1247
|
Tue Jun 16 13:43:30 2026 |
Entered by Super Team from 127.0.0.1 on Tue Jun 16 13:43:02 2026 | | Fix | LI |
|
| |
Hello,
I short-circuit the MPS input to modulator, we can trig modulator, the klystron filmant time goes to full time , need 45 min, you can start at 14:35
Maher |
|
265
|
Thu Jan 20 10:38:21 2022 |
Entered by Super Team from 134.158.195.142 on Thu Jan 20 10:38:05 2022 | Under Process | Cavite optique | Linac Commissionning |
|
intervention FP | |
intervention alignement cavité en cours, faisceau impossible |
|
Draft
|
Fri Sep 17 09:12:29 2021 |
Entered by mohamed el khaldi from 134.158.76.146 on Fri Sep 17 09:12:06 2021 | Fixed | Anneau | |
|
Tuning des HOM's de la cavité RF anneau en stand by aprés les coupures d'électricité | |
le tuning automatique des HOM's de la cavité RF anneau fonctionnait bien avant les coupures d'éléctricité.
à mon retour des vacances je voulais reprendre les tests mais en vain
deux hypothéses se présentent:
1/ soit le hardware (carte redpitaya) est en panne ( la fonction de conversion analogique-numérique n'est plus possible) : nous voulons vérifier le hardware mais les tests devraient se faire sous Tango ==> besoin d'assistance de CC
NB: meme si on veut utiliser une carte spare pour vérifier, on a un souci il faut que la carte spare soit configurée avec une adresse IP qui dépend de son adresse MAC ( faire le ticket ==> il faut prévoir min une semaine pour avoir une adresse IP) ==> solution soit anticiper la configuration des spares sous le réseau bien avant sinon on perd beaucoup de temps pour ces manips qui pourraient se résoudre en une heure) ou proposer une autre solution (adresse IP doit etre attribué automatiquement au composant possédant une adresse MAC)
2/ soit problème de Software (DS carte redpitaya: ER/RF/RAC.14-ELR.01-RDP.01) ==> le DS met 0 v sur la lecture (channel "A" indique toujours 0 V) même si la tension à la sortie de comparetur de phase varie ===> besoin d'assitance de CC
je vais faire un ticket espérant une intervention rapide |
|
197
|
Thu Dec 2 10:38:44 2021 |
Entered by Maher OMEICH from 134.158.91.212 on Thu Dec 2 10:38:07 2021 | | Anneau | Aimants |
|
intervention Soleil | |
Bonjour, Patrick Alexandre et Didier Muller ( Soleil ) viendrons demain Vendredi 03/12 toute l'après midi, j'aurai plus d'info aujourd'hui concernant la journée de la semaine prochaine. |
|
200
|
Mon Dec 6 11:30:53 2021 |
Entered by Maher OMEICH from 134.158.91.212 on Mon Dec 6 11:30:27 2021 | Under Process | Anneau | Aimants |
|
Tests EPs | |
Bonjour, demain mardi 07/12 sera une journée casemate ouverte pour les tests des éléments pulsées ( kikers .... )
|
|
219
|
Thu Dec 16 09:35:11 2021 |
Entered by Super Team from 134.158.195.141 on Thu Dec 16 09:34:53 2021 | Fixed | Anneau | SY |
|
éléments pulsés | |
Réglage des largeurs d'impulsion pour les kickers d'injection:
GENERATOR_2_CHANNEL_1: 'Ring pulsed injection'
GENERATOR_2_CHANNEL_2: 'Ring pulsed extraction'
GENERATOR_2_CHANNEL_3: 'Ring pulsed septum'
ATTENTION CES VALEURS NE DOIVENT PAS ETRE CHANGEES SOUS PEINE D'ENDOMMAGER LE MATERIEL!!!!!!
|
|
473
|
Tue Jun 7 17:23:59 2022 |
ND | Under Process | Anneau | Aimants |
|
Test cycling QP anneau | |
Test de l'IHM de cyclage des aimants de l'anneau
- l'IHM fonctionne (teste uniquement pour QP)
Defaut (internal interlock hard) sur RI-C1/PS/QP.05,RI-C1/PS/QP.06,RI-C2/PS/QP.02
Cyclage des autres QP OK.
|
|
578
|
Thu Oct 6 10:18:03 2022 |
VK/ND/SC | | Anneau | Ring Commissioning |
|
Faisceau Anneau | |
Modulateur Impossible à passer en Standby ==> problème manque d'eau.
