Entry   VK, VM, IC; Recomissioning of the SR, search for the revolution frequency  13x

8h50 Start of the machine

Laser amplifier was somehow OFF. Very strange situation and not clear why it happen. To be understood.

Call Viktor, who came and start the laser.

Start the beam. No beam. No e- from gun. Call Vincent.

Many instabilities in e-beam signals.

Retuning Linac, attenuator =2.114  for 50 MeV (why ??? calibration problem ?)

Work on orbit correction, starting from natural one. Slight optics tuning. Frequency 500.067 MHz. The hor. tune is 0.18

Small horizontal, small vertical steerers.

At some aatenuator or frequency values, the energy jitter appears and a lot of mistriggers.

Good storage obtained. Recipie saved : recipe_recipe_LI_TL_RI_good_20240301_15_50_35.txt

For TL orbit and Ring Orbit see screenshots.

 

 

 

 

 

 

16.10 Stop machine. Ronic, Daniele need access for FP Cavity.

 

 

 

Entry   VK, VM, IC on Thu Feb 29 ; Recomissioning of the SR, search for the revolution frequency  Screenshot_from_2024-02-29_12-15-58.pngScreenshot_from_2024-02-29_14-27-36.pngScreenshot_from_2024-02-29_11-27-21.png

Start of the machine 9h

Optimization of the beam transport to the Ring.

Work on the lattice of the Ring and search for the revolution frequency.

Attempt to perform teh BBA

At 16h beam is taken by Linac team (CB/JNC)

 

 

Entry   VK, VM, IC; Recomissioning of the SR, search for the X-rays Screenshot_from_2024-03-07_09-02-36.png

8h50 Warming up the machine

Problem with the vaccum around the RF cavity (see screenshot attached). Intervention of vacuum team is needed.

Mohamed is installing the powermeter to monitor the incomingt RF power for the accelerating structure.

Laser camera should be checked before the beam start-up

Due to the vaccum cable connector we can not start the beam.

Entry   VC, DN, MJ, IC, VM; Recherche position image camera MRSV 2025-04-30_16-23-33_MRSV_fwhm_trends.png2025-04-30_17-14-26_total_beam.png2025-04-30_17-15-03_coupe_moitie_basse.png2025-04-30_17-15-54_coupe_moitie_haute.png

Start chauffage 9H

There were some problems: the phase section motor was in the wrong position, although the readings were normal; The rear door of the septum power supply was not fully closed.

12h04 Beam is in the ring, RF cav. at 50 kV, phase is 22.5 dg., the receipt from 17/04/2025 12:31 for the ring.  RF gun phase is 153.6 dg. Sect Att. is 2.74 dB, Sect. phase is 211 dg. Receipt saved to referenses folder with MSRV mark

** Recherche point image camera MRSV

Deplacement vertical camera par pas d'environ 5 mm  - Mesures des fwhm X et Y camera

12h15 Modulator has been put into standby mode: access to the bunker.
12h45 HV is 'ON' RF gun phase was set to 143.6 dg. Sect phase was set to 208 dg. Charges: -41 pC, -41 pC, -45 pC, Ring TbTsum about 2e7
13h55 Modulator has been put into standby mode: access to the bunker.
14h13 HV is 'ON'
14h16 Modulator has been put into standby mode: access to the bunker.
14h29 HV is 'ON'
14h35 Modulator has been put into standby mode: access to the bunker.
14h49 HV is 'ON'
15h00 Modulator has been put into standby mode: access to the bunker.
15h15 HV is 'ON'
15h22 Modulator has been put into standby mode: access to the bunker.
15h38 HV is 'ON'  RF Gun phase is 144.6 dg.
15h46 Modulator has been put into standby mode: access to the bunker.
16h06 HV is 'ON'
16h27 Modulator has been put into standby mode: access to the bunker.
16h46 HV is 'ON'

==> cf screenshot des trends fwhm X et Y MRSV
       Points notes sur brouillon par Daniele, a fitter avec une parabole pour determiner les 2 minima X et Y (astigmatie)
       Data des trends : MRSV_fwhm_X.dat et MRSV_fwhm_Y.dat dans data/shared

** Verification avec le laser des axes X et Y pour voir s'ils ne sont pas inverses

16h52 Modulator has been put into standby mode: access to the bunker.

