965
|
Thu Nov 21 08:27:15 2024 |
VM Entered by Super Team from 134.158.195.141 on Thu Nov 21 08:26:43 2024 | Under Process | Info | Ring Commissioning |
|
| | 08H25 Start ThomX
09H45 HV is 'ON'
09h49 Breakdown in the RF Gun |
| |
974
|
Thu Dec 5 08:31:34 2024 |
VM Entered by Super Team from 134.158.195.141 on Thu Dec 5 08:31:12 2024 | Under Process | Shift summary | Ring Commissioning |
|
| | 08h28 Start ThomX
08h40 Some magnets remain switched
off. Cycling was not performed |
| |
1176
|
Wed Jan 7 07:55:45 2026 |
VM DN MJ KD | Under Process | Shift summary | LI | TL | LE | Ring | Linac Commissionning | Ring Commissioning |
|
shift du 07 janvier 2026 | | 7h55: mise en chauffe en remote (modulateur,
frigo/chillers, laser, cyclage)
11h25 HV is ON |
16x | |
1191
|
Wed Feb 11 09:12:35 2026 |
VM && HG | Under Process | Shift summary | LI |
|
Linac commissioning | | 09h12 Warm-up ThomX: Modulator, Laser,
Fridge
09h21 Chillers were started, cycling |
  | |
1032
|
Tue Mar 11 14:31:06 2025 |
VM | Under Process | Shift summary | Linac Commissionning |
|
| | 14h31 Start ThomX/ Modulator, Frig, Laser
14h37 Cycling all magnets, Chillers
started |
9x | |
1044
|
Fri Mar 21 08:37:09 2025 |
VM | Not Fixed | Problem | LI | RF D1 |
|
Modulador problem | | 08h38 There is problem with the Linac modulator
08h55 Fixed with Maher help |
| |
Draft
|
Fri May 2 08:23:50 2025 |
VM | Under Process | Shift summary | Ring Commissioning |
|
| | 08h22 ThomX was started: modulator, frig,
laser
08h28 Chillers was started, all |
| |
Draft
|
Fri Mar 6 09:00:45 2026 |
VM | Under Process | Shift summary | |
|
| | 09h00 Warm-up ThomX: Modulator, Laser,
Fridge
09h05 Chillers were started, cycling |
| |
578
|
Thu Oct 6 10:18:03 2022 |
VK/ND/SC | | Anneau | Ring Commissioning |
|
Faisceau Anneau | | Modulateur Impossible à passer en
Standby ==> problème manque d'eau.
|
10x | |
831
|
Thu Jan 18 00:11:51 2024 |
VK,VM,IC,ND | | Shift summary | LI | TL | LE | Diag |
|
Operations 18/1 | | 9:05 Git pull
9h14: Demarrage modulateur
10h22 Client 3 does not respond; |
10x | |
748
|
Thu May 4 11:41:53 2023 |
VK, VM, IC, LS | | Shift summary | Ring Commissioning |
|
Restart storage in the Ring | | ~9h Start of the modulator
10h Tuning of the injector with
KD |
| |
790
|
Thu Aug 10 15:52:24 2023 |
VK, VM, IC, LS | | Shift summary | Ring Commissioning |
|
Work on the new ring lattice (August, 2-4) | | Starting point nominal lattice D1Thomx_017_064_r56_02_chro00
with the MCF=0.014 chro=0/0
Goal: test the new lattice with MCF=0.0231 |
13x | |
624
|
Fri Nov 4 18:28:58 2022 |
VK, VM, IC, KD | | Shift summary | Ring Commissioning |
|
Ring commissioning | | Start of the machine by KD
11h20 The beam is in the ring
Optimization of the injection with |
7x | |
851
|
Fri Mar 1 10:39:04 2024 |
VK, VM, IC on Thu Feb 29 | Under Process | Shift summary | Ring | Ring Commissioning |
|
Recomissioning of the SR, search for the revolution frequency | | Start of the machine 9h
Optimization of the beam transport
to the Ring. |
  | |
850
|
Fri Mar 1 10:30:38 2024 |
VK, VM, IC | Under Process | Shift summary | Ring | Ring Commissioning |
|
Recomissioning of the SR, search for the revolution frequency | | 8h50 Start of the machine
Laser amplifier was somehow OFF.
Very strange situation and not clear why |
13x | |
Draft
|
Thu Mar 7 08:58:28 2024 |
VK, VM, IC | Under Process | Shift summary | Ring Commissioning |
|
Recomissioning of the SR, search for the X-rays | | 8h50 Warming up the machine
Problem with the vaccum around
the RF cavity (see screenshot attached). |
| |
Draft
|
Wed Oct 5 19:02:28 2022 |
VK, VM, HG,IC, AL | | | |
|
| | Shift started with machine receipy from
Monday .
Scan parameters, injection to find |
| |
769
|
Tue Jun 13 18:06:14 2023 |
VK, IC. VM, ND, LS | | Shift summary | Ring Commissioning |
|
beam storage | | The main idea fo this week is to
prepare the beam for the search of the first
X-rays. |
   | |
786
|
Fri Jul 28 17:06:02 2023 |
VK, IC. VM, LS, JNC | | Shift summary | Ring Commissioning |
|
Test of the new optics (27-28 July) | | Start of the modulator and laser at ~9h
and hour later start the beam.
Working at 500.38 MHz to retrieve |
6x | |
758
|
Fri May 26 13:56:17 2023 |
VK, IC. VM, LS | | Shift summary | Ring Commissioning |
|
Studies on the beam revolution frequency | | The main task for today is to measure the
revolution frequency without RF cavity with
the spectrum analyzer. |