    Reply   Cavity Lock , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 
Closing the series for the setup

The cavity was only locked @ 133.33 MHz but the Finesse was not measured

The FSR was changed to match the new laser MENHIR 216.6625 MHz 
    Reply   Fundamental Mode TEM00, posted by Manar Amer at Optical room about lasers and optics 
Closing series of 00 mode for FSR @ 133.33 MHz

 




Manar
    Reply   Divergence of the CW beam after collimator , posted by Manar Amer at Optical room about lasers and optics 
Closing the series of the telescope for the beam @ 133.33 MHz

 

 
    Reply   SBox Finesse at 216.6625 MHz, posted by Manar Amer at Optical room about lasers and optics | vacuum 
Max Finesse obtained @ 4 mirror setup was ~ 19 300  

With M1 from ThomX , M2/M3/M4 from SBox




Manar
    Reply   SBox Finesse at 216.6625 MHz, posted by Manar Amer at Optical room about lasers and optics | vacuum 
 




Manar
Amer wrote:



Max Finesse obtained @ 4 mirror setup was ~ 19 300  
Entry   2 Mirror Setup @ 216.6 MHz, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 20220706_Setup.jpgScreenshot_2022-07-06_1_181116.pngFinesse_Fit.jpg00mode.jpg00mode_diameter.jpg
The SBox cavity setup was changed to have only 2 mirrors M1 plane and M2 spherical, both from ThomX

Distance between the mirror ~ 72 cm , increased from 70 cm to take into account the thickness of the ThomX mirrors

Two lenses (300 mm @ 50 cm , 200 @ 104 cm) were placed to have the beam radius ~ 0.55 mm.
Entry   Images of ThomX mirrors , posted by Manar Amer at Optical room about lasers and optics ThomX_Spherical_Front_coating.jpgThomX_Spherical_2_Front_coating.jpgThomX_Spherical_back.jpg
Under the microscope,

the spherical mirrors show the deposit of metal dots on the reflecting surface and not on the back of the mirrors

The mirror with fewer spots near the center was used in the setup.
    Reply   Images of ThomX mirrors , posted by Manar Amer at Optical room about lasers and optics 
Mirror images in the previous log showing the metal deposit of the coating of the spherical mirrors

(not sent by mail due to large size of images)




Manar
    Reply   2 Mirror Setup @ 216.6 MHz, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 00mode.jpg00mode_diameter.jpgScreenshot_2022-07-08_0_164115.pngSlide1.JPGSlide2.JPG
The cavity was realigned using irises instead of pinholes, gave a better alignment.

The inside of the box, the spherical and the injection mirror were cleaned and placed back inside the box.

we see beating of fundamental mode, previously at the transmission point we placed a wedge to split the beam which resulted in an elliptical
    Reply   2 Mirror Setup @ 216.6 MHz, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics Screenshot_2022-07-08_2_182405.png
Update for Finesse measurement, The cavity was put under vacuum ~ 1.1*10^-1 mbar

and the alignment and coupling improved.

FSR = 210.1 MHz
    Reply   FSR change & Finesse Measurements , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 00mode.jpg00mode_diameter.jpg00mode_diameter_fit.jpg
The FSR of the 2 mirror (plan-spherical) Cavity was adjusted from 210 MHz to reach 216.643 MHz

it was done by having two reference irises, one at the injection point and one at the reflection 

then changing the position of injection plan mirror to slightly closer distance and monitoring the reflection on the oscilloscope to be max.
    Reply   FSR change & Finesse Measurements , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics Screenshot_2022-07-11_1_204143.pngScreenshot_2022-07-11_0_203646.png
Yesterday evening the cavity was Vacuum pumped up to pressure of 5.5*10^-2 and locked 

changed FSR to be 216.662 MHz and alignment a little and measured the Finesse

in Vacuum we have average Finesse = 30341.6265
    Reply   FSR change & Finesse Measurements , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 
a Finesse of 30k with the present mirrors :

T1=120 ppm ;A1=(2.6+1) ppm;
T2=1.5 ppm ;A2=(4.5+0.27) ppm;
    Reply   Installation of D-shaped mirror / Alignment, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 
To prepare for the amplifier. I installed the D-shapped mirrors after cleaning (using aceton and ethanol) between the cavity 2 mirrors.

Before closing, I observed the back reflection from M1 (injection mirror). both the injection and reflection lines were off, due to that there
was an internal reflection hitting the walls of the cavity.
Entry   CELIA amplifier installation, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 
The amplifier was installed on the optical table next to SBox table.

The CVBG that will be used for stretching before amplification needs cleaning (they are very fragile, 'ask victor for best method')

The software to drive the diodes of the amplifier we have is not the compatible one.
    Reply   CELIA amplifier installation + chiller, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software WhatsApp_Image_2022-07-22_at_4.26.24_PM.jpgWhatsApp_Image_2022-07-22_at_4.26.24_PM.jpgWhatsApp_Image_2022-07-22_at_5.02.24_PM.jpg
Amplifier placed next to the pulsed laser on the table under the airflow

The output is in free space with height from the table of about 10 cm, note the injection height into the cavity is between 14 - 15 cm.

a power cable is placed but not plugged.
    Reply   Installation of D-shaped mirror / Alignment, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 
The D-shaped mirrors are installed properly and not cutting the path of the beam.

The cavity has been aligned again and 00 modes beating observed, and external reference points has been placed.




Manar
Entry   Alignment / Table setup , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 20220722_table_setup.jpg20220722_tablesetup.jpg
The current setup of the optical table attached.

The cavity is aligned and the lock of the fundamental mode has been attempted, but the mode is drifting too quickly to be able to follow.

I have placed the cavity under vacuum for a better stability.
Entry   CVBG stretching / Fiber Injection , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 7x
Before injecting into the amplifier, the pulse needs to be stretched using a CVBG, type attached.

the CVBG is to be used at a small angle, the beam shape and spectrum after the PBS is attached.

After measuring the beam profile, a mirror was placed to direct all the power for fiber injection
    Reply   CELIA amplifier installation + chiller, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 
The software to control the CELIA amplifier is on the laptop that was placed in ThomX bunker.

I have placed it in the PLIC room next to the SBox table.

it is called 'Alphanov Control Software'