Les axes X et Y MRSV sont bien les axes reels X et Y
Cf screenshots : total_beam, coupe_moitie_basse, coupe_moitie_haute

** Test de la procedure de calibration de la cam MRSV

17h28 HV is 'ON'

Position verticale faisceaux sur les 2 bpm autour du dipole :
     1) nominal MRSV  
     2) +0.8
     3) +1
     4) retour nominal MRSV
==>  La positon verticale sur MRSV varie bien comme on l'attend
        C'est reproductible  ==>
Calibration a faire avec la camera en position image
 

17h42 Stop ThomX
 

 

Entry   Entered by Super Team from 134.158.195.142 on Wed Nov 17 14:00:15 2021; Recherche du signal ICT après la section 2021-11-17_14_19_8_scan_charge_phase_TL1.jpg2021-11-17_14_20_22_scan_charge_phase_Li.jpg

Alexandre Moutardier :

Signal ICT (ER/CA/RAC.05-ELR.01-WAC.02 channel CH3) pas visible après la section bien que le faisceau passe au vu des signaux sur le BPM et l'écran.
-> PB résolue :  le WaveCatcher (WAC) était en mode trigger interne et non en mode Externe (code 3)

Signal bien visible, et une bonne partie du faisceau semble passer la section.
Mesure de charge (NON OFFICIEL !) a partir des données ICT brute :

  avant la section après la section
charge 87 pC 78 pC
deviation standard 5 pC 5 pC

Soit 90% de charge passant la section.

Entry   Entered by Moutardier Alexandre from 134.158.195.142 on Mon Feb 14 10:11:53 2022; Recette synchro 

Nouvelle recette synchro par défault enregistré : 20220201_reference.xml

A tester en faisceau dans la journée.

Ne pas en utiliser d'autre !
 

Entry   Entered by SC/HM/VC from 134.158.195.141 on Fri Feb 11 14:15:43 2022; Recette 

Recette sauvée : 20220211_1417.xml

Entry   Entered by sophie chance from 134.158.195.142 on Tue Oct 12 15:35:55 2021; Radioprotection 

Mesures radioprotection en cours

Entry   IC, VM, VK, ND; RIng commissioning 10x

8:50 Mise en chauffe

10h Starting the beam

Tuning of the TL

We started from the last Friday setting and the beam storage was not succefull.

Optimization of the storage. The RF freq was set to 500.424 MHz. RF voltage was 40-100 kV

After several optimizations, the good storage was obtained ~15h

The final RF freq 500.4099 MHz

The data was taken concerning the betatron oscillations. Should be analysed offline.

16h40 Shift finished.

 

Entry   VK, IC; RF frequency of the Ring scan_charge_phase_min_0.0_max_360.0_10_43_35.pngScreenshot_from_2023-05-19_13-50-56.pngScreenshot_from_2023-05-19_13-56-41.pngScreenshot_from_2023-05-19_12-15-50.png

In the morning, after the start-up pf the machine, scan phase-charge and small tuning it was possible to store the beam with the settings from previous day.

The storage was optimize withthe dipole current of 159.9 (best storage up to now). RF cqvity voltqge 20-100 kV.

Work on the orbit correction and BPM.

The the dipole current was tuned to the nominal current 159.3 A with sufficient storage. AT ~18h the RF cavity went down.

To be continued.

Entry   MJ, KD; RF et anneau 24_4mm.png22_4mm.png

Apres 18h30 : prise ne main de la machine pour aller dans la LE ==> le kicker d'extraction est interlocké (abdandon) 

Essaie avec la derniere recette de l'anneau : à 159.3A le stockage n'est pas tres bon (cavité OFF)

On essai de jouer sur le plongeur pour accorder la cavité à la fréquence de révolution du paquet (voir 2 screenshot de l'oscilloscope).

