| ID |
Date |
Author |
Status |
Type |
Category |
Important |
Subject |
Icon |
|
Draft
|
Fri Apr 17 07:40:22 2026 |
IC,VM, HG, RC, DN | | Shift summary | Linac Commissionning | Ring Commissioning |
|
beam studies. FPC. | | 7h30 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
08h45 HV is on
Laser camera does not work. Help!!!
MRSV camera too!!!
The cemeras and laser are working now. But we do not see the laser beam. Daniele checked the laser spot in the casemat. Apparently it is cut. Help is needed with the laser!
12h ThomX Standby while waiting for the help |
|
Draft
|
Thu Apr 16 07:32:25 2026 |
Entered by Super Team from 127.0.0.1 on Thu Apr 16 07:32:14 2026 | | | |
|
, entered from 127.0.0.1 | | 7h30 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
9h00 HV is ON
10h33 Energy = 50 MeV, Laser Phase 77 dg., Sect. Phase 217 dg., Sect. Att. 2.546 dB, I_Gun -98.9021 pC, I_Linac -131.1291 pC, I_TL -120.2702 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
12h53 Energy = 50 MeV, Laser Phase 78 dg., Sect. Phase 218 dg., Sect. Att. 2.577 dB, I_Gun -97.6327 pC, I_Linac -124.7496 pC, I_TL -111.3515 pC RF_Ampl. 148.7161 kV, RF_Phase -35 dg. receipt 10 Apr last, X flux 35e3 pA, Las. Att. 276
14h56 Energy = 50 MeV, Laser Phase 75 dg., Sect. Phase 215 dg., Sect. Att. 2.53 dB, I_Gun -94.9526 pC, I_Linac -122.0817 pC, I_TL -108.2541 pC RF_Ampl. 148.7161 kV, RF_Phase -35 dg. sometimes it was 50e3 pA, Las. Att. 276
19h08 Energy = 50 MeV, Laser Phase 75 dg., Sect. Phase 212 dg., Sect. Att. 2.551 dB, I_Gun -350.6393 pC, I_Linac -372.038 pC, I_TL -364.2529 pC RF_Ampl. 148.7161 kV, RF_Phase -35 dg. Las. Att. 375
19h10 Energy = 50 MeV, Laser Phase 75 dg., Sect. Phase 212 dg., Sect. Att. 2.551 dB, I_Gun -368.8974 pC, I_Linac -390.9133 pC, I_TL -382.9227 pC RF_Ampl. 148.7161 kV, RF_Phase -35 dg. Las. Att. 415
20h44 Energy = 50 MeV, Laser Phase 74 dg., Sect. Phase 215 dg., Sect. Att. 2.605 dB, I_Gun -87.9133 pC, I_Linac -113.5951 pC, I_TL -101.2012 pC RF_Ampl. 148.7161 kV, RF_Phase -36 dg. Las. Att. 280
20h52 Thomx was stopped |
| Attachment 1: Screenshot_from_2026-04-16_20-53-14.png
|  |
| Attachment 2: Screenshot_from_2026-04-16_20-53-34.png
|  |
|
1231
|
Wed Apr 15 08:04:29 2026 |
KD MJ RC DN VK | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
ENERGY/ANGLE 40 MeV - 15 avril 2026 | | 8h05: mise en chauffe à distance (frigo/chillers, modulateur, laser, cyclage)
*** Programme : Mesure spectre angulaire @40MeV
Matin : probleme de stockage faisceau 40 MeV
Demarrage prise de donnees : ~ 15h - Flux ~ 1500 (I3+I4)
16h50 Energy = 40.2 MeV, Laser Phase 47 dg., Sect. Phase 218 dg., Sect. Att. 4.091 dB, I_Gun -125.8969 pC, I_Linac -158.2249 pC, I_TL -140.5174 pC RF_Ampl. 148.7161 kV, RF_Phase -41 dg.
|
|
Draft
|
Tue Apr 14 08:03:01 2026 |
IC,VM | | Shift summary | Linac Commissionning | Ring Commissioning |
|
Beam studies. preparation for 40 MeV | | 8h00 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
10h Problem with modulator; It went to OFF and it does not start. Need help;
12h40 Fixed by Maher
12h42 HV is ON.
recipe_recipe_LI_TL_RI_all_20260410_18_30_00.txt loaded. Beam is in the ring with RF, all is OK
13h02 Energy = 50 MeV, Laser Phase 62 dg., Sect. Phase 222 dg., Sect. Att. 2.353 dB, I_Gun -84.0745 pC, I_Linac -110.6456 pC, I_TL -97.627 pC RF_Ampl. 148.7161 kV, RF_Phase -42.5 dg.
