| ID |
Date |
Author |
Status |
Type |
Category |
Important |
Subject |
Icon |
|
611
|
Wed Oct 26 15:27:16 2022 |
Entered by Super Team from 134.158.195.141 on Wed Oct 26 15:27:01 2022 | | Urgent | Linac Commissionning |
|
| |
SST2 bugue depuis ce matin. Je pensais qu'il n' avait pas de faisceau dessus mais en fait non c'est la camera qui beugue.
SST2 a remarche qq minutes . Je l'ai retire puis remise . Elle ne marche de nouveau plus .
Je ne peux rien faire pour l'instant du programme etude TL prevu aujourd hui
Nicolas tente a distance de la faire fonctionner |
|
683
|
Thu Feb 16 19:25:09 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Feb 16 19:24:54 2023 | Not Fixed | Urgent | Diag |
|
| |
Voila en pj le status de cette semaine sur les calib LINAC BPM et Yag
Calib BPM LI BPMTL1 YAGTL1 : not OK
Calib YAGLI : ~ ok |
| Attachment 1: calib-bpm-yag.pdf
|
|
690
|
Tue Feb 21 10:23:56 2023 |
MJ KD HG | Not Fixed | Urgent | Linac Commissionning |
|
Synchro HS | |
10h20 HV on
Erreur sstLI
Qqun peut debloquer ca ? nicolas ?
c'est bon deremarrage serveur camera
Synchro HS on ne peut rien faire
reboot synthe baie 9 pour acquitter l'erreur network
Ca ne change rien
BESOIN URGENT d'un expert SYNCHRO
|
| Attachment 1: sst1
|
| Attachment 2: charge.png
|
 |
|
691
|
Tue Feb 21 12:32:54 2023 |
ND | Fixed | Urgent | Linac Commissionning |
|
RE: Tentative identification pb synchro | |
Tentative de comprehesion de ce que veux dire "Synchro HS on ne peut rien faire".
- Health Check: Pb RF resolu par redemarrage RDP. Pb Alimentation sur DPi. Pb Archivage.
- Signaux sur les synthe et gene normaux.
- Synthe synchro: la sortie du synthe de la baie 9 avait ete desactivee par le reboot => reactivee. Synthes OK.
- Vu avec Viktor: Synchro au niveau du laser OK. Jitter comme d'habitude.
- Camera laser sur 0.1 s exposure => voit laser; sur 0.09s => pas de laser (en continu) => trigger laser stable
Pas d'indication d'un probleme syncho.
| MJ KD HG wrote: |
|
10h20 HV on
Erreur sstLI
Qqun peut debloquer ca ? nicolas ?
c'est bon deremarrage serveur camera
Synchro HS on ne peut rien faire
reboot synthe baie 9 pour acquitter l'erreur network
Ca ne change rien
BESOIN URGENT d'un expert SYNCHRO
|
|
| Attachment 1: health_check_2023_02_21_12_34.png
|
 |
| Attachment 2: Screenshot_from_2023-02-21_12-39-39.png
|
 |
|
693
|
Tue Feb 21 12:58:08 2023 |
ND | Fixed | Urgent | Linac Commissionning |
|
RE: RE: Tentative identification pb synchro | |
Pour plus d'explication et d'observation pour tests de vérification :
- La phase canon glissait sans cesse (quelques degrées par minutes) et avait des sautes d'un coup sur l'autre (visible sur le faisceau dans le canon à la phase de focalisation max)
- Il y avait aussi des dérives intermittante de plusieurs degrès d'un coup en plus du glissement plus "doux".
==> hypothèses sur observation : la déclenche du laser ne semble pas stable par rapport au 3GHz boucle canon. Le laser lui semble stable avec le 500MHz qu'il reçoit (lien entre les deux fréquences ?)
* L'ampli laser est le fautif (après une chauffe de plusieurs heures cela semble étrange et jamais vu).
