  Draft   Mon Feb 23 09:43:36 2026 IC    Ring studies 

9h40: mise en chauffe (chillers/frigo, modulateur, cyclage)

HV ON

The ICT signal (GUN) is frozen. Need help to restart it. Use the BPM SpSum instead.

13h Beam in the ring.

RF gun phase 31 dg., Sect. att. 2.47 dB, Sect. phase 237 dg., charges (ICT): about -120 pC

17h16 ThomX stopped

 

  Draft   Thu Feb 26 08:18:00 2026 IC, VM      

08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

09h19 HV is on

RF gun phase 78 dg. Sect. Att. 2.56 dB, sect. phase 219 dg. RF 50 kV. Linac steerers:  H [-0.36 -2.65], V [-2.49 3.24].

Scan ring RF frequency.

16h40 ThomX stopped

  Draft   Mon Mar 9 12:55:30 2026 Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026    Restart after strange last shift  

12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen put last motor positions (2266 && 4158) --> No spot on screen :(
13h05 : Gun activities incresed (Vac > 1e-7 && reflected power)
13h12 : Laser put OFF

  Draft   Fri Mar 13 08:33:25 2026 Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026      

08h32 Warm-up ThomX: Modulator, Laser, Fridge

08h37 Chillers were started, cycling all magnets

09h48 HV is ON

10h42 There was a problem with "Camera Laser". Restarted  li/op/las.02 server by killing it

12h26 Beam is in the ring, RF 100 kV, phase -42 dg. Laser phase 163 dg. Sect att. 2.57 dB, Sect. phase 221 dg. Laser att. 324, Charge oscillating around -120 pC. Feedback laser PID coefficients were changed: P=0.5,I=0.02, D=0.05 to get more stable laser spot position (Old: P=0.7,I=0.01, D=0.1 ).

18h27 ThomX was stopped

  Draft   Thu Mar 19 07:46:50 2026 Entered by Super Team from 127.0.0.1 on Thu Mar 19 07:46:39 2026    , entered from 127.0.0.1 

7h45: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

8h46 The photocathode laser image on the camera is very weak, I can't initiate feedback. Help needed.

08h56 HV is on

During another attempt to launch laser position feedback, the diaphragm completely disappeared outside the screen (to the right).

OK it was fixed

09h57 beam is in the ring w/o RF, recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt loaded. Laser phase 5 dg. (to low), sect. att. 0.148 dB, sect. phase 258 dg., Charges around -100 pC,

10h06 RF 100 kV, phase -45 dg.

10h30 interlocks even at sect. att. 0244 dB

11h15 Sect. temp. set to 29.2C  (Clarinette, Consigne 28.6 C)

11h57 laser phase jumped to 18 dg.

12h25 For the 70 MeV settings (DP current 255.8 A) the linac energy is too low, so we left 253.8 A ==> 69.7 MeV.


18h10 ThomX was stopped

  Draft   Wed Apr 8 07:29:51 2026 7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)    , entered from 127.0.0.1 

7h30 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

8h30 HV is ON

recipe_recipe_LI_TL_RI_all_20260402_14_37_41.txt loaded

10h16 Energy = 50 MeV, Laser Phase 72 dg., Sect. Phase 220 dg., Sect. Att. 2.51 dB, I_Gun -116.9607 pC, I_Linac -140.3135 pC, I_TL -131.2199 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
10h18 Energy = 50 MeV, Laser Phase 72 dg., Sect. Phase 220 dg., Sect. Att. 2.51 dB, I_Gun -98.3498 pC, I_Linac -120.5804 pC, I_TL -111.3074 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.

11h19 Energy = 50 MeV, Laser Phase 75 dg., Sect. Phase 219 dg., Sect. Att. 2.62 dB, I_Gun -92.4726 pC, I_Linac -115.7833 pC, I_TL -106.6548 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
13h55 Energy = 50 MeV, Laser Phase 79 dg., Sect. Phase 224 dg., Sect. Att. 2.58 dB, I_Gun -94.4872 pC, I_Linac -117.7063 pC, I_TL -107.6493 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
 

 

  Draft   Thu Apr 16 07:32:25 2026 Entered by Super Team from 127.0.0.1 on Thu Apr 16 07:32:14 2026    , entered from 127.0.0.1 

