Entry   M1 transmission measurement, posted by Loïc Amoudry at Optical room about lasers and optics 
Center of M1:




I (A)
Input power (mW)
Transmitted
power (mW)
Transmission (ppm)


0
78
0.01477
189


4
16500
3.2
194


Entry   Change of the 3 ULE mirrors by 3 spare ULE mirrors, posted by Loïc Amoudry at Optical room about lasers and optics Miroirs_à_1031_nm-ThomX_-_décembre2017.pdfvacuum.isf
First finesse measurement 20 266, FSR 133.351 MHz under vacuum
Entry   M4 transmission measurement, posted by Loïc Amoudry at Optical room about lasers and optics 
The kept transmission for M4 is 2.17 ppm. Which is the value measured after alignement (center of the mirror).

These measurements have been taken before alignement.




I (A)
Input power (mW)
Transmitted
    Reply   M4 transmission measurement, posted by Loïc Amoudry at Optical room about lasers and optics 



Loïc
Amoudry wrote:



The kept transmission for M4 is 2.17 ppm. Which
is the value measured after alignement (center of the mirror).
    Reply   M1 transmission measurement, posted by Loïc Amoudry at Optical room about lasers and optics 
At different positions, transmission give 194, 193, 208, 200 ppm?




Loïc
Amoudry wrote:



Center of M1:
Entry   First run with spare mirrors, posted by Loïc Amoudry at Optical room about lasers and optics Plot_power_and_gain_vs_all.JPGpowerup.xlsx



I (A)
Trans (mW)
Coupling (%)
Pin
(W)
Gain


0
4
Entry   Mirrors cleaning, posted by Loïc Amoudry at Optical room about lasers and optics 
The new mirrors didn't give expected results. Then the 4 old mirrors have been sent to LMA on 12/11/18 for a cleaning and caracterization before
and after cleaning. Also asked for a diffusion/absorption map on the mirrors if possible. They didn't really answered on what will they do. 
Received on 13/11/18 by LMA.
Entry   Mirrors features, come back from LMA, posted by Loïc Amoudry at Optical room about lasers and optics 181201_caracteristiques_miroirs.PNG20181207_155704_resized.jpg20181207_155726_resized.jpg
Mirrors arrived today from LMA. Their features are damaged.

Photos avant ou après nettoyage, pas clair dans le mail de Laurent : 

"J'ai commencé à nettoyer M1 et M2 avec notr methode habituelle et je me suis aperçu que sur la partie centrale
Entry   Deposit on S-box mirrors after return from LMA, posted by Loïc Amoudry at Optical room about lasers and optics 28_M2ReflectiveBeforeCleaning_compressed.jpg29_M2ReflectiveAfter1stCleanPaper_compressed.jpg
Cleaning on dirty surface shows something is deposited on the surface. Cleaning displaces and removes part of the deposit.
Entry   Impacts on mirror's surface, posted by Loïc Amoudry at Optical room about lasers and optics 18_M1reflectiveface2x_compressed.jpg
All the mirrors show impacts on there surface (some of them do not show deposit). Does it come from experiments or fabrication ? Are these holes
or bumps ?
Entry   amplifier, posted by Huan Wang at Optical room about lasers and optics 1st_stage_amplifier_monitoring_photodiode_signal.jpg
Onefive output power is 24mW now, and 2.41mW(after EOM) injected into fiber,

a injection power monitor added, 99% (2.06mW)  injected into amplifier, 1% (16.1uW) monitored with photodiode DET36A/M, which
gives ~500mV DC signal on oscilloscope with 1Mohm impedanc;
    Reply   amplifier, posted by Huan Wang at Optical room about lasers and optics 
I just had a phone call with Jérome and he told me 2 things :

* Be carefull ! the MightyLaser amplifier is not designed to work with 33MHz laser : the streching level is not sufficient !
One could worsen the phase noise by self-modulation due to peak power or even distroy the amplifier !
Entry   Mirror's cleaning, posted by Loïc Amoudry at Optical room about lasers and optics resume_M3.PNGresume_M1_M2_M4.PNG
XPS has been proceeded on the 400kW SBOX mirrors M3 and M4 (the initial cavity spherical mirrors) in frebruary 2019. Deposited a lot of particles on
these mirrors.
All the mirrors received a Infrared spectroscopy the 12th of november 2019. Deposited glue on the non-reflective face (was used to hold them).
Entry   Mirror's installed, posted by Loïc Amoudry at Optical room about lasers and optics 
The initial 400kW SBOX mirrors which have been cleaned ont 28th of november have been installed this morning on the SBOX.
Entry   FSR and Finesse measurement, posted by Ronic Chiche at Optical room about lasers and optics untitled.png
Yesterday the cavity has been aligned and locked with the CW Koheras laser.

the FSR has been measured by modulation technique at 133.344MHz at 1mbar pressure in the cavity.

the polarization has to be optimized for the Finesse measurement otherwise, some "shoulders" appear beside the Airy peak and reduce
Entry   2nd stage amplifier issue, posted by Ronic Chiche at Optical room about lasers and optics 
the 2nd stage amplifier needed several hours (4-5h) to reach its nominal power (we look at photodiode level on a scope), instead of the awaited 30 minutes.

could it come from the probable spectrum shifting of the OneFive laser ?
(the power coming from the CVBG, coupled to the fiber, is lower than expected).
    Reply   2nd stage amplifier issue, posted by Ronic Chiche at Optical room about lasers and optics 
Last time, we switched ON directly the 2nd stage at 6A without increasing/decrinsing slowly the current.
today, we switched ON the chiller, switched ON the 1st stage, switch ON the power supply of the 2nd stage at 0A and then we increased slowly the
current until 6A... and the problem disappeared.
    Reply   2nd stage amplifier issue, posted by Ronic Chiche at Optical room about lasers and optics 
2nd stage output power was going down. We checked the pump diode technical data sheet and the operating temperature is [25°C:35°C].
We increased the chiller temperature setpoint from 19°C to 23°C. 
Then the output power increased (93mW on 2nd stage photodiode).
Entry   first data with 3A on the 3rd stage, posted by Ronic Chiche at Optical room about lasers and optics Screenshot_2019-12-13_3_184235.pngHOM.gif
Today, at 3A on the 3rd stage, we saw some HOM effects.
the transmissions is about 100mW which corresponds to 30kW inside cavity.
we tried to play with D shape motors but without success.
Entry   Beam size behind M2, posted by Ronic Chiche at Optical room about lasers and optics beam_diameter_behind_M2_-_1kW.pngbeam_diameter_behind_M2_-_30kW.png
Beam diameter behind M2 :

- 2nd stage @ 6A - 1kW inside cavity
sx = 2120 µm