  924   Fri Sep 27 08:26:14 2024 VC MJUnder ProcessProblemSY pB synchro 

mise en chauffe machine  => synchrro OK
=> frigo en marche => synchro OK
=> chiller en marche => synchro OK
=> alim linac en marche (I=0A)=> synchro OK
=> alim linac en marche (I = nominale) => synchro OK
=> alim TL en marche (I=0A)=> synchro OK
=> alim TL en marche (I = nominale) => synchro OK
=> alim RI-C1 en marche (I=0A)=> synchro OK
=> alim RI-C1 en marche (I=1A ou nominale)=> =PB Synchro apparait!!!
=> extinction Steerer RI-C1+dipole RI-C1-DP.01 => SYNCHO OK
=> extinction Steerer et QP  RI-C1 => Synchro OK
=> extinction RIC1-C2 SP03 => Synchro OK
=> extinction RIC1-C2 SP01 => Synchro OK
=> extinction RIC1-C2 SP02 => Synchro OK

dipole RI-C1-DP.01 perturbe la synchro quandcourant est à I=236A  (c'est reproductible)  (236A était la valeur enregistrée)

démarrage de toutes les alims (avec une recette anneau) sauf RI-C1-DP.01 => synchro OK

Le pb apparrait progressivement quand on augmente le courant (plutot régulier à partir de 200A) 

On va prendre un cafe et ensuite on va redemarrer la machine

Au redemarrage le probleme reapparait quand on met du courant dans dip_TL.

Test de toutes les alims dipole

Le pB synchro semble en fait lié aux courants délivrés par toutes les alims des dipoles (cf les screenshots des signaux sur bpmLI)
Je pense qu'il est beaucoup plus visible et frequent avec les dipoles ANNEAU car les 8 s'allument en meme temps

Test de l'alim SOLENO : idem probleme de synchro quand on va a fort courant (cf screenshot SOLENO)

Le dernier screenshot c'est :
Soleno OFF et tous les dipoles OFF sauf le EL_DP01 (qu'on ne peut pas eteindre sinon on n'a plus lautorisation de tir)

 

 

 

 

 

 

 

 

 


 

Attachment 1: diople_EL_200.png
diople_EL_200.png
Attachment 2: dipole_TL-159.3.png
dipole_TL-159.3.png
Attachment 3: dipole_EL_inj_9.png
dipole_EL_inj_9.png
Attachment 4: dipoles_ring_159.3.png
dipoles_ring_159.3.png
Attachment 5: alim_soleno_280.png
alim_soleno_280.png
Attachment 6: all_OFF_exceptELDP01_a_0.png
all_OFF_exceptELDP01_a_0.png
  928   Mon Sep 30 09:52:38 2024 VC MJUnder ProcessProblemLinac Commissionning remise en route d'une synchro valide 

9h50 démarrage chauffage Klystron

la sortie d'urgence porte casemate a été appuyé ce matin.... ça bloque la ronde

16H... le timing a sauté pendant quelques secondes et est revenu tout seul
16H15 le 50Hz c'est mis à mal fonctionner ... replug des sondes dans le chassis (scope R&S 162.168.229.80)
tout refonctionne...

160pC à charge Max (67°)

Passage section : charge transmise a 100%
  * seulement pour SOLENO 220-230
  * qq soit l'alignement (section ou quads)
  * qq soit l'ouverture d'iris.

Sautes de faisceaux toujours presentes toutes les 2-3 minutes

Fin de shift.

Synchro OK pour demain matin

 

 

 

  987   Fri Dec 20 14:00:06 2024 Entered by Nicolas Delerue from 134.158.195.142 on Fri Dec 20 13:59:52 2024Not FixedProblemInfra Alarme sur les rondes 

A 13h30 j'ai tent'e de faire un acces controle dans la casemate.

Quand j'ai pris la 1ere clef une alarme (son inhabituel) s'est declenchee au niveau de la fosse sud avec un chenillard rouge sur les verrines (fooses nord, sud et klystron).

J'ai appele le SPR comme explique hier.

Je suis tombe sur un repondeur...

Jean-Noel a tourne des clefs sur le PSS et l'alarme s'est arretee.

Plusieurs rondes sont tombees.

  991   Thu Jan 9 10:31:11 2025 Entered by Nicolas Delerue from 134.158.195.144 on Thu Jan 9 10:30:34 2025Not FixedProblemCC DS ThomX_PhotoCathode using a lot of CPU 

The load on client5 is 29 making all operations slow.

