  66   Thu Oct 3 14:00:13 2019 Loïc AmoudryFixedissuecablingOptical roomElectrical trouble (disjunction)The circuit breaker on ThomX cavity drops
@1.5-1.8kW when we turn on 1/2nd
stage of the amplifier or 3rd stage of the
  
  7   Mon Oct 22 11:03:22 2018 Ronic ChicheFixedinfovacuumOptical roomDétection de fuiteMail de Bruno Mercier du 18/10/2018 :

Un petit CR
de la journée:
  
  112   Mon Jan 17 10:04:14 2022 Ronic ChicheFixedinfomechanicsThomX iglooDocumentation about mechanics on Atriumhttps://atrium.in2p3.fr/0dded51a-1cb0-43e6-ae0d-626cd5db7078

a lot of schematics regarding the
  
  62   Mon Sep 30 11:20:48 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomDiffusion ULE spherical mirror (S3) vs Fused Silicate injection planar mirror (P1)Observation made with IR Beam Viewer: 

The observation of P1 and S3 simultaneously
while locking shows much higher diffusion
 diffusion.jpg 
  132   Mon Mar 14 18:39:40 2022 Manar AmerFixedinfomechanics | lasers and optics | detectors and electronicsThomX iglooCurrent Installed SetupAttached is the current setup in ThomX  18-02-2022_ThomX_FPCavity_Finesse_Setup.jpg 
  102   Tue Oct 27 13:13:50 2020 Loïc AmoudryFixedinfolasers and opticsOptical roomCoating reflectivityCoatings reflectivity curves and datas
for HR Saphir, HR Suprasil and HR ULE.
 6x 
  12   Wed Jan 16 14:54:14 2019 Loïc AmoudryFixedreportlasers and optics | utilitiesOptical roomCleaning outside IP cavityFrom 7th january to 11th january.

 
 Avant_nettoyage.jpgApres_une_semaine_nettoyage_lingettes_et_brosseadents.jpgSans_UV_traces_scotch_nettoyees_apres_baking.jpg 
  307   Fri Dec 22 09:46:18 2023 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX iglooChristmas shutdownthis morning, I shut off all the equipements
(especially the computer) except the ones
powered by the UPS : laser controller, laser
  
  308   Fri Dec 22 16:13:27 2023 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX iglooChristmas shutdownthis afternoon, I checked visually what
happens when the AC power of the UPS is broken
down => the laser controller has still
  
  378   Wed Nov 20 11:28:01 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooChecking the amplifier powerthis morning, with Daniele, we checked
the amplifier power, right after the CVBG
(the power meter has to be placed on a metal
  
  379   Wed Nov 20 12:00:47 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooChecking the amplifier powerwe did a long term run (25 mn) with the
powermeter located at the FPC position at
33% amplifier ratio.
  
  380   Wed Nov 20 12:42:11 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooChecking the amplifier powerI put back and aligned the 1/2 waveplate
only and I get 71kW max after its optimization
and optimizing the CEP and alignment (without
  
  381   Wed Nov 20 18:55:37 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooChecking the amplifier powerthis afternoon, we put back the 1/4 and
1/2 waveplates and after a long alignment/angle
tuning/CEP optimization process, we hardly
  
  21   Tue Mar 26 18:26:32 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomCheck of mirrors and coating directionsDirection of HR face of P1 and P4 have
been checked, there was no problem. The mirrors
are in the good direction and the coating
 ThomX_P4.jpg 
  367   Tue Oct 8 11:59:27 2024 Fatematuj JohoraUnder Processreportlasers and opticsOptical roomCharacterizing Focus Tunable LensYesterday Ronic and I worked on the high
laser power measurements with the Vertical
set-up of the Focus Tunable Lens. We went
 Updates_of_Focus_Tunable_lenses.pdf 
  65   Thu Oct 3 13:53:44 2019 Loïc AmoudryFixedreportvacuumOptical roomCavity under vacuum The cavity is right now at 6.5e-8 mbar
(turbo pumps on for 1 night and ionic pumps
for 3h), primary pumps and turbo pumps are
  
  58   Thu Sep 12 16:19:26 2019 Loïc AmoudryFixedreportmechanics | lasers and opticsOptical roomCavity dust source checkSeveral experiments have been done in order
to check the potential source of dust in
the ThomX cavity. For each step, we look
  
  129   Fri Mar 11 12:59:35 2022 Manar AmerFixedreportlasers and opticsThomX iglooCavity beam Image Updated beam image after change on the
mode axis.

Taken after P4.
 Capture.PNGCapture2.PNG 
  20   Fri Mar 22 17:53:10 2019 Loïc AmoudryFixedreportlasers and optics | vacuumOptical roomCavity at atm pressureDry air injected into the cavity.

Lock has been proceeded without
any trouble. ~~4000 finesse. Considered to
 finessealair.isf 
  121   Thu Feb 3 14:11:50 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsThomX iglooCavity Lock and Finess measurment This morning, me and Ronic managed to obtain
the FSR and image of the finesse which is
to be analyzed.
 6x 