* Il n'y a pas de synchro stable entre les deux fréquences (500 MHz Laser et 3GHz canon).
| ND wrote: |
|
Tentative de comprehesion de ce que veux dire "Synchro HS on ne peut rien faire".
- Health Check: Pb RF resolu par redemarrage RDP. Pb Alimentation sur DPi. Pb Archivage.
- Signaux sur les synthe et gene normaux.
- Synthe synchro: la sortie du synthe de la baie 9 avait ete desactivee par le reboot => reactivee. Synthes OK.
- Vu avec Viktor: Synchro au niveau du laser OK. Jitter comme d'habitude.
- Camera laser sur 0.1 s exposure => voit laser; sur 0.09s => pas de laser (en continu) => trigger laser stable
Pas d'indication d'un probleme syncho.
| MJ KD HG wrote: |
|
10h20 HV on
Erreur sstLI
Qqun peut debloquer ca ? nicolas ?
c'est bon deremarrage serveur camera
Synchro HS on ne peut rien faire
reboot synthe baie 9 pour acquitter l'erreur network
Ca ne change rien
BESOIN URGENT d'un expert SYNCHRO
|
|
|
|
694
|
Tue Feb 21 13:20:06 2023 |
ND | Fixed | Urgent | Linac Commissionning |
|
RE: RE: RE: Tentative identification pb synchro | |
Si c'était un glissement "doux" cela peut-être un problème de thermalisation. Est-ce que la température de l'eau était bonne?
| ND wrote: |
|
Pour plus d'explication et d'observation pour tests de vérification :
- La phase canon glissait sans cesse (quelques degrées par minutes) et avait des sautes d'un coup sur l'autre (visible sur le faisceau dans le canon à la phase de focalisation max)
- Il y avait aussi des dérives intermittante de plusieurs degrès d'un coup en plus du glissement plus "doux".
==> hypothèses sur observation : la déclenche du laser ne semble pas stable par rapport au 3GHz boucle canon. Le laser lui semble stable avec le 500MHz qu'il reçoit (lien entre les deux fréquences ?)
* L'ampli laser est le fautif (après une chauffe de plusieurs heures cela semble étrange et jamais vu).
* Il n'y a pas de synchro stable entre les deux fréquences (500 MHz Laser et 3GHz canon).
| ND wrote: |
|
Tentative de comprehesion de ce que veux dire "Synchro HS on ne peut rien faire".
- Health Check: Pb RF resolu par redemarrage RDP. Pb Alimentation sur DPi. Pb Archivage.
- Signaux sur les synthe et gene normaux.
- Synthe synchro: la sortie du synthe de la baie 9 avait ete desactivee par le reboot => reactivee. Synthes OK.
- Vu avec Viktor: Synchro au niveau du laser OK. Jitter comme d'habitude.
- Camera laser sur 0.1 s exposure => voit laser; sur 0.09s => pas de laser (en continu) => trigger laser stable
Pas d'indication d'un probleme syncho.
| MJ KD HG wrote: |
|
10h20 HV on
Erreur sstLI
Qqun peut debloquer ca ? nicolas ?
c'est bon deremarrage serveur camera
Synchro HS on ne peut rien faire
reboot synthe baie 9 pour acquitter l'erreur network
Ca ne change rien
BESOIN URGENT d'un expert SYNCHRO
|
|
|
|
|
706
|
Mon Mar 6 12:16:31 2023 |
MJ HG KD VC | Not Fixed | Urgent | Linac Commissionning |
|
URGENT SST off | |
Camera SST inutilisable en debut de shift. IL FAUT ABSOLUMENT ARRETER de faire des trucs sur les cameras entre 2 shifts ! je n'ai pas les competences pour remettre les sst en marche. Les boutons n'y font rien;
Nicolas peux-tu agir pour qu'on puisse commencer le shift. Merci
Force kill force start des servers necessaire pour toutes les cameras (merci Hayg)
phase charge max max foc 331 bpmLI 0.6/1.6
charge 65 pC
energie max -50
scan soleno yag1
passage section phase 110 1.42db
scan soleno yag2 a la main car script ne marche pas : shutter pc ne marche plus ER/HF/RAC.17-API.DO1/DO14
passage TL phase section 110 1.45db
ihm SST HS : se ferme ou pas selon la camera demandee, selon le sens du vent peut-etre, qui sait ...