Appently the DS ThomX_PhotoCathode is using a lot of CPU, slowing the rest.

 

 

Attachment 1: Screenshot_2025-01-09_10-30-03.png
Screenshot_2025-01-09_10-30-03.png
Attachment 2: Screenshot_from_2025-01-09_10-32-26.png
Screenshot_from_2025-01-09_10-32-26.png
  1044   Fri Mar 21 08:37:09 2025 VMNot FixedProblemLI | RF D1 Modulador problem 

08h38 There is problem with the Linac modulator

08h55 Fixed with Maher help

  1047   Mon Mar 31 09:46:56 2025 Entered by Super Team from 134.158.195.141 on Mon Mar 31 09:46:30 2025Not FixedProblemVide Problem with vacuum in the septum. TL-V3 and EL-V1 are closed. 

09h45 Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.

10h03 Fixed!

10h22 From time to time TO-V3 and EL-V1 close. Septum vacuum is 2.6e-10

  1059   Fri Apr 18 08:23:13 2025 VM, IC, NDFixedProblemLI Measurements 18/4 

08h21 Thomx Started: modulator, frig, laser

08h27 Chillers started, cycling all magnets

09h32 HV is 'ON'

09h34 Cannot control the section attenuator

09h50 The issue with the section attenuator was fixed: its server was shut down and restarted, but it was set to 0 dB!!

11h17 RF Gun phase 171 dg., Sect phase is 211 dg. Att. 2.62 dB, TL/BPM2 X=2mm, Charges (from BPMs at Att. 31 dB): -77pC, -77pC, -86pC . Linac steerere: H [1.03 -3.47], V [-1.88 2.63]

Contradictions with ICTs:  -87 pC, -73 pC, -80 pC

Beam in the ring

11h40 RCDS on injection receipt all_20250418_11_39_40, RF cav. at 100 kV, phase 16.5 dg., screanshots

12h03 Linac was reajusted. RF Gun phase is 166 dg., sect. phase is 210 dg. Att. 2.58 dB, TL/BPM2 X=3 mm RF cav. 100 kV, phase 13.5 dg. screenshots

12h10 Ring dipoles were changed from 160.4 A to 159.3 A, ring quads were adjusted and tune as well was set back to 0.17. TL/BPM2 X = 0. Screenshots 

12h25 RF Gun phase was adjusted to 161 dg.

15:24 Initial Synchro delay for streak camera: -6.60us. Injection at delay of +99.3e3us

Measurements incuding single shots

Study of the injection and of long decays with the streak camera, cf images. Horizontal scale is 2ms, vertical scale is 600ps.

Operating the streak camera create instabilities on the ring 500MHz that may cause phase problems.

16h47 RF Gun phase is 149 dg. RF cav. was at  200 kV, phase 10.5 dg.

17h26 Stop thomx

Attachment 1: Screenshot_from_2025-04-18_09-42-24.png
Screenshot_from_2025-04-18_09-42-24.png
Attachment 2: injection_sequence_blank2ms_009.png
injection_sequence_blank2ms_009.png
Attachment 3: injection_sequence_blank2ms_003.png
injection_sequence_blank2ms_003.png
Attachment 4: injection_sequence_blank2ms_002.png
injection_sequence_blank2ms_002.png
Attachment 5: injection_sequence_blank2ms_036.png
injection_sequence_blank2ms_036.png
  Draft   Wed Jun 17 08:36:20 2026 IC, VMUnder ProcessProblemVide Restart of the accelerator 

08h35 Start-up modulator (it was already on standby), laser, magnets, cycling.

As yesterday there is a problem with the MPS to start the machine. We are trying to investigate whether it is related to the vacuum or something else.

Problem with the solenoid COL.01 (Internal Interlock Hard).

Help is needed.

At this moment, apparently we are blocked by the closed vacuum valve of the FPC. To be checked with Nourredine (emails sent).

The vaccum level in the FPC is not yet good to open the valve. Eric will check it.

10h10 Switched to the Linac+TL+EL configuration. HV is on (the modulator was in the local mode). Interlocks even at HV 1200 V, the sect att. 3 dB. Linac 04 vac is high.  

10h33 There are breakdowns at 26 dB the section att. and 25 dB of the RF gun att. These are not in vacuum breakdowns. Probably it is the klystron problem.

10h50 The modulator is in the standby mode.

Maher is coming to check the klystron and Jean-Noel is working on the solenoid power supplies.

11h40 Maher fixed problem with the klystron by increasing the filament power. At 84 kV, I = 48.7 A (microperveance 2.0). At 293 kV, I = 294 A (microperveance 1.85, should be 2.0).