==>40 MeV
recipe_recipe_LI_TL_RI_all_20260414_16_25_18.txt saved
16h36 Energy = 40.2 MeV, Laser Phase 66 dg., Sect. Phase 222 dg., Sect. Att. 3.974 dB, I_Gun -109.5905 pC, I_Linac -137.9429 pC, I_TL -118.206 pC RF_Ampl. 148.7161 kV, RF_Phase -42.5 dg.
recipe_recipe_LI_TL_RI_all_20260414_16_37_59.txt saved. Flat orbits (both), good storage, small vert. size at EL/SST01
17h07 Energy = 40.2 MeV, Laser Phase 58 dg., Sect. Phase 214 dg., Sect. Att. 4.001 dB, I_Gun -119.9999 pC, I_Linac -147.2619 pC, I_TL -131.3768 pC RF_Ampl. 148.7161 kV, RF_Phase -42.5 dg. X =+2.5 mm
|
|
Draft
|
Fri Apr 10 07:39:37 2026 |
IC,VM | Under Process | Shift summary | |
|
| | 7h40 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
08h43 HV is ON
recipe_recipe_LI_TL_RI_all_20260409_17_07_05.txt loaded
09h00 Energy = 50 MeV, Laser Phase 63 dg., Sect. Phase 217 dg., Sect. Att. 2.49 dB, I_Gun -86.2367 pC, I_Linac -110.0622 pC, I_TL -100.1516 pC RF_Ampl. 48.9051 kV, RF_Phase -35 dg.
09h25 standby, adding SF6 pressure
09h33 HV
10h43 Energy = 50 MeV, Laser Phase 116 dg., Sect. Phase 233 dg., Sect. Att. 2.45 dB, I_Gun -90.9374 pC, I_Linac -114.4855 pC, I_TL -104.2454 pC RF_Ampl. 148.7161 kV, RF_Phase -32 dg.
17h01 Energy = 50 MeV, Laser Phase 97 dg., Sect. Phase 240 dg., Sect. Att. 2.406 dB, I_Gun -100.3151 pC, I_Linac -127.6278 pC, I_TL -114.2449 pC RF_Ampl. 148.7161 kV, RF_Phase -41 dg.
|
|
Draft
|
Thu Apr 9 08:11:33 2026 |
IC,VM | Under Process | Shift summary | |
|
| | 8h10 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
09h12 HV is ON
recipe_recipe_TL_all_20260408_17_18_54.txt loaded
10h25 Energy = 50 MeV, Laser Phase 76 dg., Sect. Phase 224 dg., Sect. Att. 2.52 dB, I_Gun -95.9713 pC, I_Linac -118.9236 pC, I_TL -16.394 pC RF_Ampl. 148.7161 kV, RF_Phase -35 dg.
