Entered by Super Team from 134.158.195.141 on Thu Oct 2 08:31:43 2025;
|
08h30 ThomX warm-up
08h37 Cycling all magnets
10h20 HV is ON |
ND VC; Shift summary
|
Demarrage machine 9H
test cyclage: OK (relecture courant parfois NAN)
Correction des fenetre d'intégration de mesure de charge des ICTs |
Entered by Super Team from 134.158.195.141 on Thu Oct 9 08:37:29 2025; Shift "du Jeudi" : VM/HG/KD/DN/RC   
|
09h35 Warmup ThomX
09h40 Cycling all magnets
09h50 Start Chillers |
ND, VM; Prise de données 10/10 7x
|
9:00 Mise en chauffe
9:20 Intervention de deux personnes de Dalkia dans l'igloo.
9h30 Cyclage aimants |
Hayg; Emittance QP3
|
QP3 scan
vary Soleno
Iris 1mm ATT 400 (150 pC) |
KD; shift du 14 octobre 2025 8x
|
7h55: mise en chauffe en remote (laser, frigo/chiller, modulateur, cyclage)
==> Nouvelle interface de cyclage, on ne voit plus la progression ou l'état des éléments. (impossible de savoir si
le cyclage à bien fonctionné) |
KD, IC, VM; shift du 16 octobre 2025 6x
|
7h30: mise en chauffe en remote (chillers/frigo, laser, cyclage)
==> impossible de passer en Standby sur le modulateur ==> mail envoyé à Maher.
8h30 We inspected the modulator, made the rondes. The error (status 8 bit) remains. Need for help from Maher. problem: Modumator PSS. |
MO VC ND VM; Shift summary
|
demarrage machine 8H35
9H45 hV on 1215V
Q linac 100pC |
HG, DN. VM, MJ;
|
11h40 Thomx warm-up
12h35 HV is ON
12h40 HV 1215 V |
KD RC VC MJ; shift du 23 octobre 2025
|
7h45: mise en chauffe en remote (modulateur, laser, frigo/chillers, cyclage)
8h45 : mise en route Modulateur
recette "50MeV_smallorbit_with EL_20251016_19_49_25.txt" fichier VIDE |
Entered by Super Team from 134.158.195.141 on Fri Oct 24 08:33:07 2025;
|
08h32 Warm-up ThomX: Modulator, Laser, Fridge
08h37 Chilers were started, cycling all magnets
09h38 HV is ON |
Entered by Super Team from 134.158.195.141 on Tue Oct 28 08:40:06 2025;   
|
08h40 Warm-up ThomX: Modulator, Laser, Fridge
08h45 Chillers were started, cycling all magnets
09h45 HV is ON |
Entered by Marie Jacquet from 134.158.205.9 on Thu Oct 30 07:21:05 2025; Programme shift (X-rays spectres vs atte & phases)
|
08h17 Warm-up ThomX: Modulator, Laser, Fridge
08h24 Chillers were started, cycling all magnets
09h18 HV is ON |
Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025;  
|
Matin :
Soucis synchro :
- Nicolas les a redémarré |
Entered by Super Team from 134.158.195.141 on Thu Nov 6 08:30:37 2025; 
|
08h30 Warm-up ThomX: Modulator, Laser, Fridge
08h36 Chillers were started, cycling all magnets
09h33 HV is ON |
Entered by Super Team from 134.158.205.4 on Fri Nov 7 18:45:38 2025;  
|
08h34 Warm-up ThomX: Modulator, Laser, Fridge
08h40 Chillers were started, cycling all magnets
09h40 HV is ON but cannot trig because the interlock on low SF6 pressure. Assistance asked. |
KD, M2 GI; shift du 10 novembre 2025
|
8h: mise en chauffe en remote (modulateur, laser, frigo/chiller)
10h: Démarrage machine
|
Entered by Super Team from 134.158.76.9 on Wed Nov 12 10:29:34 2025;
|
15h09 Cycling all magnets
15h12 HV is ON
15h15 The modulator was set to standby |
KD MJ VM HG; shift du 13 novembre 2025 - spectres a differentes valeurs de bpmTL2_X
|
Apres que Kevin a regle tous les problemes synchro signal bpm etc etc etc
L'interface SST ne fonctionne pas - URGENT ==> probleme resolu
Libera 2 et 4 reboote une 2eme fois ... |
KD; shift du 18 novembre 2025
|
7h50: mise en chauffe en remote de la machine (laser, frigo/chiller, cyclage)
==> le modulateur ne répond pas aux commandes (il est peut être en local) ==> Ok le modulateur était bien en local
(Maher est intervenu) |