La cavité à une forte influence sur le stockage, mais la forme n'est pas la même

- au nominal (24.4mm) où le faisceau semble mieux "entrer" dans l'anneau mais "meurt" plus vite.

- à 22.4 mm le faisceau semble vivre dans l'anneau plus longtemps mais est moins bien stocké. Quelle est la fréquence associé à cette valeur de plongeur ?

 * Est ce qu'il n'y a pas à creuser sur l'accord de la cavité au faisceau ? 

 * La fréquence principale de la FFT (16.68MHz) ne semble pas bouger (que ce soit avec les dipôles ou avec la cavité RF). Que représente cette valeur ? 

20h30 : machine à l'arrêt

Entry   VM, HG, RC, SC; RF conditionning : 2 aout  

Start from 10 dB 

decrease up to 1 dB : Vacuum is OK decrease up to 10â»8 mBar

11h10 : att.sec 0.7 dB ==> vide in section 1.1 10-8 mbar & vide out section 8 10-9 mbar 
yesterday : att.sec 0.7 dB (Pis = 21 MW) ==> vide in section  1.1 10-8 mbar & vide out section 1.1 10-8 mbar

11h15 : att.sec 0.6 dB ==> vide in section 1.0 10-8 mbar & vide out section 1 10-8 mbar 
yesterday : att.sec 0.6 dB (Pis = 21.5 MW) ==> vide in section  1.2 10-8 mbar & vide out section 1.3 10-8 mbar

11h22 : att.sec 0.5 dB ==> vide in section 1.0 10-8 mbar & vide out section 1 0-8 mbar 
yesterday : in section à 1.1 10-8 mbar & vide out section 1.4 10-8 mbar

11h30 : att.sec 0.4 dB ==> vide in section 1.0 10-8 mbar & vide out section 1 1-8 mbar 
yesterday : in section à 1 10-8 mbar & vide out section 1.4 10-8 mbar

11h38 : att.sec 0.3 dB ==> vide in section 1.0 10-8 mbar & vide out section 1 1-8 mbar 
yesterday : in section à 1 10-8 mbar & vide out section 1.4 10-8 mbar 

11h39 : Interlock section V4 jump

11h40 :Back to 0.4 dB

11h46 :Back to 0.3 dB : vacuum V4, V5 < 10^-8 mBar, V4 decrease 

12h07 : Interlock machine with V4 jump

12h08 :Back to 0.4 dB

12h15 : Interlock machine 
12h22 : Interlock machine
​12h25 : Interlock machine

12h28 :Back to 3.4 dB

​12h28 : Interlock machine
​12h28 : Start with lower voltage HT : 1205 V, Att 0.4 dB
12h32 :Back to 0.1 dB, HT 1205
​
12h42 : Interlock machine, V5 increase
​12h58 : Interlock section no vacuum increase
​13h10 : restart after 10 minutes to relax cool
 the machine 
​13h18 : HT --> 1208 
​13h20 : Interlock section no vacuum increase

 

​13h30 : Att back to 3dB and decrease slowly : 0.9 dB now

​13h38 : Att 0.8 dB

13h44 : Att 0.7 dB ==> vide in section 9.9 10-9 mbar & vide out section 1.1 0-8 mbar 

14h : Att 0.6 dB ==> vide in section 9.9 10-8 mbar & vide out section 1.2 0-8 mbar 

14h15 : Att 0.5 dB ==> vide in section 9.2 10-8 mbar & vide out section 1.2 0-8 mbar 

14h30 : Att 0.4 dB ==> vide in section  10-8 mbar & vide out section 1.2 0-8 mbar 

14h34 : Att 0.3 dB

14h42 : Att 0.2 dB vide in section 8e-9 vide out section 1.1 e-8

Interlock 14h43 mais pas de réfléchi => passsage en mode persistence sur l'oscillo pour vérifier qu'il n'y a pas du tout de réfléchi

14h53 => on est revenu a Att. 0.2 dB => in section 8e-9 vide out section 1.1 e-8

15h00 => on est passé à  Att. 0.1 dB => interlock encore mais on ne voit pas de réfléchi !
               relance immédiate à Att. 0.1 dB => in section 7e-9 vide out section 9e-9