datetime(datestr(TimeNum(1),'yyyy-mm-dd_HH:MM:SS.FFF'),'InputFormat','yyyy-mm-dd_HH:MM:ss.SSS','Format','yyyy-mm-dd_HH:MM:ss.SSS') |
|
Draft
|
Wed Apr 8 07:29:51 2026 |
7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage) | | | |
|
, entered from 127.0.0.1 | | 7h30 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
8h30 HV is ON
recipe_recipe_LI_TL_RI_all_20260402_14_37_41.txt loaded
10h16 Energy = 50 MeV, Laser Phase 72 dg., Sect. Phase 220 dg., Sect. Att. 2.51 dB, I_Gun -116.9607 pC, I_Linac -140.3135 pC, I_TL -131.2199 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
10h18 Energy = 50 MeV, Laser Phase 72 dg., Sect. Phase 220 dg., Sect. Att. 2.51 dB, I_Gun -98.3498 pC, I_Linac -120.5804 pC, I_TL -111.3074 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
11h19 Energy = 50 MeV, Laser Phase 75 dg., Sect. Phase 219 dg., Sect. Att. 2.62 dB, I_Gun -92.4726 pC, I_Linac -115.7833 pC, I_TL -106.6548 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
13h55 Energy = 50 MeV, Laser Phase 79 dg., Sect. Phase 224 dg., Sect. Att. 2.58 dB, I_Gun -94.4872 pC, I_Linac -117.7063 pC, I_TL -107.6493 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
|
|
1226
|
Tue Apr 7 07:49:37 2026 |
IC,VM, KD, DN, MJ | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
MONO 61.5 MeV - 07 avril 2026 | | 7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
09h30 HV is ON
10h23 Energy = 61.5 MeV, Laser Phase 39 dg., Sect. Phase 225 dg., Sect. Att. 0.952 dB, I_Gun -78.1953 pC, I_Linac -122.7687 pC, I_TL -102.6104 pC RF_Ampl. 148.7161 kV, RF_Phase -45.5 dg.
*** Mesure Monochromateur 61.5MeV ***
* angle initiale mono : Ry_mono(0) = -0.1° (ajouté aux valeurs d'angles pour la position moteur)
* Position fentes initiale [-19;-16]
Point On Axis :
- Angle Mono 1.5° --> position RSample : 3.5°
- Angle Mono 1.6° --> position RSample : 3.7°
- Angle Mono 1.7° --> position RSample : 3.9°
- Angle Mono 1.8° --> position RSample : 4.1°
H +30mm (position hexapod TX = -12):
- Angle Mono 1.8° --> position RSample : 3.7°
- Angle Mono 2° --> position RSample : 4.1°
H +40mm (position hexapod TX = -23):
- Angle Mono 1.8° --> position RSample : 3.6°
- Angle Mono 2° --> position RSample : 4°
H -30mm (position hexapod TX = 53):
- Angle Mono 1.5° --> position RSample : 3.9°
- Angle Mono 1.6° --> position RSample : 4.1°
- Angle Mono 1.8° --> position RSample : 4.5°
H -40mm (position hexapod TX = 64):
- Angle Mono 1.5° --> position RSample : 4°
- Angle Mono 1.6° --> position RSample : 4.2°
- Angle Mono 1.8° --> position RSample : 4.6°
V +30mm (position hexapod TX = 21, TY : 30):
- Angle Mono 1.5° --> position RSample : 3.5°
- Angle Mono 1.6° --> position RSample : 3.7°
- Angle Mono 1.8 --> position RSample : 4.1°
V -30mm (position hexapod TX = 21, TY : -30):
- Angle Mono 1.5° --> position RSample : 3.5°
- Angle Mono 1.6° --> position RSample : 3.7°
- Angle Mono 1.8 --> position RSample : 4.1°
*** Images pilatus (thershold 30keV) ==> position On Axis, avec Rsample = 2°
1.8° :
452 (expo 2s), 453 (expo 5s), 454 (expo 10s), 455 (expo 20s)
1.5° :
456 (expo 20s), 457 (expo 20s), 458 (expo 10s)
2° :
459 (expo 20s), 460 (expo 20s), 461 (expo 30s), 465 (expo 20s)
*** Re-reglage streak camera (car completement dereglee)
longueur paquet : 40 ps fwhm (idem injection et apres injection) |
|
Draft
|
Fri Apr 3 07:51:41 2026 |
IC,VM, ND | Under Process | Shift summary | |
|
, entered from 127.0.0.1 | | 7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
9h30 HV is ON
recipe_recipe_LI_TL_RI_all_20260402_14_37_41.txt loaded
Adjustments for bunch length measurements at the linac exit.
11h40 Laser Phase 75 dg., Sect. Phase 225 dg., Sect. Att. 2.46 dB, I_Gun -105.0196 pC, I_Linac -109.9004 pC, I_TL -11.3 pC RF_Ampl. 0 kV, RF_Phase -35 dg.
