HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX  Not logged in ThomX    logo
This is a draft message, edit and submit it to make it permanent  
Message ID: 1142     Entry time: Fri Oct 24 08:33:30 2025
 Author: Entered by Super Team from 134.158.195.141 on Fri Oct 24 08:33:07 2025 
 Status: Under Process 
 Type: Shift summary 
 Category:  
 Important:
 Subject:  
 Icon:  

08h32 Warm-up ThomX: Modulator, Laser, Fridge

08h37 Chilers were started, cycling all magnets

09h38 HV is ON

The receipt loaded: recipe_recipe_LI_TL_RI_all_20251023_14_56_13

10h16 The beam is in the ring. RF Gun phase 233 dg., Sect. phase is 200 dg., Att. 2.34 dB,  linac steerers: H [0.75 -2.98], V [-2.63 3.25], Charges: -101, -100, -102 -102 pC (from BPMs), TL/BPM02 X= -3, RF cavity 100 kV, phase 14 dg.

11h18 Laser feedback was reset.

phases were reset RF Gun 256 dg. Sect. 211 dg. RF Cav. 9.5 dg.

Scanning TL/QP3 at QP1=QP2 = 0

Scanning TL/QP3 at QP1= -0.17 A, QP2 = 3.5 A

Scanning TL/QP1 at QP2=QP3 = 0

 

 