Plantage camera --> Force kill force start des servers necessaire pour toutes les cameras
modulateur tombe 14h34
Modulateur ON
Synthe_ring passe de 500 a 500.5MHz --> image 2023-03-06_14-44-27.png
Synthe_ring passe de 500.5MHz a 500 --> image 2023-03-06_14-49-54.png
pB synchro corrigé
données enregistrées (dans mesure)
connecteur ressere ~ 17h20
donnee PiS BPMTL2 enregistree
|
| Attachment 1: SST_HS_023-03-06_12-14-40.png
|
 |
| Attachment 2: 2023-03-06_14-44-27.png
|
 |
| Attachment 3: 2023-03-06_14-49-54.png
|
 |
|
711
|
Mon Mar 13 12:18:02 2023 |
MJ | Not Fixed | Urgent | Linac Commissionning |
|
IHM SST HS - URGENT | |
IHM sst HS en debut de shift cf image : toutes les cases show camera sont blanches yag 2 3 4 !! RIEN ne marche
URGENT
Nicolas ?
C'est resolu. |
| Attachment 1: IHM_HS_2023-03-13_12-42-01.png
|
 |
| Attachment 2: Screenshot_from_2023-03-13_12-55-32.png
|
 |
|
713
|
Mon Mar 13 13:54:31 2023 |
MJ | Not Fixed | Urgent | Linac Commissionning |
|
Le bouton PHASE CANON sur le panneau IHM NE FONCTIONNE PLUS !!!!!!!!!!! | |
Le bouton PHASE CANON sur le panneau IHM NE FONCTIONNE PLUS !
plus d'acces a la phase canon.
Nicolas t'as fait qqchiose ? |
|
732
|
Tue Apr 11 15:38:34 2023 |
Entered by Super Team from 134.158.195.141 on Tue Apr 11 15:38:15 2023 | | Urgent | Diag |
|
probleme camera TL1 | |
camera TL1 senble de pas trigger correctement
Nicolas peux tu appeler la sdc stp
Plus besoin desole pb resolu |
|
Draft
|
Thu Nov 6 08:30:52 2025 |
Entered by Super Team from 134.158.195.141 on Thu Nov 6 08:30:37 2025 | Under Process | Urgent | TL | LE |
|
| |
08h30 Warm-up ThomX: Modulator, Laser, Fridge
08h36 Chillers were started, cycling all magnets
09h33 HV is ON
09h34 HV set to 1215 V RF Gun phase is 188 dg.
11h09 Help needed! Something is wrong with the TL bends.
11h44 Something is wrong with the section attenuator. Reducing the attenuation results in a decrease in the section's output power.
12h15 OK, finally we got it. RF Gun phase 182 dg. Sect. phase 298 dg. Sect. Att. 0.59 dB, 50 MeV, Li/HFI/ATT.01-MOT.01 ==> 311 steps Sect. Output -0.123 V
Sect. Output -0.123 V Mot. pos. 1699 steps but Sect phase = 211 dg. Calc/Li/HFI/ATT.01-MOT.01 is not working properly.
12h31 Beam is in the ring W/O RF
12h35 RF 100 kV
BBA Hor.