7h30 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

9h00 HV is ON

10h33 Energy = 50 MeV, Laser Phase 77 dg., Sect. Phase 217 dg., Sect. Att. 2.546 dB, I_Gun -98.9021 pC, I_Linac -131.1291 pC, I_TL -120.2702 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
12h53 Energy = 50 MeV, Laser Phase 78 dg., Sect. Phase 218 dg., Sect. Att. 2.577 dB, I_Gun -97.6327 pC, I_Linac -124.7496 pC, I_TL -111.3515 pC RF_Ampl. 148.7161 kV, RF_Phase -35 dg. receipt 10 Apr last, X flux 35e3 pA, Las. Att. 276
14h56 Energy = 50 MeV, Laser Phase 75 dg., Sect. Phase 215 dg., Sect. Att. 2.53 dB, I_Gun -94.9526 pC, I_Linac -122.0817 pC, I_TL -108.2541 pC RF_Ampl. 148.7161 kV, RF_Phase -35 dg. sometimes it was 50e3 pA, Las. Att. 276

19h08 Energy = 50 MeV, Laser Phase 75 dg., Sect. Phase 212 dg., Sect. Att. 2.551 dB, I_Gun -350.6393 pC, I_Linac -372.038 pC, I_TL -364.2529 pC RF_Ampl. 148.7161 kV, RF_Phase -35 dg. Las.  Att. 375

19h10 Energy = 50 MeV, Laser Phase 75 dg., Sect. Phase 212 dg., Sect. Att. 2.551 dB, I_Gun -368.8974 pC, I_Linac -390.9133 pC, I_TL -382.9227 pC RF_Ampl. 148.7161 kV, RF_Phase -35 dg. Las.  Att. 415

20h44 Energy = 50 MeV, Laser Phase 74 dg., Sect. Phase 215 dg., Sect. Att. 2.605 dB, I_Gun -87.9133 pC, I_Linac -113.5951 pC, I_TL -101.2012 pC RF_Ampl. 148.7161 kV, RF_Phase -36 dg. Las.  Att. 280

20h52 Thomx was stopped

Attachment 1: Screenshot_from_2026-04-16_20-53-14.png
Screenshot_from_2026-04-16_20-53-14.png
Attachment 2: Screenshot_from_2026-04-16_20-53-34.png
Screenshot_from_2026-04-16_20-53-34.png
  Draft   Wed Apr 22 10:26:28 2026 IC,VM      

Dalkia solved the problem with vooling circuit in the morning

10h15 mise en chauffe  (frigo/chillers, modulateur, laser, cyclage)

11h16 HV is ON


11h57 Energy = 50 MeV, Laser Phase 54 dg., Sect. Phase 215 dg., Sect. Att. 2.34 dB, I_Gun -90.3427 pC, I_Linac -115.8595 pC, I_TL -104.0088 pC RF_Ampl. 148.7161 kV, RF_Phase -45 dg.
15h01 Energy = 50 MeV, Laser Phase 35 dg., Sect. Phase 218 dg., Sect. Att. 2.456 dB, I_Gun -101.8359 pC, I_Linac -120.7055 pC, I_TL -114.6878 pC RF_Ampl. 148.7161 kV, RF_Phase -49.5 dg.
18h04 Energy = 50 MeV, Laser Phase 27 dg., Sect. Phase 216 dg., Sect. Att. 2.421 dB, I_Gun -98.616 pC, I_Linac -120.8228 pC, I_TL -14.2993 pC RF_Ampl. 148.7161 kV, RF_Phase -35 dg.
20h13 Energy = 50 MeV, Laser Phase 28 dg., Sect. Phase 216 dg., Sect. Att. 2.481 dB, I_Gun -110.7257 pC, I_Linac -129.583 pC, I_TL -123.6972 pC RF_Ampl. 148.7161 kV, RF_Phase -33.5 dg.
 

  Draft   Thu Apr 23 09:06:22 2026 IC, VM      

9h00 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

  Draft   Fri Apr 24 08:05:11 2026 Entered by Super Team from 127.0.0.1 on Fri Apr 24 08:05:02 2026    , entered from 127.0.0.1 

8h00 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

  Draft   Tue Jun 9 10:13:24 2026 Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026      

10h02 Start-up modulator, laser, fridge, chillers

The SF6 pressure is low. Magnet power supplies filed to start.

11h17 Stop ThomX

 