14h27 Laser Phase 69 dg., Sect. Phase 225 dg., Sect. Att. 2.559 dB, I_Gun -112.9786 pC, I_Linac -138.8843 pC, I_TL -127.2119 pC RF_Ampl. 98.0026 kV, RF_Phase -35 dg.
from RTM 3004 100ms/div. Channel 4 - ring beam charge: timestamp: 2026-04-03_14:31:33.541 MeanCH4 = 9.711800E-02
StdCH4 = 3.114028E-03
VppCH4 = 1.617000E-02
|
|
Draft
|
Thu Apr 2 07:55:49 2026 |
IC,VM | Under Process | Shift summary | |
|
| | 7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
08h58 HV is ON
recipe_recipe_LI_TL_RI_all_20260326_09_09_20.txt loaded
09h20 Laser Phase 83.1 dg., Sect. Phase 212 dg., Sect. Att. 2.397 dB, I_Gun -81.8326 pC, I_Linac -86.4815 pC, I_TL -93.017 pC RF_Ampl. 0 kV, RF_Phase -47.91 dg.
15h29 Laser Phase 97 dg., Sect. Phase 224 dg., Sect. Att. 2.417 dB, I_Gun -100.8297 pC, I_Linac -125.7466 pC, I_TL -113.6521 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
18h23 Laser Phase 97 dg., Sect. Phase 224 dg., Sect. Att. 2.507 dB, I_Gun -103.7883 pC, I_Linac -128.9273 pC, I_TL -117.0162 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
|
|
1223
|
Wed Apr 1 07:45:03 2026 |
KD MJ RC DN VK | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
1e avril 2026 - Scan Energy-Angle 61.5 MeV | | 7h40 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
==> SF6 à remplir avant démarrage. 2.805 bar
09h04 HV is ON
11h34 Laser Phase 91.1 dg., Sect. Phase 244 dg., Sect. Att. 0.937 dB, I_Gun -93.1422 pC, I_Linac -136.692 pC, I_TL -117.2003 pC RF_Ampl. 99.1569 kV, RF_Phase -47.91 dg.
16h09 Laser Phase 93.1 dg., Sect. Phase 244 dg., Sect. Att. 1.027 dB, I_Gun -98.4828 pC, I_Linac -140.6614 pC, I_TL -121.8007 pC RF_Ampl. 99.1569 kV, RF_Phase -47.91 dg.
** Recherche meilleur point d'interaction
Mouvement horiz table FPC + orbite e- differentes
Prise spectres a V +40
==> rien de concluant
On se place a Y_fpc = -1.7 mm - Orbite electron cf screenshot - Faisceau a peu pres centre dans le tube X
** Scan spectre ENERGY-ANGLE 61.5 MeV
Fente2 centrees [Hpos Vpos] = [-13 , -14]
Fin de shift 19h45 |
| Attachment 1: orbite_61p5_MeV_2026-04-01_19-24-56.png
|  |
|
1222
|
Tue Mar 31 15:42:33 2026 |
KD MJ | Fixed | Shift summary | Laser | Linac Commissionning | Ring Commissioning |
|
shift du 31 mars 2026 : MONO 70 MeV + spectres 61.5 MeV | | /!\ fort impact du moteur Rsample de la ligne X sur la cavité CFP (obligé de le mettre off)
*** Prise mesure Monochromateur ***
* angle initiale mono : Ry_mono(0) = -0.1° (ajouté aux valeurs d'angles pour la position moteur)
* Position fentes initiale [-8;-17]
Point On Axis (problème de référence mono, surement position fentes [-10,-17]), image Pilatus 436 (70keV de threshold) et 439 (30keV de threshold) :
- Angle Mono 1.33° --> position RSample : 2.92°
- Angle Mono 1.6° --> position RSample : 3.45°
- Angle Mono 1.3° --> position RSample : 2.88°
- Angle Mono 1.23° --> position RSample : 2.73°
H +20mm (position hexapod TX = -13.5):
- Angle Mono 1.33° --> position RSample : 2.8°
- Angle Mono 1.6° --> position RSample : 3.3°
H +30mm (position hexapod TX = -24):
- Angle Mono 1.6° --> position RSample : 3.15°
- Angle Mono 1.8° --> position RSample : 3.55°