* Remise à ~4bars le réseau principal
* Restart du soft du modulateur (sinon l'erreur reste)
* Conductivité à 7MOhm
10h : Démarrage modulateur et refroidissement (MO)
Modulateur 1090V, Mise en place du feedback position laser
Scan charge phase avec iris à 4 mm, phase de charge max phi = 366 degres
Iris 4 mm Qmax sur LI/SST.01 = 80.7 pC std 14.2
Iris 3 mm Qmax = 64.6 std 14.2 pC
Iris 2 mm Qmax = 32.4 std 11.2 pC
Iris 1 mm Qmax = 10.4 std 11.9 pC
Mesure energie avec les steerers : 52 MeV
Chargement recette du vendredi 30/09 (19-22-04)
-------------------------------------------------------------------------------------------------------------
Problème licence matlab :
Warning: Directory already exists.
> In quad_TLSST1_thomx_Dark_dim_bary_v3 (line 87)
License checkout failed.
License Manager Error -4
Maximum number of users for Image_Toolbox reached.
Try again later.
Troubleshoot this issue by visiting:
https://www.mathworks.com/support/lme/R2018b/4
Diagnostic Information:
Feature: Image_Toolbox
License path: /data/operateur.thomx/.matlab/R2018b_licenses:/home/debian/R2018B/licenses/license.dat:/home/debian/R2018B/licenses/network.lic
Licensing error: -4,132.
Error in quad_TLSST1_thomx_Dark_dim_bary_v3 (line 154)
h1=drawrectangle('Position',[length(K(1,:,1))/2-50 length(K(:,1,1))/2/2-50 50 50]);pos = round(customWait(h1));% position signal
-------------------------------------------------------------
Faisceau pour anneau
Ouverture iris 2 mm (25 pC environ)
Ouverture iris 4 mm Qenergie max = 66 pC (phi energie max = 216)
Ok pour injection et tours dans l'anneau
Sauvegarde recette recepe_LI_TL_RI
13h13 Recipe saved for the ring. Injection optimised.
14h Camera MRSV non accessible => a verifier dans la casemate
14h05 etude de l' effet de l' iris laser sur LI/DG/BPM.01. Les 4 copies d'ecran correspondent a 4 valeurs d'iris different de 4mm a 1mm.
16h Etude systematique de la position sur LI/DG/BPM.01 vs iris. Cf images jointes.
L'attenuation etait trop forte, a basse charge (iris ferme) la position etait domine par le bruit.
Si l 'attenuation est trop forte (32dB), les mesures saturent. Il faut regler l 'attenuation de LI/DG/BPM.01 a -15dB.
Étude similaire sur TL/DG/BPM.01. Cf images jointes. Il faut regler l 'attenuation de TL/DG/BPM.01 a 0dB.
Arret machine 16h26.
Note: RI-C2/DG/MRSV n'était pas branché. Il va falloir se procurer les câbles correspondants.
