ID Date Author Statusdown Type Category Important Subject Icon Text Attachments
  1045   Fri Mar 21 17:57:40 2025 Entered by Marie Jacquet from 134.158.89.45 on Fri Mar 21 17:57:25 2025 Shift summaryLinac Commissionning | Ring Commissioning 21 mars - Mesures X-rays - Bravin & co Det
Photonic fond de la X-hutch


Tomo : un
  
  1046   Fri Mar 28 14:27:01 2025 Entered by Super Team from 134.158.195.141 on Fri Mar 28 14:26:38 2025 LinacLI Prep faisceau pour lundi 12h47 Mise en chauffe modulateur

Zone de stockage en rouge

Mise en route frigo, chillers :
  
  1064   Fri May 2 17:47:18 2025 Entered by Marie Jacquet from 134.158.89.45 on Fri May 2 17:47:04 2025 Shift summaryLinac Commissionning | Ring Commissioning Commissioning Spectro Vortex/FalconX 1) Setup (pj 1) : petite sphere "jaune"
devant le vortex (je ne sais pas en quoi
elle est faite, peut-etre un laiton ...)
 setup.jpeg20250502_Pulse_charac_Capture.PNG20250502_acquisition_Capture.PNG 
  1074   Wed May 21 12:16:11 2025 MJ HG Shift summaryLinac Commissionning Axes Q1Q3 et Section apres chang cathode iris 0.5
100 pC
ph ch max 259
 Sole_Align.png 
  1077   Fri May 23 18:54:22 2025 Entered by Marie Jacquet from 134.158.89.45 on Fri May 23 18:54:08 2025 Shift summaryLI | Ring Spectro Si VORTEX : Calibration Le spectro Si (vortex/falconX) a ete calibre
avec une feuille d'etain

Calib checkee avec une feuille
 2025-05-23_17-46-30-VORTEX_Sn_Au.png 
  1087   Wed Jun 11 08:46:58 2025 Entered by Marie Jacquet from 134.158.205.17 on Wed Jun 11 08:46:44 2025 Shift summaryLI | Ring 2025-06-04 Fluo-spectro : Spectre du 2025-06-04    spectres_20250604.pdf 
  1092   Tue Jun 24 18:33:20 2025 Entered by Marie Jacquet from 134.158.205.58 on Tue Jun 24 18:33:05 2025 Shift summaryLI | TL | LE | Ring Spectres Bazin - Config "cone en plomb" - + enregistrement trends parametres machine (e- et X) *** Spectres
des 4 Echantillons Bazin + Backgroung avec
:
 10x 
  1095   Fri Jun 27 08:49:36 2025 SC, ND LinacLI | Linac Commissionning   8h49 allumage modulateur, chiller, laser

10h00 Beam ON

Prise de données Cf images
 pos_TL2_vs_phase_RF.pngpos_TL2_spX_vs_temp.pngtp2spX_vs_time.png 
  1099   Fri Jul 4 12:02:34 2025 ND Shift summaryTL Prise donnees 4/7 Les aimants et les chillers etaient restes
allumes.

11h59 Mise en chauffe
 temp_vs_time.pngtp2spX_vs_time.pngtp2spY_vs_time.pngpos_TL2_spX_vs_temp.png 
  Draft   Thu Sep 11 08:49:20 2025 IC, VM  Ring BBA 08h50 Warm up of the modulator   
  Draft   Thu Sep 11 11:12:36 2025 IC, VM  Ring BBA 8h50 Thomx warmup

10h20 HV is 'ON'

RF Gun phase is 254 dg. Sect phase
 Screenshot_from_2025-09-11_12-57-22.pngScreenshot_from_2025-09-11_17-36-53.pngScreenshot_from_2025-09-11_17-47-30.png 
  1129   Fri Sep 26 09:01:14 2025 ND Shift summaryLI | Diag Verifications IHM_cyclage 9:00 Accès pour FPC

Recherche des problemes de plantage
de l'IHM cyclage.
  
  1135   Fri Oct 10 09:20:34 2025 ND, VM Shift summaryDiag | SY Prise de données 10/10  9:00 Mise en chauffe

9:20 Intervention de deux personnes
de Dalkia dans l'igloo. 
 7x 
  1139   Fri Oct 17 09:07:03 2025 MO VC ND VM Shift summaryLI | TL | LE | Linac Commissionning Shift summary demarrage machine 8H35
9H45 hV on 1215V
Q linac 100pC
  
  Draft   Tue Oct 21 12:29:35 2025 HG, DN. VM, MJ      11h40 Thomx warm-up

12h35 HV is ON

12h40 HV 1215 V
 mrsv_2_positions_fente.png 
  Draft   Wed Nov 5 12:50:55 2025 Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025      Matin :

Soucis synchro :
- Nicolas les a redémarré
 Screenshot_from_2025-11-05_17-49-33.pngScreenshot_from_2025-11-05_17-51-14.pngScreenshot_from_2025-11-05_17-50-44.png 
  1162   Thu Dec 4 08:59:07 2025 Entered by Super Team from 134.158.195.141 on Thu Dec 4 08:58:52 2025 Shift summaryLI | TL | Ring Preparation/check of the 70 MeV WP for X-ray run Goal: preparation and checking the machine
operation at 70 MeV and 40 MeV (ideally with
X-rays)
 Screenshot_from_2025-12-04_16-10-14.pngScreenshot_from_2025-12-04_17-38-20.pngScreenshot_from_2025-12-04_18-01-39_WITH_EL.png 
  1164   Fri Dec 5 14:48:46 2025 Marie Julien Hayg Sophie Shift summaryLI | TL | LE | Ring Matching ring-TL - Recherche des bons twiss pour la TL Programme
shift : etudes matching anneau-TL - Recherche
param twiss TL
 Screenshot_from_2025-12-05_18-26-56.png 
  Draft   Thu Dec 18 09:39:38 2025 DN, IC, HG, KD, MJ, and Co Shift summaryLI | TL | LE | Ring | Diag | Aimants | Laser | Vide | Linac Commissionning | Ring Commissioning X-ray measurement/characterization campaign The machine was warmed up remotemy

The FPC is ready. The laser is locked.

9h Start HV
 Q_missed_2025-12-18_13-50-19.png 
  1174   Mon Jan 5 10:35:58 2026 MJ Shift summaryLI | TL | LE | Ring shift twiss Q1 versus soleno Modulateur en chauffe
Alarme rendant impossible clim casemate
. Maher envoie un mail a urgencevc
  