BPM Ind. Offset
[1 1] ==>-0.129
[1 2] ==>0.017
[1 3] ==>-0.722
[1 4] ==>0.425
[1 5] ==>-0.022
[1 6] ==>-0.139
[1 7] ==>0.091
[1 8] ==>0.272
[1 9] ==>0.375
[1 10] ==>-0.022
[1 11] ==> -0.272
[1 12] ==> -0.400 |
| Attachment 1: SectOutput20251030.png
|
 |
| Attachment 2: SectOutput20251106.png
|
 |
|
1154
|
Thu Nov 20 09:26:33 2025 |
VM, IC | Under Process | Urgent | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
BBA Ring | |
Goal: Ring BBA
09h14 Unable to start thomx. Need help. Probably problem with cooling water.
12h35 Warm-up the modulator, Chillers started
12h42 Cycling all magnets
12h57 It seems that leds at LI/SST1 and TL/SST1 are ON. . Fix. IHM ==>'Camera Power'==> 'Power 3'
13h42 HV is ON
14h06 Strange situation: the modulator works, but there are no radio frequency signals (see the screenshot).
15h46 Maher fix it. HV is ON
16h16 the modulator works, but there are no radio frequency signals
Need help from Maher to restart the pre-ampli.
16h34 Up to now, the beam was transported only till TL/SST.02. Very often we observed interlock (something happen in the IGLOO ?). After this probably the pre-ampli stopped operating. This is our observation. Moreover, several mistriggers.
For the RF cavity, there is the problem to set the Voltage. It can be done only manually by Mohamed.
The control of the iris thouth the ELLO com4 does not work. It says "COM4 not available".
Shift program even has not started.
16h54 STOP
|
| Attachment 1: Errors.jpeg
|
 |
| Attachment 2: Screenshot_from_2025-11-20_14-04-53.png
|
 |
|
Draft
|
Fri Feb 27 08:00:46 2026 |
IC, VM | Under Process | Urgent | Laser |
|
, entered from 127.0.0.1 | |
07h55: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
09h00 HV is on
09h35 recipe_recipe_LI_TL_RI_all_20260226_14_47_33.txt loaded. Beam is in the ring, RF cav. 100 kV, phase 32 dg., F=500.108655MHz
RF Gun phase 75 dg., Sect. att. 2.532 dB, sect. phase 220 dg., linac steerers: V [0.23 -2.68], V [-2.49 3.27], charges (BPMs) around -110 pC
At F=500.108655MHz and TL/BPM02 X=2mm the orbits are almost the same with and without RF (see screenshot)
At given ring settings, the MRSV size is highly dependent on the DPI, septum, and kicker settings, which are determined by the injection energy (Sect. att. and line phasing).
A combination of DPI, septum, and kicker settings should be adjusted to reduce the MRSV size.
12h35 The laser spot has moved outside the screen!!! Help needed!!!
Kevin fixed it.
Additional research showed that F=500.10045 MHz is suitable for ring operation.
15h55 ThomX was stopped.
|
| Attachment 1: Screenshot_from_2026-02-27_10-25-37.png
|
 |
|
Draft
|
Wed Jun 3 08:54:55 2026 |
IC, VM | Under Process | Urgent | LI | RF Anneau |
|
Restart of the accelerator | |
08h45 Start-up modulator, laser, magnets
09h38 Shutter Laser Linac is yellow. Tuning off the gun operation key does not change it to the red. Need help.
09h55 HV is on
09h56 HV is off. The fridge was started then chillers.
10h20 The laser shutter is OK. HV is on
recipe_recipe_LI_TL_RI_all_20260422_18_34_34.txt loaded
Linac steerers were adjusted.
11h35 Energy = 50 MeV, Laser Phase 9 dg., Sect. Phase 223 dg., Sect. Att. 2.19 dB, I_Gun -48.3388 pC, I_Linac -54.8343 pC, I_TL -53.5573 pC RF_Ampl. 0 kV, RF_Phase -30.5 dg.
Beam is in the ring W/O RF
11h45 RF is on
11h54 Energy = 50 MeV, Laser Phase 9 dg., Sect. Phase 223 dg., Sect. Att. 2.12 dB, I_Gun -49.1448 pC, I_Linac -55.6953 pC, I_TL -54.5153 pC RF_Ampl. 49.3668 kV, RF_Phase 35.5 dg.