|
| Attachment 1: Screenshot_from_2022-10-06_14-05-37.png
|
 |
| Attachment 2: Screenshot_from_2022-10-06_14-05-52.png
|
 |
| Attachment 3: Screenshot_from_2022-10-06_14-06-26.png
|
 |
| Attachment 4: Screenshot_from_2022-10-06_14-06-45.png
|
 |
| Attachment 5: bpm_0_Att_31.0_vs_iris.png
|
 |
| Attachment 6: bpm_0_Att_15.0_vs_iris.png
|
 |
| Attachment 7: bpm_0_Att_0.0_vs_iris.png
|
 |
| Attachment 8: bpm_1_Att_0.0_vs_iris.png
|
 |
| Attachment 9: bpm_1_Att_15.0_vs_iris.png
|
 |
| Attachment 10: bpm_1_Att_31.0_vs_iris.png
|
 |
|
598
|
Thu Oct 20 08:56:39 2022 |
SC, ND | | Anneau | Diag |
|
Shift du 20/10/2022 | |
8h56 Démarrage modulateur et refroidissement
9h20: git pull => mise a jour des IHM SST et BPM (git pull qui n'avait pas ete fait cette semaine)
10:05 Demarrage Scan charge phase
10:13 Interlock. Intervention CTA?
10:15 Charge max: Phase=260 => Energy max: Phase=210 Charge ~85pC (Iris=1.3mm)
11:13 Chargement recette recipe_recipe_LI_TL_20221018_14_30_21.txt
11:19 Chargement recette Saturation_TL_SST1_recipe_LI_TL_straight_20221018_11_49_54
Observation faisceau sur LI/SST.1 => Max intensity = 2000
Optimisation solenoide
Observation faisceau sur LI/SST.1 => Max intensity = 4000
11:30 Intervention RedPitaya. La permutation s'est bien passee. La RDP doit maintenant etre mise dans son chassis.
12:00 Etude saturation ecrans
Pas de saturation quand on reduit l'intensite (cf images jointes).
50% sur LI/SST.01
10% sur TL/SST.01
12:24 Chargement recette recipe_recipe_LI_TL_20221018_14_30_21.txt
Q(TL/DG/ICT2)=70pC
Pas de saturation sur TL/SST.2
|
| Attachment 1: scan_charge_phase_min_0.0_max_360.0_10_9_12.png
|
 |
| Attachment 2: scan_charge_phase_min_230.0_max_280.0_10_15_56.png
|
 |
| Attachment 3: Screenshot_from_2022-10-20_11-56-48.png
|
 |
| Attachment 4: Screenshot_from_2022-10-20_11-57-21.png
|
 |
| Attachment 5: Screenshot_from_2022-10-20_11-57-34.png
|
 |
| Attachment 6: Screenshot_from_2022-10-20_11-57-49.png
|
 |
| Attachment 7: Screenshot_from_2022-10-20_12-00-41.png
|
 |
| Attachment 8: Screenshot_from_2022-10-20_12-01-49.png
|
 |
|
617
|
Fri Oct 28 09:19:22 2022 |
SC/ND | | Anneau | Linac Commissionning |
|
Démarrage faisceau et TP | |
9h19 : Mise en route modulateur et refroidissements
10h45: Start the Modulator
11h30 : Scan charge
Max chage : 238°
Max energy : 188°
12h : load recipe : recipe_recipe_LI_TL_RI_20221021_16_15_04.txt
Dipole TL switch off -> Beam on TL/DG/SST.01
12h30 : Dipole TL switch on
Beam on TL/DG/SST.02
Beam energy and enegy spread improved by increase phase to 204 (cf image) (dipoles at 156A)
12h45 : Injection dans l'anneau
calcul convetion A -> rad for kicker
13h50:
Test on TL/DG/SST.02
===
Program for the shift on 28/10
1) Start beam
2a) Measure respone of TL/SST.2 as function of time
2b) Try to put TL/SST2 on negative polarity
3) Study BPM attenuation
4) Test Alexandre's feedback
5) Cerenkov |
| Attachment 1: scan_charge_phase_min_200.0_max_280.0_12_4_46.png
|
 |
| Attachment 2: 2022-10-28_12_39_29_tl_dg_sst_02-ccd_01_RAW.png
|
 |
|
649
|
Fri Dec 9 11:07:57 2022 |
Entered by Super Team from 134.158.195.141 on Fri Dec 9 11:07:40 2022 | Under Process | Anneau | Ring |
|
| |
Phase Qmax = 138
Phase Emax = 88
energy jitter
RF Cavity interlock vacuum - reset with DS .
