831
|
Thu Jan 18 00:11:51 2024 |
VK,VM,IC,ND | | Shift summary | LI | TL | LE | Diag |
|
Operations 18/1 | | 9:05 Git pull
9h14: Demarrage modulateur
10h22 Client 3 does not respond; |
10x |
|
832
|
Tue Jan 23 17:23:32 2024 |
JNC/CB | | Linac | LI | TL | LE |
|
run du 23/01/2024 en cours | | Iris ajusté à 1.1, image
enregistrée à 17h20 dans le
répertoire laserPb autorisation de |
|
|
835
|
Fri Jan 26 09:36:01 2024 |
ND, Anna K, Elene K | | Shift summary | LI | TL | LE |
|
Data taking 26/01 | | 9:30 Warm-up
11:00 Modulator OFF => restart
warm-up |
7x |
|
845
|
Fri Feb 23 09:05:28 2024 |
SC/JNC | | Linac | LI |
|
redemarrage linac apres elongation anneau | | 9h05 Mise en chauffe modulateur et refroidissements
temperature consigne canon = 31.75 degres
temperature consigne section = 29.5 degres |
|
|
849
|
Thu Feb 29 16:27:53 2024 |
CB/JNC | | Shift summary | Linac Commissionning |
|
shift linac 29/02/2024 | | changement de quelques paramètres
: att laser 410 au lieu de 350, iris 0.9
au lieu de 1.3 |
|
|
858
|
Tue May 14 17:50:45 2024 |
Entered by Marie Jacquet from 134.158.89.45 on Tue May 14 17:50:15 2024 | | Ligne X | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Camera PILATUS: instructions to use | | |
|
|
859
|
Wed May 15 10:52:19 2024 |
Entered by Super Team from 134.158.195.141 on Wed May 15 10:51:59 2024 | | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Conditionnement section | | sortie PA 120W ---> pas assez pour obtenir
la puissance nominale Klystron, sortie puissance
PA devrait etre autour de 400 W |
|
|
868
|
Fri May 24 14:53:09 2024 |
ND | | Info | RF D1 |
|
Notifications sonores changement d'etat klystron | | Ajout d'un systeme de notification
sonore sur client1 quand le klystron change
d'etat. |
 |
|
880
|
Thu Jun 27 16:14:38 2024 |
Entered by Super Team from 134.158.195.141 on Thu Jun 27 16:14:24 2024 | | Linac | LI | RF D1 |
|
Tests reseau RF | | Charge en sortie diviseur cote section
HT = 1220V (35MW), 10Hz , 3us
Attenuateur cote canon 30 dB |
|
|
881
|
Fri Jun 28 14:37:19 2024 |
Entered by Super Team from 134.158.195.141 on Fri Jun 28 14:37:07 2024 | | Linac | LI | RF D1 |
|
Tests reseau RF : branche attenuateur | | charge en position après atténuateur,
10Hz, 3us, 1220V
Ca claque à 15dB et 10dB, |
|
|
889
|
Tue Jul 23 17:43:23 2024 |
MJ | | Linac | LI |
|
Trends - conditionnement section 23 juillet | | Je viens de sauvegarder les trends conditionnement
d'aujourd hui dans data/shared du jour |
|
|
895
|
Thu Aug 1 08:43:29 2024 |
Iryna, Sophie, Viktor, Slava | | Shift summary | Linac Commissionning |
|
conditionnement de la section RF@ 3µs & 25 Hz | | 8h40 Warm-up the modulator
***
reprise de conditionnement @ 3µs |
14x |
|
897
|
Mon Aug 5 10:50:06 2024 |
Entered by Super Team from 134.158.195.141 on Mon Aug 5 10:49:42 2024 | | Linac | LI | RF D1 |
|
Suite conditionnement section | | 10h50 Mise en route à 10dB, HT =
1000V
11h04 HT = 1215V, Att sec 3 dB |
|
|
898
|
Tue Aug 6 09:57:48 2024 |
Entered by Super Team from 134.158.195.142 on Tue Aug 6 09:57:28 2024 | | Linac | LI | RF D1 |
|
Commissioning section accélératrice | | 9h58 Démarrage Att sec 10dB 3us
25Hz HT = 1200V
On augmente progressivement la |
|
|
899
|
Thu Aug 8 10:12:35 2024 |
Entered by Super Team from 134.158.195.142 on Thu Aug 8 10:12:02 2024 | | Linac | LI | RF D1 |
|
conditionnement section | | Remplissage SF6 de 2.3 bar à 2.5
bar par Christopher
10h08 : augmentation progressive |
|
|
900
|
Fri Aug 9 10:01:23 2024 |
Entered by Super Team from 134.158.195.142 on Fri Aug 9 10:01:08 2024 | | Linac | LI | RF D1 |
|
conditionnement section | | Vide de démarrage apres l'allumage
des chillers : in section 6.4e-10 et out
section 8.3e-10 |
|
|
906
|
Tue Sep 3 09:25:05 2024 |
SC, KD, HG MJ | | Linac | Linac Commissionning |
|
Alignement laser et section + Mesures | | 9h Mise en chauffe modulateur et chiller,
reseau rf rempli de sf6 de 2.2 bar à
2.6bar |
|
|
909
|
Tue Sep 10 08:47:55 2024 |
SC, HG, MJ | | Linac | Linac Commissionning |
|
Alignements : LASER - SOLENO - SECTION | | 8h47 Mise en chauffe modulateur et chillers
- Phase Q max : 161 deg
|
 |
|
911
|
Wed Sep 11 12:30:52 2024 |
Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 11 12:30:36 2024 | | Shift summary | Linac Commissionning |
|
tableau alignement section - v2 | | |
|
|
915
|
Mon Sep 16 23:59:24 2024 |
Entered by Marie Jacquet from 134.158.205.56 on Mon Sep 16 23:59:00 2024 | | Shift summary | Linac Commissionning |
|
alignement section de lundi 16/09 | | Alignement section, bilan du jour :
En partant de
Li/STR1 [H,V] : [0.93 , -0.9] |
|