Message ID: 1149     Entry time: Wed Nov 12 10:29:49 2025
 Author: Entered by Super Team from 134.158.76.9 on Wed Nov 12 10:29:34 2025 
 Status: Under Process 
 Type: Shift summary 
 Category: LI | TL | Ring 
 Important:
 Subject:  
 Icon:  

15h09 Cycling all magnets

15h12 HV is ON

15h15 The modulator was set to standby

15h34 HV is ON

Tests on Ring + Streak camera to measure the bunch length. Triggering was not perfect (many jumps, even with help from Daniele)

Laser charge is now lowered (max around 300 pC) , should be realign soon.

18:40 stop