125
|
Thu Feb 3 18:59:10 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Cavity Lock and Finess measurment |
to measure the Finesse, instead
of having 2x EOM for the PDH and for the |
|
|
126
|
Thu Feb 3 19:01:04 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Cavity Lock and Finess measurment |
After changing the way of injecting
modulation for PDH and modulation for FSR |
|
|
127
|
Fri Feb 4 10:59:56 2022 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Cavity Lock and Finess measurment | one thing which could reduce the Finesse
is the L-shape metal piece if it is slightly
inserted in the FP-cavity mode path. |
 |
|
212
|
Tue May 30 18:32:37 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | This morning, while trying Guillaume solution
of disconnecting the 24 V necessary to the
second and third stage and raise the threshold |
|
|
215
|
Fri Jun 2 10:54:25 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | Yesterday, with Ronic we locked ThomX cavity
on the second resonance
Laser : 33.36 MHz , Amplifier : |
13x |
|
216
|
Tue Jun 6 01:12:11 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | Today, I installed a power meter at the
transmission point of the 1st spherical mirror
, transmission 3 ppm (direct from cavity |
 |
|
218
|
Wed Jun 7 21:46:50 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | Today with Ronic,
starting with major events that
happened (Water circulation + ThomX valves |
   |
|
220
|
Fri Jun 9 19:51:43 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | In the morning, we locked on the first
resonance. With an increase on the amplifier
power @ 20-25% and 30%, which reduced the |
 |
|
221
|
Mon Jun 19 16:08:15 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | cabling | software | ThomX igloo | Cavity Lock - Alphanov Amplifier | The computer is possible to connect from
the control room,
we are able to run remotely the |
|
|
203
|
Tue Mar 28 13:56:52 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | Cavity Alighnment | Last week, with Ronic and Victor we aligned
the cavity using CW laser (Koheras)
we have also installed |
9x |
|
204
|
Tue Apr 4 13:03:23 2023 |
Manar Amer | Fixed | report | lasers and optics | vacuum | detectors and electronics | ThomX igloo | Cavity Alighnment | Today, we prepared lenses for a telescope
for the CW laser injection into the cavity,
yet to be installed |
 |
|
192
|
Wed Mar 8 15:11:49 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | CW laser installation and cleaning | This morning with Manar, in order to prepare
the installation of the news FP cavity mirrors,
- we installed the Koheras below |
|
|
193
|
Mon Mar 13 14:02:59 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | CW laser installation and cleaning | This morning with Ronic , in preparation
for the mirror installation, we removed additional
mechanics and cables from the table. |
|
|
205
|
Fri Apr 7 00:26:11 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | CW FP Cavit lock | Yesterday morning we locked the cavity
on a strange mode in the cavity (we call
it mode, but not sure what it is ??) |
  |
|
206
|
Fri Apr 7 15:56:40 2023 |
Manar Amer | Fixed | report | lasers and optics | detectors and electronics | ThomX igloo | CW FP Cavit lock | This morning with Daniele and Viktor,
- we confirmed the "potato"
mode was well centered on the injected beam |
|
|
86
|
Thu Nov 28 10:40:29 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | CVBG reference and Eric Cormier calculation | The Stretcher is the "D 24-02-II",
it must be used in double path before the
amplifier injection. |
  |
|
391
|
Wed Jan 8 12:24:48 2025 |
Ronic Chiche | Under Process | info | lasers and optics | detectors and electronics | cabling | ThomX igloo | CEM noise measurements | The goal of these measurements is to check
if one can find some correlation between
the CFP lock losses observed during a run |
   |
|
392
|
Wed Jan 8 16:08:59 2025 |
Ronic Chiche | Under Process | info | lasers and optics | detectors and electronics | cabling | ThomX igloo | CEM noise measurements | This afternoon, we started almost all the
parts of the machine with Vincent and Nicolas,
and we didn't see any change in the Loop |
|
|
27
|
Tue Apr 2 18:05:46 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Beam size at closest spherical mirrors position | S3 and S2 @ +1 640 000 and P1 and P4 @
-825 000
Diameter in x: 4.7mm |
|
|
18
|
Tue Mar 19 16:35:32 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Beam size and finesse | FSR initiale : 33.34 MHz (S3 = -825000
et S4 = -825000)
Beam size initiale : wx=2.05mm |
|