Search optimal phase of RF cavity.
16:50 Closing the scrapper: less losses at injection
Best scrapper setting L=35mm R=9mm
17:30 Demarrage Kicker extraction
Pelser3fault and Pulser4fault on Extraction Kicker => Impossibele to start
|
| Attachment 1: Screenshot_from_2022-12-09_16-53-05.png
|
 |
| Attachment 2: Screenshot_from_2022-12-09_16-52-44.png
|
 |
|
666
|
Thu Jan 12 08:55:33 2023 |
SC/ND/IC/VK/VM | | Anneau | Ring Commissioning |
|
Faisceau | |
Mise en chauffe modulateur et refroidissements
Résistivité : 3.53 MOhm et Pression eau : 3.7
9:40: Cyclage des aimants. Problemes habituels.
10:20 Beam ON
10:30 Scan charge phase
10:40 Chargement recette LI+TL 05/01 11h07
10:44 Chargement recette 11/01 17h31 LE non optimum
Phase section: 118 degrees
Faisceau bien centre sur TL/DG/SST.02 mais bouge beaucoup (cf images)
11:10 Reglage des fentes (15mm;25mm)
TL/DG/SST.03: Le faisceau bouge de 0.2 tache focale.
Tentative d 'injection dans la ligne d 'extraction: cela ne marche pas.
Explication de Hayg: il faut aussi aller EL/PS/DPI qui n'etait pas dans la recette.
Le changement d' energie du faisecau pose probleme pour l'anneau: nous devons tout reajuster.
Tentative de chargement des recette anneau precedentes.
Nouvelle valeur pour RI-C1/PS/DP.01: 176.42A
13:25 RF section phase is now 111
Nouveau reglage des fentes: 10;34mmm
Apres midi: Tentative de stockage du faisceau sans succes...
Sur health check: le laser est passe en rouge.
17h57 Machine OFF
|
| Attachment 1: Screenshot_from_2023-01-12_10-14-16.png
|
 |
| Attachment 2: scan_charge_phase_min_0.0_max_360.0_10_42_52.png
|
 |
| Attachment 3: scan_charge_phase_min_215.0_max_235.0_10_43_15.png
|
 |
| Attachment 4: dispersion_10_53_55.png
|
 |
| Attachment 5: 2023-01-12_11_02_15_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_1000.png
|
 |
| Attachment 6: 2023-01-12_11_01_07_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_4000.png
|
 |
| Attachment 7: 2023-01-12_11_09_21_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_1000.png
|
 |
| Attachment 8: 2023-01-12_11_10_11_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_1000.png
|
 |
| Attachment 9: dispersion_13_17_51.png
|
 |
| Attachment 10: 2023-01-12_13_29_17_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.png
|
 |
| Attachment 11: Screenshot_from_2023-01-12_17-55-01.png
|
 |
|
668
|
Fri Jan 13 17:25:33 2023 |
ND | Under Process | Anneau | Aimants |
|
Test cyclage aimants | |
17h25: Test de cyclage de
RI-C1/PS/QP.05
RI-C1/PS/QP.06
RI-C2/PS/QP.02
Resultats
RI-C1/PS/QP.05
RI-C1/PS/QP.06: Failed at 11% when magnet reached 10A => Ne pas cycler au dela de 9.4A
RI-C2/PS/QP.02: Failed at 11% when magnet reached 10A=> Ne pas cycler au dela de 8.5A |
|
669
|
Wed Jan 18 14:02:39 2023 |
IC | Under Process | Anneau | Aimants |
|
RE: Test cyclage aimants | |
I have decresed the Imax to 8 A and loaded the new cycling curves