12h03 The machine configuration without FP closes the photocathode laser shuter, so we can operate only in the Linac+TL+EL configuration.

12h36 Energy = 50 MeV, Laser Phase 25 dg., Sect. Phase 253 dg., Sect. Att. 2.26 dB, I_Gun -95.0704 pC, I_Linac -92.7397 pC, I_TL -3.7568 pC RF_Ampl. 0 kV, RF_Phase 35.5 dg.

Laser Att. 360, Linac steerers H: [0.31 -2.62], V: [-1.87 2.88]

12h43 Energy = 50 MeV, Laser Phase 26 dg., Sect. Phase 250 dg., Sect. Att. 2.35 dB, I_Gun -101.3924 pC, I_Linac -99.5194 pC, I_TL -101.3812 pC RF_Ampl. 0 kV, RF_Phase 35.5 dg. 

13h17 Laser Att. 410 (max) Energy = 50 MeV, Laser Phase 26 dg., Sect. Phase 250 dg., Sect. Att. 2.35 dB, I_Gun -138.8712 pC, I_Linac -135.3968 pC, I_TL -137.4172 pC RF_Ampl. 0 kV, RF_Phase 35.5 dg.

At the moment maximum charge is 135 pC with irise Ø of 1.3 mm  (possibly because the laser photocathode shutter is in the wrong position)

13h25 The modulator is in standby mode. Maher can remove the MPS short.

The problem with MPS is the OC/AVAL02 FP valve. It is in two states at the same time: Closed and Open.

It was the OC/AVAL01 FP valve

recipe_recipe_LI_TL_RI_all_20260422_18_34_34.txt loaded

14h54 Beam is in the ring w/o RF. Thank you all !!!!.

15h15 Laser Att. 360,  Energy = 50 MeV, Laser Phase 26 dg., Sect. Phase 250 dg., Sect. Att. 2.42 dB, I_Gun -179.1795 pC, I_Linac -205.8011 pC, I_TL -186.6367 pC RF_Ampl. 99.1184 kV, RF_Phase -50 dg.

Laser Att. set to 320 for 100 pC

15h25 Energy = 50 MeV, Laser Phase 26 dg., Sect. Phase 250 dg., Sect. Att. 2.33 dB, I_Gun -96.7941 pC, I_Linac -124.7882 pC, I_TL -102.9734 pC RF_Ampl. 99.1184 kV, RF_Phase -50 dg.
 

15h28 recipe_recipe_LI_TL_RI_all_20260121_10_35_05.txt loaded. There is storage, but it is necessary to optimize it

15h33 ring_saving

15h35 recipe_recipe_LI_TL_RI_all_20260422_18_34_34.txt loaded

15h36 ring_saving

17h41 ThomX was stopped

Attachment 1: Screenshot_from_2026-06-17_15-54-18.png
Screenshot_from_2026-06-17_15-54-18.png
Attachment 2: Screenshot_from_2026-06-17_15-50-21.png
Screenshot_from_2026-06-17_15-50-21.png
  13   Tue Jun 8 14:39:20 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:39:06 2021Under ProcessOtheretc attenuateur section tests butée moteur 

Tests des moteurs sur atténuateur en cours

Repérage des butées et des positions

  15   Tue Jun 8 14:44:01 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:43:48 2021Under ProcessOtheretc attenuateur section tests butée moteur 

Pas complètement au switch à 0.0 pas pour LI/HFI/ATT.02-MOT01

  107   Mon Oct 11 13:46:11 2021 Entered by Super Team from 134.158.195.142 on Mon Oct 11 13:45:53 2021Under ProcessOtherLinac Commissionning Travaux 

Travaux en cours à l'extérieur, le goudron sur le chemin a été enlevé, une pelleteuse bloque le passage vers ThomX, le passage est possible mais difficile

  110   Mon Oct 11 18:04:35 2021 Entered by Super Team from 134.158.195.142 on Mon Oct 11 18:04:10 2021FixedOtherLinac Commissionning Arrêt faisceau 
  175   Tue Nov 23 10:56:50 2021 Entered by Iryna Chaikovska from 134.158.195.143 on Tue Nov 23 10:56:34 2021FixedOtherAimants | Linac Commissionning Cyclage dipole 

 For 22/11/2021

There is the remaining field from the dipoles in the TL. In order to go straight to the dump, the idea was to cycle the dipole to have 0 field. We have tried the cyclage given by the ALBA peopel/Cynthia. Total time ~ 17 min. After two cycling, the remaining filed alwayd stays at ~20 G.

