VM, IC, DN, RC; Interaction region studies 6x
|
Goals: Optimization of the IP. Verification of the llaser waist position and electron
beam angle wrt. collision plane.
08h25 ThomX was started; Modulator, Frig, Laser |
MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025; 
|
08h15 ThomX was started; Modulator, Frig, Laser
08h21 Chillers were started, cycling all magnets
09h40 HV is 'ON' |
IC, DN, RC, HG, ME; Improve ring for X-rays 7x
|
Goal: Vertical orbit and angle at the IP with I3 and I4 X-ray signals
8h55 Switch ON the modulator and all the machine
Camera SST2 : impossible de changer le temps d'expo |
KD, IC, VM; shift du 1e octobre 2025
|
7h40: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage)
==> IHM cyclage très longue à lancer, (a planté hier, pas aujourd'hui), des nan apparaissent (cf. screenshot)
08h45 Start modulator |
Entered by Super Team from 134.158.195.141 on Fri Dec 5 08:31:45 2025;
|
08h31 Warm-up ThomX: Modulator, Laser, Fridge
08h36 Chillers were started, cycling all magnets.
10h07 HV is ON |
VM, IC; Check of the 70 MeV with MRSV, Ring studies    
|
08h40 Warm-up ThomX: Modulator, Laser, Fridge
8h45 Chillers were started, cycling all magnets.
10h10 HV is ON |
IC, VM;  
|
7h50: mise en chauffe en remote (chillers/frigo, modulateur, cyclage)
08h57 HV is on
09h22 Beam is in the ring W/O RF, recipe_recipe_LI_TL_RI_all_20260219_13_17_17.txt loaded |
Entered by Super Team from 127.0.0.1 on Fri Jul 17 08:20:39 2026;
|
08h15 Start-up modulator, laser, fridge, chillers, cycling remotly
09h20 HV ON
board 0 Mean/1e3: 6016.12427481845 |
Entered by Super Team from 134.158.195.141 on Fri Sep 23 08:39:36 2022; Shift du 23/09/2022 6x
|
AM :
État a l'arrivé :
8h30 : Victor dans la casemat en accès controlé/mode maintenance canon pour faire des tests sur le chutter Laser |
ND, IC, VK, VM; Shift àf 3/11/2022 9x
|
9:10 Air pressure: 8 bars, water resistivity 6,33Mohm
9:15 Modulator warm-up
9:20 Ronde zone modulateur |
ND, VC; Intervention synchro
|
9:55 Intervention synchro en cours pour regler l'ajustement de la phase et la puissandce de la cavite RF.
16:15 Fin intervention synchro: Control de la puissance et de la frequence possible. Controle de la phase manuel seulement suite a changement
config. Dephaseur pilote a acheter. |
Entered by Super Team from 134.158.195.141 on Fri Dec 9 11:07:40 2022; 
|
Phase Qmax = 138
Phase Emax = 88
energy jitter |
ND, SC, VM, VK; Prise de donnee 5/01 8x
|
9h15 Mise en chauffe modulateur
9h30 Fin ronde casemate
9h40 Resisivite eau B18: 4.71 |
ND, IC, VK, VM; Prise de donnee 6/01 9x
|
9:15 Mise en chauffe modulateur
10:23 Temperature chiller incorrecte
11h Optilization of the beam for injection. Beam is unstable, what is seen fro, the x/y position trends in the TL. Then, from time to time the |
IC, VM, ND, VK; Prise de donnee 10/3/2023 7x
|
9h20 Start modulator, cycle magnets
10h20 Intevention Vincent sur PA
10h40 Scan charge phase |
ND,DN,SC,NE, EM; Quart collectif 25/4
|
9h10 (ND): Mise en chauffe modulateur et laser
9h15 mise en chauffe Chiller (SC)
Démarrage MPS (DN,SC,NE) : |
ND, LS, IC, VM, VK; Prise de donnee 27/4/2023 10x
|
9:19: Mise en chauffe
10:24 Cycling magnets
10:50 Demarrage faisceau |
NC,IC, VM,lS;  
|
9:10 warm up modulator
10:30: cycling of magnets
10:20 : scan charge phase |
LS, MB, VC, ND; Programme prise de donnees 8/06   
|
9:23 Mise en chauffe
Nombreux pb vide dans health check
Acces casemate pour verification polarite RI-C2/DG/BPM.02 pas de probleme trouve. |
LS, ND; shift du 29 juin 2023
|
9:45 Git pull
Test des interfaces... OK
Probleme sur les ecrans du compte operateur ThomX (4x1 ecran) meme apres redemarrage => reconfiguration |