RI-C1/PS/QP.06 and RI-C2/PS/QP.02: normally cycling with Imax 8 A , finish without error => PS to be checked for Imax >8 A (nominal 10 A
| ND wrote: |
|
17h25: Test de cyclage de
RI-C1/PS/QP.05
RI-C1/PS/QP.06
RI-C2/PS/QP.02
Resultats
RI-C1/PS/QP.05
RI-C1/PS/QP.06: Failed at 11% when magnet reached 10A => Ne pas cycler au dela de 9.4A
RI-C2/PS/QP.02: Failed at 11% when magnet reached 10A=> Ne pas cycler au dela de 8.5A
|
|
| Attachment 1: cylage_quad8A.png
|
 |
|
818
|
Thu Nov 16 08:52:14 2023 |
SC/IC/JNC/VK/HG/VM | | Anneau | LI | LE | Ring |
|
Faisceau anneau point de fonctionnement | |
8h52 : mise en chauffe modulateur et chillers, cyclage des aimants
10h15 : Le laser n'est pas centré dans l'iris malgré le feedback
Modification de M5 à la main car non centré dans l'iris malgré le feedback (xposition 38 à 98), yposition non modifiée : 96 prise d'images
10h33 scan charge phase, charge environ 100 pC
Chargement de la recette
Re-réglage linac phase attenuateur etc.... pour arriver à injecter
Faisceau pas à la bonne énergie au départ
Injection faisceau dans l'anneau, problème avec la cavité RF : pas de puissance
Injection anneau
Modulateur à 1090V au lieu de 1100V parce que la position sur apres dipole BPM2LIB2 saut de 4 mm-5mm ensuite le signal sur bpm était mieux et linjection plus stable (difficile distanguer de cout manques).
C'est un problème pour injection et stockage dans l'anneau
A regarder pour résolution du problème avec l'équipe RF ?
Point de fonctionnement identique au 24/10 sauf le soleno qui est à 220A au lieu de 180A.
En regardant moniteur d'injection (screenshot), on peut penser que les sauts sont corrélés aux sauts obervés sur BPM2-TL2. Ils sont aussi corrélés à une mise à zéro des icts.
Prise de données anneau
Comportement etonnant du faisceau à 16h25 environ, apparition de signaux incohérent sur ICT
16h27 Perte du faisceau (cf screenshot de la charge) + Interlock sur la cavité RF + modification de l'énergie du faisceau nécessaire de bouger la valeur de l'attenuateur pour retrouver le faisceau en sortie de ligne de transfert.
16h50 Reprise de la prise de donnée anneau, redémarrage de la cavité RF (JNC), nouvelle valeur atténuateur section (1.7 à 1.5 dB environ = variation d'énergie)
Observation d'un saut de phase sur oscilloscope qui pourrait expliquer
16h58 A nouveau modification du comportement du faisceau, perte de charge sur ICT3, modification de la position du faisceau sur bpm2lib2, Changement de la position du faisceau sur tl/bpm2lib2,
Faisceau revenu à la normale on ne sait pas pourquoi
17h30 Arret faisceau
|
| Attachment 1: Screenshot_from_2023-11-16_14-48-02.png
|
 |
| Attachment 2: Screenshot_from_2023-11-16_14-49-27.png
|
 |
| Attachment 3: Screenshot_from_2023-11-16_16-40-05.png
|
 |
|
822
|
Thu Nov 23 08:51:44 2023 |
SC/KD | | Anneau | LI | TL | LE | Ring |
|
Faisceau LE | |
8h50 Mise en chauffe modulateur
Mise en route chillers et frigo
Problème laser photocathode : en cours d'investigation par Kevin et Viktor
