Entry   VM, IC, DN, RC; Interaction region studies 6x
Goals: Optimization of the IP. Verification of the llaser waist position and electron
beam angle wrt. collision plane.

08h25 ThomX was started; Modulator, Frig, Laser
Entry   MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025;  ThomX_PhaseChargeScan20250606.pngThomX_FPC_TableVerticalScan20250606.png
08h15 ThomX was started; Modulator, Frig, Laser

08h21 Chillers were started, cycling all magnets

09h40 HV is 'ON'
Entry   IC, DN, RC, HG, ME; Improve ring for X-rays  7x
Goal: Vertical orbit and angle at the IP with I3 and I4 X-ray signals

8h55 Switch ON the modulator and all the machine

Camera SST2 : impossible de changer le temps d'expo 
Entry   KD, IC, VM; shift du 1e octobre 2025 Capture_d’écran_2025-10-01_074548_IHM_cyclage.png
7h40: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage)

==> IHM cyclage très longue à lancer, (a planté hier, pas aujourd'hui), des nan apparaissent (cf. screenshot)

08h45 Start modulator
Entry   Entered by Super Team from 134.158.195.141 on Fri Dec 5 08:31:45 2025;  
08h31 Warm-up ThomX: Modulator, Laser, Fridge

08h36 Chillers were started, cycling all magnets.

10h07 HV is ON
Entry   VM, IC; Check of the 70 MeV with MRSV, Ring studies Screenshot_from_2025-12-12_14-02-43.pngScreenshot_from_2025-12-12_14-02-27.pngScreenshot_from_2025-12-12_14-02-14.pngScreenshot_from_2025-12-12_14-02-02.pngScreenshot_from_2025-12-12_14-01-35.png
08h40 Warm-up ThomX: Modulator, Laser, Fridge

8h45 Chillers were started, cycling all magnets.

10h10 HV is ON
Entry   IC, VM;  Screenshot_from_2026-02-20_16-34-18.pngScreenshot_from_2026-02-20_16-15-37.pngScreenshot_from_2026-02-20_12-00-27.png
7h50: mise en chauffe en remote (chillers/frigo, modulateur, cyclage)

08h57 HV is on

09h22 Beam is in the ring W/O RF, recipe_recipe_LI_TL_RI_all_20260219_13_17_17.txt loaded
Entry   Entered by Super Team from 127.0.0.1 on Fri Jul 17 08:20:39 2026;  
08h15 Start-up modulator, laser, fridge, chillers, cycling remotly

09h20 HV ON

board 0  Mean/1e3:  6016.12427481845
Entry   Entered by Super Team from 134.158.195.141 on Fri Sep 23 08:39:36 2022; Shift du 23/09/2022 6x
AM :


État a l'arrivé :

8h30 : Victor dans la casemat en accès controlé/mode maintenance canon pour faire des tests sur le chutter Laser
Entry   ND, IC, VK, VM; Shift àf 3/11/2022 9x
9:10 Air pressure: 8 bars, water resistivity 6,33Mohm

9:15 Modulator warm-up

9:20 Ronde zone modulateur
Entry   ND, VC; Intervention synchro 
9:55 Intervention synchro en cours pour regler l'ajustement de la phase et la puissandce de la cavite RF.

16:15 Fin intervention synchro: Control de la puissance et de la frequence possible. Controle de la phase manuel seulement suite a changement
config. Dephaseur pilote a acheter.
Entry   Entered by Super Team from 134.158.195.141 on Fri Dec 9 11:07:40 2022;  Screenshot_from_2022-12-09_16-53-05.pngScreenshot_from_2022-12-09_16-52-44.png
Phase Qmax = 138

Phase Emax = 88

energy jitter
Entry   ND, SC, VM, VK; Prise de donnee 5/01 8x
9h15 Mise en chauffe modulateur

9h30 Fin ronde casemate

9h40 Resisivite eau B18: 4.71
Entry   ND, IC, VK, VM; Prise de donnee 6/01 9x
9:15 Mise en chauffe modulateur

10:23 Temperature chiller incorrecte

11h Optilization of the beam for injection. Beam is unstable, what is seen fro, the x/y position trends in the TL. Then, from time to time the
Entry   IC, VM, ND, VK; Prise de donnee 10/3/2023 7x
9h20 Start modulator, cycle magnets

10h20 Intevention Vincent sur PA

10h40 Scan charge phase
Entry   ND,DN,SC,NE, EM; Quart collectif 25/4 
9h10 (ND): Mise en chauffe modulateur et laser

9h15 mise en chauffe Chiller (SC)

Démarrage MPS (DN,SC,NE) :
Entry   ND, LS, IC, VM, VK; Prise de donnee 27/4/2023 10x
9:19: Mise en chauffe

10:24 Cycling magnets

10:50 Demarrage faisceau
Entry   NC,IC, VM,lS;  ring_storage_quality__2023_05_25_15_10_phase_scan_frm_1000_atx300_to_2500_at_x360.pngring_storage_quality__2023_05_25_15_31_phase_scan_from_0_atx300_to_250_atx3230_30kV.pngring_storage_quality__2023_05_25_15_39_phase_scan_from_0_atx4320_to_2500_atx4470_35kV.png
9:10 warm up modulator

10:30: cycling of magnets

10:20 : scan charge phase
Entry   LS, MB, VC, ND; Programme prise de donnees 8/06 health_check_2023_06_08_09_30.pnghealth_check_RF_2023_06_08_09_30.pnghealth_check_Vide_2023_06_08_09_30.pnghealth_check_Alimentation_2023_06_08_09_31.png
9:23 Mise en chauffe

Nombreux pb vide dans health check

Acces casemate pour verification polarite RI-C2/DG/BPM.02 pas de probleme trouve.
Entry   LS, ND; shift du 29 juin 2023 
9:45 Git pull

Test des interfaces... OK

Probleme sur les ecrans du compte operateur ThomX (4x1 ecran) meme apres redemarrage => reconfiguration