov 19 11:16:25 2019 | Under Process | Shift summary | Prise de donnees |
|
| | Salle de controle :
installer Xlib pour tout
le monde
mettre les environnements |
|
|
2
|
Tue Jul 7 14:25:15 2020 |
Entered by bruni from 134.158.195.142 on Tue Jul 7 14:24:55 2020 | Under Process | Shift summary | Prise de donnees |
|
test régulation températures canon/section | | Ouverture des chillers et du frigo sur
place.
Ouverture de l'IHM plateforme |
|
|
Draft
|
Wed Jul 8 14:33:04 2020 |
Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020 | Under Process | Shift summary | Prise de donnees |
|
test moteur solénoide en charge | | Prise de mesure relative entre les deux
bobines : 18.7cm avec les alimentations éteintes
mais du refroidissement. |
|
|
8
|
Thu Dec 3 13:50:27 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020 | Fixed | Info | Prise de donnees |
|
signal photodiode 03-12-20 | | |
|
|
9
|
Thu Dec 3 15:17:04 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020 | Fixed | Info | Prise de donnees |
|
| | Signaux RF - REdPitaya 03-12-20
Photodiode laser - RP.04 A
QS RP.04 B |
|
|
10
|
Thu Dec 3 15:26:22 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020 | Fixed | Info | Prise de donnees |
|
| | signaux photodiode PrC Qs test avec generateur
impulsion ! 2 V , 3 µs (bleu ciel)
et signal avec rampe, 1V (moire), photodiode |
|
|
16
|
Thu Mar 4 16:36:12 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:35:53 2021 | Under Process | Shift summary | Prise de donnees |
|
Tests IHM RF | | De nouveaux tests ont été
fait sur l'IHM RF amélioré
(M. Omeich, H. Guler, S. Chance, JN. Cayla) |
|
|
17
|
Thu Mar 4 16:46:04 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:45:48 2021 | Under Process | Shift summary | Prise de donnees |
|
| | Test du repitaya 1 voie 1 (Pi section)
et 2 (Pr section)
|
 |
|
18
|
Thu Mar 4 16:56:19 2021 |
Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:56:07 2021 | Under Process | Shift summary | Prise de donnees |
|
redpitaya 2 | | Tests du redpitaya 2 voie 1 (Boucle section)
voie 2 est libre |
|