HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Notes concernant la preparation du Commissionning, Page 1 of 3  Not logged in ThomX    logo
Entry   IC, VK, VI (ND); Summary of the ring commissioning meeting #3 
Entry   VK, IC, VI, JH, ND; Summary of the ring commissioning meeting #4 
Entry   VK, IC, VI, JH, SC, ND; Summary of the ring commissioning meeting #5 
Entry   VK, IC, VM, JH, ND; Summary of the ring commissioning meeting 
Entry   CB/HG/SC/KD; Programme linac semaine 5 décembre 
Entry   IC, VK, VM, SC, ND; Summary of the ring commissioning meeting 20_injections.jpg
Entry   VK, VM, SC, ND, HG; Summary of the ring commissioning meeting 
Entry   VK,IC, SC, VM, ND; Summary of the ring commissioning meeting 
Entry   VM, VK, ND; Summary of the ring commissioning meeting 
Entry   IC, VK, VM, JH, ND; Summary of the ring commissioning meeting 
Entry   ND; Réunion Physique ThomX 
Entry   IC, VK, VM, LS, JH, SC, ND; Summary of the ring commissioning meeting 
Entry   VK, IC, LS, ND; Summary of the ring commissioning meeting 
Entry   Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020; Clients 1, 4 et 5 non fonctionnels 
Entry   Hayg; WC tests TANGO 
    Reply   Hayg; RE: WC tests TANGO Screenshot_from_2021-03-03_11-29-57.png
Entry   CB/SC; liste des actions à menées 
Entry   Entered by Sophie Chance from 134.158.195.143 on Thu Jul 16 09:50:21 2020; demarrage à blanc 
Entry   Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020; re-organisation PC-client en SdC 
    Reply   Hayg; RE:  
ELOG V3.1.4-395e101