  Status of commissioning, report also here plots are reports., Page 5 of 13  Not logged in ELOG logo
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics all_mirrorsplaced_after_m2_window.jpg20222704_SBox_alignment.pptx
Finished the alignment of the SBox with M1 of SBox placed, to be changed to gamma factory mirror later

Observed what seems to be transmission through M2 mirror, to be confirmed. image attached shows it

a PowerPoint attached showing the details of today's work.
    Reply   Spincoater - Mirrror cleaning , posted by Manar Amer at Optical room about lasers and optics | utilities Images_SBox_Mirrors.pptx
Images of the SBox mirrors cleaned at the same time when the cavity was aligned.

Directly from the spincoater to the SBox directly.

PowerPoint attached shows details
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics Beating_TM00_SBox_damaged_M1.jpgBeating_HigherOrder_SBox_damaged_M1.jpg
Last week In FP cavity we had all SBox mirrors including the damaged M1 mirror.

The beating was observed with just a slight adjustment on M4 alignment.

In addition, it was also observed while driving the piezo of the CW laser.
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics M2_alignment_M3_pinhole.jpgM3_alignment_M4_pinhole.jpgM4_alignment_M1_pinhole.jpgBeating_TM00_CW_piezo_drive.jpg
Today; replaced the M1 SBox mirror with M1 from gamma factory , following the previous alignment.

Removed all mirrors and cleaned them one by one.

Started with no M1, placed M2 did its alignment through M3 pinhole, then placed M3 aligned it through M4 pinhole, then placed M4 aligned it through
    Reply   Spincoater - Mirrror cleaning , posted by Manar Amer at Optical room about lasers and optics | utilities 20220509_Images_SBox_Mirrors.pptxM1GFA.jpgM2FA.jpgM3FA.jpgM4FA.jpg
PowerPoint shows the detailed images of all the mirrors before and after cleaning.

Images of SBox mirrors and M1 from Gamma factory attached only for the front after cleaning

the lines showing are on the back of the mirrors, they come from the spinning mount the mirrors are fixed on in the spin-coater.
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics Beating00_after_rotatingM2_2.jpg
Yesterday, to find the source of why the mode is deformed, I tried to rotate the mirrors to see if there is a change.

I started with M2 and rotated it by ~ 90 degrees, there is a change in the shape of the beam.(image attached)

Will see if changing M2 to the spare M2 from SBox can fix the issue.
    Reply   Spincoater - Mirrror cleaning , posted by Manar Amer at Optical room about lasers and optics | utilities M2_spare_fb_2.jpgM2_spare_fa_2.jpg20201210_M2_spare_after_cleaning.tif
Following the observation that when rotating M2 plan mirror of SBox the deformation position of the mode changes.

M2 was replaced with M2 spare of SBox 

images of the mirror front side attached before and after cleaning, no spots at the center, but there seems to be 2 spots far from the center
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics TM00_mode.jpgTM01_mode.jpgTM10_mode.jpg
M2 Sbox changed to spare. Alignment of M2 was redone. 

With the help of Ronic , We observe fundamental mode of the cavity with higher order modes. A frequency scan on the piezo was done to find the
beating frequency , the shape is elliptical with no clear deformation.
    Reply   Spincoater - Mirrror cleaning , posted by Manar Amer at Optical room about lasers and optics | utilities 
While repeating the alignment, the mirrors were cleaned using the spin-coater and placed again.

The current mirrors placed in the SBox are

M1 plane injection from Gamma factory
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics 7x
The external and internal alignment was redone.

External Alignment : the collimator position moved so in order to have a good start I placed 2 metallic mirrors and did a rough retrace of it's
line through the cavity box.
Entry   Fundamental Mode TEM00, posted by Manar Amer at Optical room about lasers and optics 20220524_SBox_Setup.png00mode_CW_piezo_drive.bmp00mode_11mode.bmp
The current setup for the SBox has a beam viewer and 2 photodiodes placed at reflection and transmission.

The CW laser piezoelectric crystal was driven using the lase lock system to observe the 00 mode.

Mode Observed and has no reflection (from what was previously seen)
    Reply   Fundamental Mode TEM00, posted by Manar Amer at Optical room about lasers and optics beamviwer_transmission_at_M3.bmpbeamviwer_transmission_at_M4.bmp
Adding images from the transmission after the spherical mirrors M3 and M4 window for a resonating mode inside the cavity.

There appears to be some misalignment from the center of the mirror ???

 
    Reply   SBox Alignment , posted by Manar Amer at Optical room about lasers and optics 
Closing Series for Alignment.

Beating observed, beam is in the locking stages

 
    Reply   Fundamental Mode TEM00, posted by Manar Amer at Optical room about lasers and optics 20220530_00_Mode.bmp00_Mode_Beam_Transmitted_Position_drift_due_to_temperature.bmp
Images of the Transmitted beam at M2 mirror at different days. 

The first one was from last week, the second from yesterday.

There is misalignment (drift due to temperature) from the position where the beam was initially. ( reference taken between centers of mode and
Entry   Cavity Lock , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software Screenshot_2022-05-30_0_125247.png20220530_00_Mode.bmp11.bmp
Start with the cavity lock images attached, taken from last week, at start we have a coupling ~ 5%  and started improving on the
alignment .

The image of 00 modes attached corresponds to the coupling seen on the oscilloscope.
Entry   Telescope - Spacial Matching , posted by Manar Amer at Optical room about lasers and optics SBox_Spacial_Matching_Telescope.png
Divergence of the CW beam out of the collimator measured after 1 meter to be 


2 x = 0.7425  mrad  --> x = 0.37125  mrad
    Reply   Cavity Lock , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 20220607_SBox_Setup.pngMa1_Ma2_Horizontal_end-of-day.jpgMa1_Ma2_Vertical_end-of-day.jpg
Current setup at SBox for locking the cavity

After spacial matching, the coupling increased to ~ 15 - 20 % 

The locking was done for the fundamental mode, tried to improve the coupling with the motors, but the lock is very unstable to be investigated.
    Reply   Cavity Lock , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 00_Mode_Locked_Under_vacuum.bmpMa1_Ma2_Horizontal_end-of-day.jpgMa1_Ma2_Vertical_end-of-day.jpg
Cavity locked today under vacuum and no airflow, it is stable over a long time

the alignment was improved and an increase of the transmission by 20 % from its original value

unfortunately,  data from the oscilloscope was saved, but it was not in the correct format (image) to show.
Entry   Menhir Pulsed Laser, posted by Manar Amer at Optical room about mechanics | lasers and optics | detectors and electronics MENHIR_injection_into_fiber.jpgSBox_M.jpg20220620_SBox_MENHIR.pptx
The SBox Length (FSR), was changed to match the repetition rate of the Menhir pulsed laser Frep = 216.6625 MHz

It was changed by removing the 2 D-shaped mirrors placed between M1 and M2, distance between M1-M2 ~= 169 mm 

it was still needed to be adjusted with M1 motor to reach the correct FSR.
Entry   SBox Finesse at 216.6625 MHz, posted by Manar Amer at Optical room about lasers and optics | vacuum 20220624_SBox_MENHIR.pptx
The Sbox currently has the injection from ThomX installed T ~ 120 ppm , M2 planar from Sbox spare and M3 / M4 spherical mirrors from Sbox installed.

The last finesse measurement that was done gave a Finesse of ~ 19300 (After cleaning M2 using ethanol + aceton + pure water)

on Friday the whole optical table was cleaned again and the inside of the box was cleaned (even with a lot of dust inside the box the Finesse