After discussion of Jean-Noel with Fabrice Marteau, this turned out normal situation given the unipolar PS of the dipoles. The remaining filed is kind in agreement with B(I) found in excel files provided long time ago by Cynthia.

The information concerning the dipole cycling from Cynthia is attached.

Attachment 1: cylage_dipole.png
cylage_dipole.png
Attachment 2: Screenshot_from_2021-11-23_12-16-04.png
Screenshot_from_2021-11-23_12-16-04.png
Attachment 3: Screenshot_2021-11-23_at_14.40.52.png
Screenshot_2021-11-23_at_14.40.52.png
  177   Tue Nov 23 13:12:37 2021 Entered by Iryna Chaikovska from 134.158.89.93 on Tue Nov 23 13:12:22 2021Under ProcessOtherAimants | Linac Commissionning Cyclage quadrupoles 

23/11/2021

We would like to cycle the quadrupoles in the linac. The procedure of the cycling was provided by Cynhia (attached). 

The magnet current should be ramped from 0 to IMAX , decreased down 0 and ramped back to IMAX three more times. Measurement current will be finally reached going to nominal current ISet. (IMAX  = 12 A).  

Total cycling time is ~8 min [so ~1 min for 0 to IMAX, and the same for IMAX to 0). Waiting time at IMAX & I=0 is ~10 sec.

More probably this procedure is driven by the fact that the B(I) curves were provided for the positve values of I only I = 0..+12


As it was discussed with Cynthia: In order to set the negative current (defocusing quadrupole magnets), the  cycling procedure should be reversed. 

When the calibration curves [-12 A +12 A] will be available, the procedure has to be the following. The magnet current should be ramped from 0 to IMAX , decreased down to -IMAX and then ramped again up to IMAX. 

Measurement current will be finally reached going to nominal current ISet. (IMAX  = 12 A).  Total cycling time is ~6 min [so ~1 min for 0 to IMAX, and the same for IMAX to - IMAX). Waiting time at IMAX & I=0 is ~10 sec.

Figure attached: Quadrupole cycling layout given by Cynthia.

Figure attached: Quadrupole cycling layout in case of bipolar power supplies and corresponding calibration curves.

For the linac, to set the quadrupoles to 0, we can use the last procedure involving the + I max and -Imax (figures attached) and for later, we should discuss with Fabrice Marteau how we procceed. 

We made the cycling for the QUAD qnd still we have 5-10 G of the remaining field. To be understood....

 

Attachment 1: Screenshot_2021-11-23_at_13.14.26.png
Screenshot_2021-11-23_at_13.14.26.png
Attachment 2: Screenshot_from_2021-11-23_14-09-27.png
Screenshot_from_2021-11-23_14-09-27.png
Attachment 3: Screenshot_from_2021-11-23_14-10-15.png
Screenshot_from_2021-11-23_14-10-15.png
Attachment 4: cylage_quad.png
cylage_quad.png
Attachment 5: cylage_quad2A.png
cylage_quad2A.png
  205   Thu Dec 9 12:59:03 2021 Entered by sophie chance from 86.246.158.218 on Thu Dec 9 12:58:47 2021FixedOtherLinac Commissionning CR Reunion planning Linac ThomX 

BILAN DE LA SEMAINE

Modulateur/RF

-Plusieurs arrêts modulateur sans cause apparente (interlock)

-Ajout de ferrite

-Demande d’intervention à Scandinova

-Appel de courant démarrage d’un équipement de la baie 17 (MPS dedans) à pb disjoncteur ?

-Changer disjoncteur 4A courbe C, ou pile  

-Pilotage à distance / acquisition / données

-Modification des voies redpi de +/- 20 à +/-1 à test à faire pour voir si le signal sort mieux

-Affectation automatique des tickets fait :https://glpi-thomx.lal.in2p3.fr/front/central.php

-FAQ : https://gitlab.in2p3.fr/CCThomX/docutilisateurs/-/blob/master/README.md#foire-aux-questions-faq

-Taurus, problème de valeur relue figée (identifier pour IHM alim, IHM RF) à obligation de rouvrir fréquemment les atk pour vérifier les passages de commandes à on soupçonne aussi un problème avec la plateforme IHM

passer les DS calc dans Astor (groupe CC, Hayg fait un ticket en précisant le groupe, machine où ca tourne

FAISCEAU

 

•Laser

•Modification position hublot pour éviter deux faisceaux en transverse

•Nouveau hublot commandé en stock (2 semaines)

