Entry   HG, JM, ND; Prise de données 18/11 
9h Intervention laser

Intervention pour realignement el/dg/sst.01

11h Fin interventions demarrage machine
icon1.gif   HG + JM + ND (aprem); Shift mesure Twiss + Simu  7x
8:30 : demarrage à distance 
 

12:10 : QP7 Scan 1 (Phase section 210) optimum sur ligne dispersive 
Entry   VM, IC; BBA Ring Errors.jpegScreenshot_from_2025-11-20_14-04-53.png
Goal: Ring BBA

09h14 Unable to start thomx. Need help. Probably problem with cooling water.

12h35 
Entry   KD MJ DN Students; shift du 21 novembre 2025 IMG-20251121-WA0003.jpgIMG-20251121-WA0005.jpg20251121_185206.JPG
8h: mise en chauffe en remote (modulateur, frigo/chillers, laser, cyclage)
9h: start 
Recette chargée: 50MeV_100pC_MRSV_20251014_18_22_53
Entry   ND + JM + HG; Prise de données 24/11  
9:15 Mise en chauffe

9h30 Arrivée du SPR: testsSSI ce matin => pas de faisceau avant midi => machine off

12h30 Mise en chauffe,cyclage aimants
Entry   Entered by Super Team from 134.158.195.141 on Tue Nov 25 09:31:46 2025;  
09h31 Warm-up ThomX: Modulator, Laser, Fridge

09h36 Chillers were started, cycling all magnets.

09h56 Unable to start MRSV and EL cameras. Need help.
Entry   KD MJ VM DN RC; shift du 26 novembre 2025 8x
7h50: mise en chauffe à distance (frigo/chiller, laser, modulateur, cyclage)

11h13 Beam is in the ring, 50 MeV, RF gun phase 268 dg. ==> 272 dg., Sect. phase 211 dg., Sect. Att. 2.35 dB. Linac sreerers H [0.74 -2.98],
V [-2.56 3.0], Charges (BPMs) -112, -107, -112, -110 pA 
Entry   KD; shift du 27 novembre 2025 multi_disps.txtrecipe_recipe_LI_TL_RI_all_20251126_09_35_14.txtBeam_no_opt.tifBeam_opt.tifBPM_jitters.png
8h: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage)

9h30: Chargement de la recette : "recipe_recipe_LI_TL_RI_all_20251126_09_35_14.txt" pour référence

ajustement energie linac et phase cavité RF pour réduire l'oscillation synchrotron.
Entry   Entered by Super Team from 134.158.195.141 on Thu Dec 4 08:58:52 2025; Preparation/check of the 70 MeV WP for X-ray run Screenshot_from_2025-12-04_16-10-14.pngScreenshot_from_2025-12-04_17-38-20.pngScreenshot_from_2025-12-04_18-01-39_WITH_EL.png
Goal: preparation and checking the machine operation at 70 MeV and 40 MeV (ideally with X-rays)

8h54 Warming up
RF section 29.20 C -> 28.5 C
Entry   Entered by Super Team from 134.158.195.141 on Fri Dec 5 08:31:45 2025;  
08h31 Warm-up ThomX: Modulator, Laser, Fridge

08h36 Chillers were started, cycling all magnets.

10h07 HV is ON
Entry   Marie Julien Hayg Sophie; Matching ring-TL - Recherche des bons twiss pour la TL Screenshot_from_2025-12-05_18-26-56.png
Programme shift : etudes matching anneau-TL - Recherche param twiss TL

Valeurs ideales TL "de Julien" : betaX = 36   betaY = 36   alphaX = -4.5   alphaY
= -4.5  ( = figure of merit tres petit)
Entry   KD MJ RC DN; shift du 09 décembre 2025 - 70 MeV et 40 MeV 6x
8h : mise en chauffe en remote (modulateur, cyclage, frigo/chillers, laser)

Stockage 70MeV ok, le faisceau  MRSV semble gros en horizontal (cavité RF 250kV)

e-:
Entry   Entered by Super Team from 134.158.195.141 on Wed Dec 10 10:45:16 2025;  
8h30 : machine started on remote
50 MeV operation.
Problem with Yag-TL camera
Entry   VM, IC; 40 MeV operation 12x
8h37 Warm-up ThomX: Modulator, Laser, Fridge

8h44 Chillers were started, cycling all magnets.

9h49 HV is ON
Entry   VM, IC; Check of the 70 MeV with MRSV, Ring studies Screenshot_from_2025-12-12_14-02-43.pngScreenshot_from_2025-12-12_14-02-27.pngScreenshot_from_2025-12-12_14-02-14.pngScreenshot_from_2025-12-12_14-02-02.pngScreenshot_from_2025-12-12_14-01-35.png
08h40 Warm-up ThomX: Modulator, Laser, Fridge

8h45 Chillers were started, cycling all magnets.

10h10 HV is ON
Entry   KD MJ; shift du 15 décembre 2025 
8h: mise en chauffe en remote (chiller/frigo, laser, modulateur, cyclage)

* cannot enter to the ring with the recipe "40_MeV_Enough_Good_20251211_14_07_28", probably due to mis alignment procedure of the QP1-QP3.
* reset de TL steerers with the recipe "40MeV_20250401_15_09_50", first turn ok but no storage.
Entry   KD, IC, RC,VM ; shift du 16 décembre 2025 2025-12-16_08_30_21_tl_dg_sst_02-ccd_01_RAW.png2025-12-16_08_35_25_tl_dg_sst_02-ccd_01_RAW.png
7h10: mise en chauffe en remote (chiller/frigo, laser, cyclage, modulateur).

à cause du faible flux d'hier et de la non répétabilité des recettes de la semaine précédente :

* essaie avec la section à 28.4°C (seule condition différente de mardi dernier)
Entry   KD, IC, MV, DN,; shift du 17 décembre 2025 
7h15: mise en chauffe en remote (chiller/frigo, laser, modulateur, cyclage)

8h33 HV ON

09h30 Beam is in the ring 40 MeV, RF 100 kV ==> 150 kV I3+I4 up to 14000 pA. Vertical step at IP from -2 mm to +2 mm. MRSW 24.5 pix. Receipt  recipe_recipe_LI_TL_RI_all_20251217_09_17_49.txt
Entry   DN, IC, HG, KD, MJ, and Co; X-ray measurement/characterization campaign Q_missed_2025-12-18_13-50-19.png
The machine was warmed up remotemy

The FPC is ready. The laser is locked.

9h Start HV
Entry   KD; shift du 19 décembre 2025 
7h20: mise en chauffe en remote (frigo/chiller, laser, modulateur, cyclage)

 

*** Programme ***