15h22 : att.sec 10 dB apres interlock reseau

15h23 : interlock sans reflechi visible sur oscillo

15h25 : interlock reseau

15h26 : att sec 10dB  ==> vide in section 2.6 10-9 mbar & vide out section 8 10-9 mbar 

15h29 passage à 15dB

15h32 : att sec 14 dB  ==> vide in section 1.5 10-9 mbar & vide out section 2.4 10-9 mbar 

15h33 : interlock reseau

15h35 : att sec

15h37 interface rf conditionning ne marche plus pour bouger attenuateur, rechargement de l'interface, semble ok maintenant

15h38 : att.sec  20 dB ==> vide in section 1.4 10-9 mbar & vide out section 2.3 10-9 mbar 

15h40 : att sec 20 dB interlock sans réfléchi visible sur oscillo

15h40 relance à 20 dB

15h44 interlock sans reflechi klystron

15h45 : relance à 20dB

15h46 : interlock reseau

15h47 Pause de 10 minutes

16h00 reprise avec att sec 10dB ==> vide in section 2.7 10-9 mbar & vide out section 2.1 10-9 mbar 

16h06 att sec 9dB ==> vide in section 2.9 10-9 mbar & vide out section 2 10-9 mbar

16h10 att sec 8dB ==> vide in section 3.3 10-9 mbar & vide out section 2 10-9 mbar

16h14 att sec 7dB ==> vide in section ? 10-9 mbar & vide out section ? 10-9 mbar

16h14 interlock

16h15 reprise att sec 7dB ==> vide in section 3.5 10-9 mbar & vide out section 2 10-9 mbar

16h22 att sec 6dB ==> vide in section 3.9 10-9 mbar & vide out section 1.9 10-9 mbar

16h27 att sec 5dB ==> vide in section 4.3 10-9 mbar & vide out section 1.9 10-9 mbar

16h31 att sec 4dB ==> vide in section 4.5 10-9 mbar & vide out section 1.9 10-9 mbar

16h35 att sec 3dB ==> vide in section 4.9 10-9 mbar & vide out section 2 10-9 mbar

16h39 att sec 2dB ==> vide in section 4.9 10-9 mbar & vide out section 2 10-9 mbar

16h43 att sec 1dB ==> vide in section 7.5 10-9 mbar & vide out section 2.8 10-9 mbar

16h47 att sec 0.9 dB ==> vide in section 8.7 10-9 mbar & vide out section 4.3 10-9 mbar

16h51 att sec 0.8 dB ==> vide in section 9.3 10-9 mbar & vide out section 6.4 10-9 mbar

16h55 att sec 0.7 dB ==> vide in section 9.5 10-9 mbar & vide out section 7.7 10-9 mbar

16h59 att sec 0.6 dB

17h interlock reseau

17h01 att sec 0.6 dB ==> vide in section 9.2 10-9 mbar & vide out section 8.7 10-9 mbar

17h05 att sec 0.5 dB ==> vide in section 9 10-9 mbar & vide out section 9 10-9 mbar

17h10 att sec 0.4 dB ==> vide in section 8.4 10-9 mbar & vide out section 1 10-8 mbar

17h42 interlock 0.4dB sans observation reflechi klystron

17h44 att sec 0.4 dB

17h46 att sec 0.3 dB ==> vide in section 7.8 10-9 mbar & vide out section 1 10-8 mbar

18h09 att sec 0.2 dB ==> interlock reflechi section

18h10 Fin de shift

 

 

Entry   Entered by sophie chance from 134.158.195.141 on Thu Oct 28 12:24:58 2021; RF + 5Hz + Solenoides 

Augmentation progressive du solenoide à 5Hz en cours

    Reply   Entered by Moutardier Alexandre from 91.168.92.148 on Thu Dec 16 10:39:49 2021; RE: test en ssh 

Modifications faites, testées et fonctionnelles.