It looks like RF cavity tuning does not work. Help is needed.
12h07 Mesure d'energie en sortie canon sur LISST1 en fonction du courant du steerer LI/PS/STR.01-H.01
'Energy=4.83MeV'
Several scans of the laser attenuator 200 to 430 at the Gun attenuator 0, 1, 2, 3 dB but at the same phase.
13h22 Standby
13h32 HV is on
15h17 Thomx was stopped
|
| Attachment 1: GunCharge_vs_LaserAtt.png
|
 |
| Attachment 2: GunDarkCurrent_vs_Att.png
|
 |
|
2
|
Tue Oct 18 14:25:34 2016 |
Entered by Hugues Monard from 134.158.89.218 on Tue Oct 18 14:25:09 2016 | Not Fixed | Shift summary | Prise de donnees |
|
test de log | |
jeudi 18 octobre
il faudrait mettre un place un canevas type pour un point de fonctionnement que l'on reconduirait tous les jours dans lequel on noterais quelques paramètres à la main...
laser : Elaser = xx µJ taille x = 1.1 mm tailley = 1.3 mm
puissance RF : Prc = 20 mV
etc.. |
| Attachment 1: Timing_Osc-1a4.jpg
|
 |
|
3
|
Tue Oct 18 15:12:24 2016 |
Entered by Hugues Monard from 134.158.89.218 on Tue Oct 18 15:12:09 2016 | Under Process | Shift summary | resumes |
|
| |
test |
| Attachment 1: 2014-05-15_Conditionnement_circulateur_RF_et_canon_PHIN.pptx
|
|
Draft
|
Thu Apr 8 21:14:09 2021 |
Entered by talour from 134.158.205.2 on Thu Apr 8 21:11:41 2021 | Fixed | Shift summary | Prise de donnees |
|
| |
|
|
11
|
Tue Jun 8 12:39:23 2021 |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 12:39:09 2021 | Under Process | Shift summary | etc |
|
summary du matin | |
Bonjour,
la synchro est effective
le modulateur est pret
L'oscillo est opérationnel
rdv à 13h30-45 pour la ronde
A+
Christelle |
|
24
|
Tue Jun 8 17:40:20 2021 |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:40:07 2021 | Fixed | Shift summary | resumes |
|
Résumé de la journée | |
- Pour les atténuateurs : les butées ont été trouvées, ATT02-MOT01 c'est la canon, ATT01-MOT01 c'est la section.
- Des difficultés ont été rencontrés avec le modulateur : Interlock à cause de l'eau, interlock alim HT, reboot modulateur et vérification de l'autorisation de tir MPS faite.
Le modulateur fonctionne maintenant sans problèmes à une tension de 1240V et un vide klystron de 1.2 uA qui devrait diminuer par la suite. Les mesures radioprotection ont été faites
- Pour le MPS, cliquez sur Paramètres en bas de l'écran principal puis vérifier que LINAC est on.
Pour demain :
- Démarrer régulation eau en plus du modulateur
- Vérifier les signaux RFs sur oscillo et Réglage des retards (demarrage_delays)
- Ne pas mettre beaucoup de puissance, vérifier la chaine RF et vérifier les atténuateurs
- Vérifier caméra et ICT |
|
28
|
Wed Jun 9 14:03:09 2021 |
Entered by bruni from 134.158.195.141 on Wed Jun 9 14:02:53 2021 | Under Process | Shift summary | Prise de donnees |
|
| |
Repérage des chaines de mesures RF : atention, les coupleurs sur guides indique une atténation réfléchie étiquettée à 70dB, mais elle est de 60dB
On va retirer les atténuateurs devant les cristaux pour voir les signaux RF avec très peu de puissance et une largeur RF de 1us
On règle l'atténuateur section
|