HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX  Not logged in ThomX    logo
Message ID: 1047     Entry time: Mon Mar 31 09:46:56 2025
 Author: Entered by Super Team from 134.158.195.141 on Mon Mar 31 09:46:30 2025 
 Status: Not Fixed 
 Type: Problem 
 Category: Vide 
 Important:
 Subject: Problem with vacuum in the septum. TL-V3 and EL-V1 are closed. 
 Icon:  

09h45 Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.

10h03 Fixed!

10h22 From time to time TO-V3 and EL-V1 close. Septum vacuum is 2.6e-10

ELOG V3.1.4-395e101