H -20mm (position hexapod TX = 30):
- Angle Mono 1.23° --> position RSample : 2.95°
- Angle Mono 1.6° --> position RSample : 3.7°
- Angle Mono 1.33° --> position RSample : 3.15°
H -30mm (position hexapod TX = 41):
- Angle Mono 1.33° --> position RSample : 3.25°
- Angle Mono 1.23° --> position RSample : 3.05°
- Angle Mono 1.1° --> position RSample : 2.8°
V +20mm (position hexapod TX = 9, TY : 20):
- Angle Mono 1.33° --> position RSample : 3°
- Angle Mono 1.6° --> position RSample : 3.55°
- Angle Mono 1.23° --> position RSample : 2.8°
V -20mm (position hexapod TX = 9, TY : -20):
- Angle Mono 1.23° --> position RSample : 2.8°
- Angle Mono 1.6° --> position RSample : 3.55°
- Angle Mono 1.33° --> position RSample : 3°
*** Vers 16h : Passage a 61.5 MeV
Centre faiseau a l'oeil : Fente2 [H , V] = [33 , -18]
Check Dromadaires spectres a V +40 ==> Cf screenshot Dromadaires_61p5_MeV
Vert : Yfpc = - 1.9 mm
Violet - 1.6 (c'etait la meilleure position pour 50 MeV)
Bleu - 1.4
Rouge - 0.8
Noir - 0.6
On se place a Yfpc = -0.8 car a peu pres correct ... (tres differente du cas 50 MeV)
Re-ouverture des Fente2 pour retrouver le centre faisceau
==> Avec Yfpc = -0.8, Plus possible de voir le centre du faisceau dans la config actuelle du Dectris. Cf sceenshot Dectris_centre_faisceau
A suivre demain ...
|
| Attachment 1: Droma_61p5_MeV_2026-03-31_17-41-07.png
|  |
| Attachment 2: Dectris_centre_faisceau_2026-03-31_17-19-05.png
|  |
|
Draft
|
Tue Mar 31 07:56:57 2026 |
KD | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 31 mars 2026 | | 7h55 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
==> vérifier la pression SF6 avant de commencer. 2461mB
HV On
10h05 Laser Phase 29.2269 dg., Sect. Phase 256 dg., Sect. Att. 0.15 dB, I_Gun -107.4324 pC, I_Linac -149.9747 pC, I_TL -133.2527 pC RF_Ampl. 99.1569 kV, RF_Phase -60.51 dg.
15h39 ==> 61.5 MeV, F=500.034945 MHz, Sect Att. 1.00 dB, phase 240. dg.
6h03 Laser Phase 27.2 dg., Sect. Phase 240 dg., Sect. Att. 0.981 dB, I_Gun -110.9555 pC, I_Linac -155.372 pC, I_TL -135.7899 pC RF_Ampl. 99.1184 kV, RF_Phase -47.91 dg.
17h54 ThomX was sopped
|
|
1220
|
Fri Mar 27 07:41:15 2026 |
MJ KD IC VM DN RC | Fixed | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
ENERGY-ANGLE 70 MeV - 27 mars 2026 | | ** Programme : Energy-Angle 70 MeV
7h40 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
08h57 HV is ON
==> 70 MeV. F=500.031645 MHz
recipe_recipe_LI_TL_RI_all_20260320_12_35_26.txt loaded with linac steerers adjusted
11h42 Laser Phase 53.3291 dg., Sect. Phase 256 dg., Sect. Att. 0.177 dB, I_Gun -91.5849 pC, I_Linac -135.8848 pC, I_TL -118.0054 pC RF_Ampl. 99.1184 kV, RF_Phase -59 dg.
Orbite IP differente de 70 MeV semaine derniere
12h30 Iryna vient en sdc pour retablir l'orbite IP de reference
15h44 Laser Phase 41.3291 dg., Sect. Phase 256 dg., Sect. Att. 0.122 dB, I_Gun -90.9101 pC, I_Linac -134.7212 pC, I_TL -115.0435 pC RF_Ampl. 99.1184 kV, RF_Phase -60.5 dg.
17h23 Laser Phase 42.3 dg., Sect. Phase 256 dg., Sect. Att. 0.176 dB, I_Gun -89.6772 pC, I_Linac -133.3612 pC, I_TL -113.6226 pC RF_Ampl. 99.1184 kV, RF_Phase -60.5 dg.