Entered by Moutardier Alexandre from 91.168.92.148 on Thu Dec 16 10:39:49 2021 wrote:

Connection ssh sur client4 pour tester une modification de health_check

 

    Reply   ND; RE: shift du 20 février 2023 pb_vide_hc.pngpb_vide_atk.png

Healthcheck signal effectivement un probleme sur toute les vannes...  Et les atkpanels signalent un problème de communication... Est-ce que l'expert correspondant a été prévenu?

 

KD wrote:

8h30 : Mise en chauffe de la machine (frigo, chiller, laser, modulateur)

fosse vidée + circuit d'eau re-remplis

problème jauge vide : pas de relecture (IHM canon et IHM vide)

 

 

    Reply   ND; RE: shift du 20 février 2023 Capture_d’eÌcran_2023-02-20_aÌ€_10.15.37.png

Healthcheck signal effectivement un probleme sur toute les vannes...  Et les atkpanels signalent un problème de communi

KD wrote:

8h30 : Mise en chauffe de la machine (frigo, chiller, laser, modulateur)

fosse vidée + circuit d'eau re-remplis

problème jauge vide : pas de relecture (IHM canon et IHM vide)

 

 

    Reply   Entered by Marie Jacquet from 134.158.195.141 on Mon Feb 13 13:34:44 2023; RE: problemes avec SST et YAGLI 

1) Je viens de tenter de reproduire le problème. Il est normal que cela mette du temps à charger, surtout au premier allunage de la journée (initialisation des caméras).

2) Cette image montre l'écran YAG qui est inséré comme on peut le voir sur la lecture de position du moteur. Les LEDs étaient allumées ce qui explique les reflets sur l'écran. Ci-joint la même image avec les LEDs éteintes.

Pour mémoire on peut contrôller l'allumage des LEDs dans l'IHM_power.

Entered by Marie Jacquet from 134.158.195.141 on Mon Feb 13 13:34:44 2023 wrote:

1)  "Show camera"  soit ca plante , soit ca finit par s'ouvrir mais au bout de plusieurs minutes

2) l'image yagli en pj, ya un probleme je pense (pas de RF modulateur  est en standby ...)

 

 

 

 

 

    Reply   ND; RE: phase en delire 

Après un premier scan sur 0-360 degres le script lance un second scan sur la zone la plus probable de maximum de charge pour trouver plus précisement le meximum de charge. Il met ensuite la phase au maximum de charge - 50 degres ce qui correspond à peu prêt au maximum d'énergie.

MJ JNC wrote:

Qund on lance l'ihm charge phase, le plot charge phase arrive puis une routine cointinue par pas de 1 degres, je crois, puis lla phase part en delire, elle change tout le te,ps sans qu on ne fasse rien. J'ai constate cq plusieurs fois

 

    Reply   Entered by Super Team from 134.158.195.141 on Tue Feb 15 17:37:50 2022; RE: nouvelle position miroirs 

Fin du run : 18h50.

Machine OFF

Entered by Super Team from 134.158.195.141 on Tue Feb 15 17:37:50 2022 wrote:

Attenuation canon à 1 dB, nouvelle position du miroir M4 : PositionX = 410 mm, PositionY = 5380 mm

Calcul position BPM : barycentre X : 1.16e+06 +/- 1.88e+05 nm et Y = 8.06e+05 +/- 1.45e+05 nm, phase = 97 degres à 1 dB

A 0.5 dB, phase =  92 degres, barycentre X = 1.20e+06 +/- 2.17e+05 nm et Y = 6.3e+05 +/- 1.49e+05 nm

A 0 dB, phase = 76 degres, barycentre : X = 1.5e+06 +/- 2.95e+05 nm et Y = 3.52e+05 +/- 2.08e05 nm

On voit une évolution dans le barycentre mesuré sur les BPMs

 

 

    Reply   Entered by Viktor Soskov from 134.158.195.153 on Tue Feb 1 10:43:30 2022; RE: logiciel ihm 

Salut Viktor,

le Ds du Laser était arreté. C'est ok maintenant.

H

Entered by Viktor Soskov from 134.158.195.153 on Tue Feb 1 10:43:30 2022 wrote:

Le logiciel ihm ne démarre pas.

 