Entry   SC VC; shift linac 
demarrage modulateur 9H
erreur vanne acquitée
10H intervention Viktor sur le laser PC
Entry   KDn Dupraz from 109.222.35.58 on Thu Oct 31 08:19:12 2024; shift du 31 octobre 2024 Screenshot_from_2024-10-31_13-37-11.pngScreenshot_from_2024-10-31_12-07-13.pngclosed_orbit_31102024.png
8h15: mise en chauffe en remote (modulateur, laser, chiller, Cycling)

Tuning of the linac and injection to the ring

Goal: Search for the non-dispersive orbit and proper RF frequency
Entry   VM, IC, VK;  6x
9h25 Start ThomX

11h20 HV on, linac RF OK, but there is no laser on the cathode. Trying to fix.

The problem was with the M4 position. initial positions now are: M4 mot.01 2855.00,  M4 mot.02 4631.00,
Entry   HG, SC; Etude faisceau linac Soleno_Align_noCol1.png
9h30 : Mise en chauffe

10h31 : mise en route faisceau

On se place à 0 dB,
Entry   KD, HG; shift du 28 octobre 2024 scan_TL_STR1_VS_TL_YAG2.pngScreenshot_2024-10-28_19-40-50_BPM_ring.png
17h: faisceau machine.

** On fait un scan de TL/STR1 avec QP1 à QP4 à 0, faisceau aligné (QP1-QP3) coil afin d'avoir un faisceau sur l'écran
TL/SST2 "focalisé". 
Entry   KD; performance estimation alignement QP 7x
On aligne dans QP1 et QP3 et on regarde pour une variation de +- 1A la derive sur TL/BPM.01

valeur nominal QP1-QP3 (0.1A, 3.4A, -3.4A)

autour de QP1-QP3 à 0 pour l'alignement :
Entry   ND, Manon Philit, Janine Issa; Shift summary 25/10 2024-10-25_12_25_26_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngscan_2024_10_25_16_36.pngscan_2024_10_25_16_41.pngscan_2024_10_25_16_51.png
9 : 34 Mise en chauffe

Health check OK (a part les Redpitaya)

10:25 démarrage faisceau
Entry   KD, VM; shift du 24 octobre 2024 TbTSumW_O_RFScreenshot_from_2024-10-24_13-18-57.pngOsc_W_O_RFScreenshot_from_2024-10-24_13-21-59.pngOrbit_WO_RF_TLBPM2plus4mmScreenshotFrom2024-10-24_13-25-15.pngDispersionTLBPM2.pngUnstableTLBPM4Screenshot_from_2024-10-24_14-09-07.png
7h15: mise en chauffe machine (modulateur, laser, refroidissement, cyclage), en remote

Gun Att. = 0.0 dB, Phase=47 dg., Sect. Att. = 2.555 dB, Phase = 206 dg.

Gun Charge -130pC
Entry   Entered by Super Team from 134.158.195.141 on Wed Oct 23 17:27:14 2024;  DispersionTLBPM2.png
Gun phase 50 dg., At 0.5 dB; Sect phase 230 dg. At 2.65 dB; Sol. 220 A, Gun charge -131 pC, Linac -112 pC, TL  -120 pC.

Linac steerers: H [2.2 -3.83], V [-1.46 2.1].

It was atempt to measure dispersion xith TL/BPM2 and the section attenuator. See figure. 
Entry   KD; shift du 23 octobre 2024 bary_11h59.png2024-10-23_11_25_24_li_dg_sst_01-ccd_01_RAW.png2024-10-23_11_45_23_li_dg_sst_01-ccd_01_RAW.png
8h15: mise en chauffe de la machine (en remote)

11H HT ON! recette goog_20241009_17_38_49

Phase E max : 61° Q 85pC
Entry   KD, ND,VC; shift du 22 octobre 2024 10x
9h: mise en chauffe (Klystron, refroidissement, laser)

==> problème Vide (vide8)

==> Problème phase shifter Laser PC (on redémarre le boîtier)
Entry   shift team; Production de rayons X Scan_vertical_recherche_rayonsX.pngSynchronized_Xray.pngtbtsum_trend_all.pngcharge_18h.png
demarrage machine 8h
11h: modulateur passe sur "OFF" sans raison apparente.
12h: faisceau en route 
Entry   VC MJ HG JN; Shift summary 7x
Pas de charge (20 pC Q max)  car shutter PSS orange

Apres plus de 30 minutes : shutter vert enfin ...

charge canon 105 pC
Entry   ND, VC, HG, SC, MEK, VK, VM; Shift summary 8/10/2024 Screenshot_from_2024-10-08_12-47-47.pngScreenshot_from_2024-10-08_13-12-49.pngScreenshot_from_2024-10-08_13-25-19.png
9:10 Maher a redemarre l'ordinateur du modulateur

9:15 Cyclage des aimants

Le cyclage de RI-C1/PS/QP.05 a echoue a 10A.
Entry   Entered by Super Team from 134.158.195.141 on Mon Oct 7 09:30:50 2024;  
pression SF6: 2.3 bar

(nb: redémarrage pc modulateur demain mardi 8/10 à 9h00)
Entry   VC, VM, VK, IC; Shift summary Screenshot_from_2024-10-07_12-44-39.pngScreenshot_from_2024-10-07_12-45-12.png
8h55 démarrage chauffage Klystron

pression SF6: 2.3 bar  => à besoin d'etre complété

(nb: redémarrage pc modulateur demain mardi 8/10 à 9h00)
Entry   MJ; Charge vs soleno : OK ce matin charge_vs_soleno_screenshot.png
Ce matin la charge est parfaitement transmise de soleno 210 a 250, et decroit tranquillment ensuite. Je n'ai pas reussi a faire
fonctionner le script donc j'ai pris un screenshot

12h07 sol=300
Entry   vc, VM,VK, IC; Shift summary Screenshot_from_2024-10-04_14-53-14.png
démarrage chauffage 8h30
9h45 demarrage faisceau

12h Ring studies
Entry   VC MJ HG; Shift summary 
8h30 demarrage chauffage
pB de vanne vide (qui est fermée et en mode local...)

shutter laser sécu PSS en défaut (orange) impossible de le passer vert...
Entry   VC HG; Shift summary 
demarrage chauffage 8h10

visite étudiant M2 => visite fini

vanne vide anneau