** On-axis a l'oeil
** Check dromadaires
Pas tres bon ==> Deplacement Horiz table FPC de -1.6 a -1.9 ==> On ne trouve rien de tres bon ... On se place a -1.9 mm (cf screenshot droma_70MeV)
** Prise de spectres autour de -20/20 en H et V
** Long paquet : ~ 83 ps FWHM ==> 35 ps RMS
** Mesure taille de source X :
LSF [V , H] = [137 , 51] (image 1000ms0004) ==> e- [H , V] = [190 , 74]
LSF [V , H] = [142 , 50] (image 1000ms0005) e- [H , V] = [204 , 71]
LSF [V , H] = [136 , 53] (image 700ms0003) e- [H , V] = [187 , 81]
LSF [V , H] = [141 , 52] (image 700ms0002) e- [H , V] = [201 , 78]
LSF [V , H] = [137 ,56 ] (image 400ms0007) e- [H , V] = [190 , 93]
LSF [V , H] = [137 , 56] (image 400ms0006) e- [H , V] = [190 , 93]
** ENERGY-ANGLE prise de donnees (scan de spectres +40/-30 Horiz - +40/-40 Vert)
22h30: Stop ThomX, spectrum for 70MeV acquired |
| Attachment 1: droma_70_MeV.png
|  |
|
Draft
|
Thu Mar 26 07:39:02 2026 |
IC, VM, DN, MJ | Under Process | Shift summary | |
|
| | 7h37 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
08h57 HV is ON
==> 70 MeV, F=500.031645 MHz
11h20 Beam is in the ring. recipe_recipe_LI_TL_RI_all_20260320_12_35_26.txt loaded with linac steerers adjusted
11h21 Laser Phase 54.3291 dg., Sect. Phase 256 dg., Sect. Att. 0.197 dB, I_Gun -96.9629 pC, I_Linac -144.3734 pC, I_TL -126.6061 pC RF_Ampl. 99.1184 kV, RF_Phase -59 dg.
|
| Attachment 1: MRSV_Size_vs_LaserPhase.png
|  |
| Attachment 2: HorOrbit_vs_LaserPhase.png
|  |
| Attachment 3: MRSV17h38.png
|  |
| Attachment 4: DispersionAfterLOCO20260326_16h54.png
|  |
| Attachment 5: 20260326_18h24_TL_Dispersion.png
|  |
|
Draft
|
Wed Mar 25 07:28:22 2026 |
Entered by Super Team from 127.0.0.1 on Wed Mar 25 07:28:09 2026 | | Shift summary | Linac Commissionning | Ring Commissioning |
|
Ring studies | | 7h30 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
08h40 HV ON
==> 50 MeV, Manual phase shifter value set to 3209. Sect. temperatute set to 30C at clarinette, (consigne = 29.2C).
Tune studies
LOCO
23h STOP ThomX
|
|
Draft
|
Tue Mar 24 08:10:35 2026 |
KD, VM, MJ, RC | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 24 mars 2026 | | 8h05 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
09h17 HV is ON
11h36 Mod. on standby
13h16: Mod Trig
13h40: Mod Standby impossible de locker la cavite CFP. ==> arret du shift ==> Hayg prend la machine
|
| Attachment 1: HorOrbit_vs_Att.png
|  |
|
Draft
|
Fri Mar 20 07:20:47 2026 |
IC, VM | Under Process | Shift summary | |
|
Work on orbit at 70 MeV for X rays | | 7h20: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
08h55 HV is ON
10h07 70 MeV. Beam is in the ring with RF 100 kV, phase -37.5 dg. The recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt loaded, linac steerers adjusted, Laser phase 56 dg., Sect. Att. 0.191 dB, Sect. phase 255 dg. charges around -100 pC, laser att. 323,
Goal: same orbit as for 50 MeV for X rays.
Work on 70 MeV orbit.