•Amélioration de la stabilité laser grâce au bâchage, ordre 20-30 um de jitter rms du pointé

•Alignement en faisceau (laser, soleno) par Emmanuel, Hayg

•Alignement laser en faisceau avec M4

•Position fausse cathode 1047 en x et en y

•Procédure de Marie « pauvre script » pour compenser les sauts moteur

•Tests de plusieurs méthodes (en développement)

 

ACTIONS FUTURES

 

•Faisceau

•Objectifs court terme (10Hz, 100pC, 50 MeV au dump):

•Alignement de la tête de machine en faisceau (Hayg/Emmanuel)

•Visualisation « propre » énergie,

•Charge pour le contrôle du 25/11

•Test à prévoir côté diag sur la montée en cadence (Vincent peu dispo)

•Calibration des fibres de perte (Bruno, Iryna)

•Limiter la charge et la durée et le temps (que tu sois présent)

•Modification auprès de Nourredine

•Surveiller rayonnement extérieur

•Mesures émittance sortie canon, mesure emittance sortie linac

•Piloter les quad avec MML sur la structure TL_SL (lier les DS_lima dans MML)

•Compenser champ rémanent dipole

•Draft tableau objectifs et problèmes associés pour la prochaine réunion

•Template quotidien a mettre en place (Elaser, etc…..) sur elog ou cahier de manips

•Définir à chaque début de schift le nom des opérateurs ainsi qu’objectifs de la journée (elog ou cahier de manips)

•Prévoir plusieurs démarrages à blanc pour formation nouveaux opérateurs. Fixer des dates (une par semaine ou date prédéfinie?)

•Lundi 6 décembre : Mesure d’emittance, énergie (HG, MJ, ME)

•Mardi 7 : Energie en fonction de la phase de la section avec écran + BPM (HG, MJ, ME) ou Eps ?

•Mercredi 8 décembre : Prise de données (HG, EG)

•Jeudi 9 décembre : Prise de données (HG, EG) ou Eps ?

•Vendredi 10 décembre : calibration fibre après-midi (IC, BM, SC, NE)

•Intervention cavité FP tous les matins : 9h – 11h

Installation en janvier de l’ampli Alphanov?

•Préparation alignement anneau 20 au 24 décembre (casemate ouverte)

•Finalisation alignement anneau à partir du 17 janvier 2022 : 3 semaines

•Vérification alignement linac en plus

•Casemate ouverte

  296   Wed Feb 2 10:46:03 2022 Entered by Christelle Bruni from 134.158.195.142 on Wed Feb 2 10:45:49 2022Under ProcessOtherInfra entretien pont roulant 

Entretien en cours du pont roulant D1

Entretien terminé

Entretien du pont roulant de l'igloo à prévoir (contact Jean Francois Garault)

  370   Wed Feb 23 15:28:52 2022 Entered by Maher OMEICH from 134.158.91.212 on Wed Feb 23 15:28:31 2022 OtherRF D1 intervention 

Bonjour à tous,

Je voudrais faire des tests sur le modulateur et les chillers et frigo le vendredi 25/02 dans le D1

Maher

  440   Thu Apr 14 08:04:58 2022 Entered by Super Team from 134.158.195.141 on Thu Apr 14 08:04:41 2022Under ProcessOtherDiag | Electronique | Linac Commissionning ThomX -commitionning diag 

Demarrage modulateur et chiller 8h06

  548   Thu Sep 15 09:34:23 2022 MOFixedOtherLinac Commissionning balise T3G 

La balise T3G était en défaut ce matin, redémarrage du PC ( LB 9000 coté THOMX ) pour corriger

  799   Mon Oct 2 17:18:39 2023 Vincent-NicolasFixedOtherSY Mode de fonctionnement en place pour la synchro 

Nous avons déployé un déphaseur 500MHz vers la cavité Fabry Pérot (180° de phase)  ER/CA/RAC.05-API.AO1/AO6

Un déphaseur 33MHz est déployé sur le 33MHz ri  ER/CA/RAC.05-API.AO1/AO7

 

le systeme est revenu à un seul synthé coté Ring

le programme CPLD (sychro 500MHz OK) 33*41 1 coup /5 est chargé

le jitter entre les 500MHz Li et Ri est de l'ordre de 15ps sDev  (très grand pour cette configuration)

le jitter entre le 41.6MHz li et le 500MHz li est mesuré à 10ps sDev en entrée du chassis synchro (c'est beaucoup trop) ==> à vérifier

 

 

 