08h15 ThomX was started; Modulator, Frig, Laser
08h21 Chillers were started, cycling all magnets
09h40 HV is 'ON'
Scans of phase charge were performed
10h22 Beam in the ring, receipt from 20250605_17_33_45. Linac steerers: H [0.36 -2.55], V [-2.36 2.66], Phases: RF Gun 165 dg., Sect. 214 dg., Sect Att. 2.6, TL/BPM2 X=0, Charges (BPMs): -114 pC, -113 pC, -125 pC, -125 pC
MRSV: Hor. Std = 19.2812 pix, Vert. Std = 13.8814 pix
11h40 Going to 70 MeV. Sect. Att. 0.228, Phase 237 dg., RF Gun Phase 150 dg.
At F RF cavity 500.0328 MHz interlock on water cooling. Fixed by JN.
Trying to find horizontal tune.
At 70 MeV the MRSV camera saturated.
Work on the orbit correction.
Vertical scan with FPC. Sigma _y =
The receipy is saved and can be used for the spectrum measurements. Further studies to be continued if needed.
FPC Table Vertical Scan: sigma Y =132 um
17h02 Stop ThomX |