1202
|
Wed Mar 4 08:35:23 2026 |
VM, MJ, DN, RC | Fixed | Shift summary | Linac Commissionning | Ring Commissioning |
|
Check point du fonctionnement anneau du 24/02 suite a l'ajout de resistances dipole le 24/02 au soir | | 08h35 Warm-up ThomX: Modulator, Laser,
Fridge
Programme |
7x | |
975
|
Fri Dec 6 08:24:36 2024 |
VM, IC, VK, HG | Under Process | Shift summary | Ring Commissioning |
|
| | 08h25 Start ThomX
09h55 HV is 'ON'
10h18 RF Gun Phase is 159 dg. Sect. |
8x | |
Draft
|
Thu Nov 28 08:19:05 2024 |
VM, IC, VK | Under Process | Info | Ring Commissioning |
|
| | 08h18 Start ThomX
10h00 HV is 'ON'
10h35 RF Gun phase is 174 dg. Section |
| |
950
|
Wed Oct 30 11:33:04 2024 |
VM, IC, VK | Under Process | Info | LI | TL | LE | Ring |
|
| | 9h25 Start ThomX
11h20 HV on, linac RF OK, but there
is no laser on the cathode. Trying to fix. |
6x | |
980
|
Fri Dec 13 08:22:36 2024 |
VM, IC, VK | Under Process | Shift summary | Ring Commissioning |
|
| | 08h23 Start ThomX
09h40 HV is 'On'
10h24 RF Gun Phase 183 dg. Sect. |
  | |
997
|
Thu Jan 16 08:28:07 2025 |
VM, IC, VK | Under Process | Shift summary | Ring Commissioning |
|
| | 08h25 Start ThomX: Modulator, frigo
08h35 Start chilers, laser, cycling
all magnets |
10x | |
Draft
|
Mon Feb 17 11:00:01 2025 |
VM, IC, VK | Under Process | Shift summary | |
|
70 MeV WP | | 10h30 Start beam
Since Friday evening the problem
to store the beam at 70 MeV. There is 1 turn |
| |
1048
|
Mon Mar 31 09:53:26 2025 |
VM, IC, RC | Under Process | Shift summary | Ring Commissioning |
|
| | 08h00 ThomX started by Maher
09h50 Problem with vacuum in the
septum. TL-V3 and EL-V1 are closed. |
   | |
1059
|
Fri Apr 18 08:23:13 2025 |
VM, IC, ND | Fixed | Problem | LI |
|
Measurements 18/4 | | 08h21 Thomx Started: modulator, frig, laser
08h27 Chillers started, cycling
all magnets |
    | |
1083
|
Thu Jun 5 08:26:31 2025 |
VM, IC, DN, RC | Under Process | Shift summary | Ring Commissioning |
|
Interaction region studies | | Goals: Optimization
of the IP. Verification of the llaser waist |
6x | |
Draft
|
Fri May 16 08:21:36 2025 |
VM, IC, DN | Under Process | Shift summary | Ring Commissioning |
|
| | 08h20 ThomX was started: Modulator, frig,
laser
08h27 Chillers were started, cycling |
| |
Draft
|
Tue Apr 1 08:43:53 2025 |
VM, IC, DN | Under Process | Shift summary | Ring Commissioning |
|
| | 08h42 Start ThomX: Morulator, firg, laser
08h47 Chillers, cycling all magnets
10h40 HV is 'ON' |
| |
1078
|
Mon May 26 09:38:46 2025 |
VM, IC | Under Process | Shift summary | Ring Commissioning |
|
Ring BLM and charge linearity | | Goals:
- |
6x | |
Draft
|
Tue May 27 08:34:42 2025 |
VM, IC | Under Process | Shift summary | Ring Commissioning |
|
| | Goal:
Beam Loss Monitors and Ring injection at
high charge. Studies of the injector for |
9x | |
1154
|
Thu Nov 20 09:26:33 2025 |
VM, IC | Under Process | Urgent | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
BBA Ring | | Goal: Ring BBA
09h14 Unable to start thomx. Need
help. Probably problem with cooling water. |
 | |
1167
|
Thu Dec 11 08:38:30 2025 |
VM, IC | Under Process | Shift summary | Diag | Ring Commissioning |
|
40 MeV operation | | 8h37 Warm-up ThomX: Modulator, Laser, Fridge
8h44 Chillers were started, cycling
all magnets. |
12x | |
1168
|
Fri Dec 12 08:40:50 2025 |
VM, IC | Under Process | Shift summary | Ring Commissioning |
|
Check of the 70 MeV with MRSV, Ring studies | | 08h40 Warm-up ThomX: Modulator, Laser,
Fridge
8h45 Chillers were started, cycling |
    | |
896
|
Fri Aug 2 11:00:49 2024 |
VM, HG, RC, SC | Under Process | Shift summary | RF D1 |
|
RF conditionning : 2 aout | | Start from 10 dB
decrease up to 1 dB : Vacuum is
OK decrease up to 10â»8 mBar |
| |
Draft
|
Fri Mar 6 10:44:11 2026 |
VM, HG, JN | Under Process | Shift summary | RF D1 |
|
| | 09h00 Warm-up ThomX: Modulator, Laser,
Fridge
09h05 Chillers were started, cycling |
| |
1038
|
Fri Mar 14 08:31:19 2025 |
VM Entered by Super Team from 134.158.195.142 on Fri Mar 14 08:31:03 2025 | Under Process | Shift summary | LI | Diag |
|
Streak camera measurements | | 08h28 Start Thomx: Modulator, Laser, Frig
08h33 Chillers were started, cycling
al magnets |
    |
|