10h Résolution problème laser nécessaire, arret modulateur, chillers et frigo
|
|
Draft
|
Thu Jan 23 17:03:45 2025 |
Ring team | | Anneau | Ring Commissioning |
|
Ring Working Points 50 MeV/ 61.5 MeV / 70 MeV | |
50 MeV
Configuration: good_20250123_17_53_01 "Working Point at 50 MeV for X_rays"
After RCDS optimization with X-rays good_20250124_15_05_25 "Updated WP with RCDS on X-rays 50 MeV "
Update from 14/02/2025 => Configuration: good_20250214_14_21_55 "50 MeV WP 120 um"
RF Frequency: 500.10045 MHz (33.XXXX MHz)
Vertical size of the interation region: 124 um =>laser beam size: 75 um (assumed); electron beam size : 99 um
Beam orbit:
BPM around IP
BPM3 ri-c1/dg/bpm.04-lib.03: x= 0.6 mm y = -2.87 mm
BPM4 ri-c1/dg/bpm.05-lib.04: x= 0.5 mm y = -2.96 mm
After RCDS
BPM3 ri-c1/dg/bpm.04-lib.03: x= 0.6 mm y = -0.18 mm
BPM4 ri-c1/dg/bpm.05-lib.04: x= 0.3 mm y = 1.88 mm
RF gun 231 deg. Sect. Att. set to 2.43 dB, Sect. phase is 209 dg. TL/DP current set to 159.3 A, Linac steerers H [1.16 -3.2], V [-2.25 2.86] ; TL BPM2 x = mm
Run with FPC P= 89 kW
X-ray intensity (synchronized mode): max 50000 pA ~2-3x10^10 ph/s
61.5 MeV
Configuration: good_20250214_16_29_22 "61.5 WP 177 um"
RF Frequency: 500.04545 MHz (33.XXXX MHz)
70 MeV
RF Frequency: 500.03165 MHz (33.XXXX MHz)
Att 0.3 dB
40 MeV
40 MeV. Sect. Att. set to 4.095 dB, Sect. phase is 205 dg. TL/DP current set to 125.38 A, Linac steerers H [1.19 -3.25], V [-3.05 3.47]
TL BPM 20= -2 mm
RF cavity 50 kV, Freq=500.11896 MHz
RF Frequency: 500.11851 MHz (33.341230 MHz)
Vert FPC scan : IP region 0.199 um
X ray flux asynch I3 ~ 370 pA (background level 310-315 pA)
43.7 MeV
RF gun 162 deg. Sect. Att. set to 3.51 dB, Sect. phase is 210 dg. TL/DP current set to 136.95 A, Linac steerers H [0.44 -2.77], V [-2.36 2.87]
TL BPM 20= -1.5 mm
RF Frequency: 500.1189 MHz
35 MeV
RF gun 162 deg. Sect. Att. set to 4.98 dB, Sect. phase is 202 dg. TL/DP current set to 111.3 A, Linac steerers H [], V []
TL BPM 20= -1.5 mm
RF Frequency: 500.1189 MHz
|
| Attachment 1: Screenshot_from_2025-01-23_17-35-51.png
|
 |
| Attachment 2: Screenshot_from_2025-01-23_17-34-36.png
|
 |
| Attachment 3: VerticalScanFPC_23012025.png
|
 |
| Attachment 4: First100turns_23012025.png
|
 |
| Attachment 5: BPMsigma_23012025.png
|
 |
| Attachment 6: closed_orbit_23022025.png
|
 |
| Attachment 7: Screenshot_from_2025-01-24_15-17-46_after_RCDS.png
|
 |
| Attachment 8: closed_orbit_updateRCDS_24012025.png
|
 |
|
Draft
|
Thu Jul 1 10:12:11 2021 |
Entered by Nicolas Delerue from 134.158.89.243 on Thu Jul 1 10:11:03 2021 | Not Fixed | | |
|
, entered from 134.158.89.243 | |
|
|
Draft
|
Mon Oct 18 11:26:58 2021 |
Entered by Super Team from 134.158.195.142 on Mon Oct 18 11:26:41 2021 | | | |
|
Shift condionnement RF : passage à 5Hz | |
|
|
Draft
|
Mon Oct 25 19:23:51 2021 |
Entered by Super Team from 134.158.195.142 on Mon Oct 25 19:23:35 2021 | | | |
|
, entered from 134.158.195.142 | |
Passage de la sect |