Orbits were obtained near IP. Receipt 70 MeV: recipe_recipe_LI_TL_RI_all_20260320_12_35_26.txt
Work on 61.5 MeV
Receipt 61.5 MeV: recipe_recipe_LI_TL_RI_all_20260320_16_26_35.txt, F=500.034945 MHz
|
| Attachment 1: xorbit70MeV_Xrays_20032026.png
|  |
| Attachment 2: yorbit70MeV_Xrays_20032026.png
|  |
| Attachment 3: Screenshot_from_2026-03-20_15-49-43.png
|  |
| Attachment 4: Y_orbit61.5MeV4Xrays.png
|  |
| Attachment 5: X_orbit61.5MeV4Xrays.png
|  |
|
Draft
|
Thu Mar 19 07:46:50 2026 |
Entered by Super Team from 127.0.0.1 on Thu Mar 19 07:46:39 2026 | | | |
|
, entered from 127.0.0.1 | | 7h45: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
8h46 The photocathode laser image on the camera is very weak, I can't initiate feedback. Help needed.
08h56 HV is on
During another attempt to launch laser position feedback, the diaphragm completely disappeared outside the screen (to the right).
OK it was fixed
09h57 beam is in the ring w/o RF, recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt loaded. Laser phase 5 dg. (to low), sect. att. 0.148 dB, sect. phase 258 dg., Charges around -100 pC,
10h06 RF 100 kV, phase -45 dg.
10h30 interlocks even at sect. att. 0244 dB
11h15 Sect. temp. set to 29.2C (Clarinette, Consigne 28.6 C)
11h57 laser phase jumped to 18 dg.
12h25 For the 70 MeV settings (DP current 255.8 A) the linac energy is too low, so we left 253.8 A ==> 69.7 MeV.
18h10 ThomX was stopped
|
|
1214
|
Wed Mar 18 07:58:19 2026 |
KD, VM, MJ, RC, DN | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 18 mars 2026 | | 8h: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
*** Programme : Mesure spectre et monochromateur à 61.5MeV (70MeV si le temps le permet)
61.5 MeV
09h35 HV is on
photocathod laser phase 62 dg. The receipt 61p5MeV_20250703_12_56_55.txt loaded, going to 61.5 MeV (interlocks)
10h13 Beam is on TL/SST02. Sect. att. 0.992 dB, sect. phase 236 dg.
10h30 Aligned with QP1 - QP3, linac steerers: H [-0.2 -3.02], V [-2.55 3.22]
11h05 Beam is in the ring W/O RF with all ring correctors set to zero
RF 100 kV storage is good, but can't correct the orbit at 61.5 MeV : le faisceau est presque hors du tube ==> Try to go to 70 MeV
70 MeV
13h20 RF processing the section on 25 pps by increasing pulse length from 1 us to 3 us
13h56 70 MeV, Linac steerers H [0.21 -3.75], V [-2.84 3.33], sect. att 0.18, phase 255 dg. laser phase 56 dg. (On the base of 70_MeV_Vert_tune 0.66_good_20251212_13_56_38.txt)
16h17 recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt saved, screenshots, RF 100 kV, phase -36 dg., Freq. 500.031645 MHz
L'orbite n'est pas la meme que pour 50 MeV ==> Checks spectres dromadaires a V+40
X_fpc = -1.5 / -1.3 / -1.7 / -1.9 / -1.1 mais on a oublie d'ajuster la phase a chaque fois .... meme phase (3.0 V)
X_fpc = -0.9 / -0.7 / -0.4 / -0.2 / -0.5 en ajustant la phase a chaque fois
Cf les 2 screenshots "Spectre 70 MeV"
On se place a X_fpc = -1 mm (pas top mais dans l'urgence on se met la)
Fente2 centrees a l'oeil : [H , V] = [11 , -23]
Prise de spectres a +/- 10 en H et V (a voir ce que ca donne offline)
17h56 ThomX was stopped |
| Attachment 1: Screenshot_from_2026-03-18_17-43-17.png
|  |
| Attachment 2: Screenshot_from_2026-03-18_17-32-49.png
|  |
| Attachment 3: Screenshot_from_2026-03-18_17-32-38.png
|  |
| Attachment 4: Screenshot_from_2026-03-18_16-11-25.png
|  |
| Attachment 5: Orbite_2026-03-18_16-10-25.png
|  |
| Attachment 6: Screenshot_from_2026-03-18_17-45-25.png
|  |
| Attachment 7: spectres_70_MeV.png
|  |
| Attachment 8: spectres_70_MeV_2.png
|  |
|