Entry   SC, HG, VM; Passage à 61.5MeV et 70 MeV screenshot_steerers_linac_findejournée.pngBeam_transmission_Sole.png
9h14 Mise en chauffe

Pas de camera laser qui s'ouvre sur PlateformeIHM

9h19 cyclage aimants LI, TL sur interface
Entry   VC, Carlos Buitrago, Sudhanshu Thakur, ND; TP 29-11--2024 
demarrage chauffage 8H20

test nouveau code synchro 50Hz => ne fonctionne pas

Le nouveau code 25Hz ne fonctionne pas  => code installé 25Hz (juin 2024)
Entry   VM, IC, VK ;  
08h18 Start ThomX

10h00 HV is 'ON'

10h35 RF Gun phase is 174 dg. Section Phase is  209 dg. Sect. Att. is 2.70 dB TL/BPM2 X=0, Charge is -127 pC
Entry   VC; Shift summary 27/11 QP1_scan.pngQP2_scan.pngQP3_scan.png
8h : mise en chauffe (laser, modulateur, frigo, chiller, cyclage)

9H30 y'a eu une intervention non signalée dans les fosses toutes les rondes sont tombées! (Maher referme)
recette # operation_feedback_et_LE 20241126_17_43_31(faisceau non centré sur TL/QP.01)
Entry   MJ RC KD; shift du 26 novembre 2024 2024-11-26_12_22_06_el_dg_sst_01-ccd_01_RAW_1.png
8h : mise en chauffe en remote (laser, modulateur, frigo, chiller, cyclage)



10h48 : mise en route du feedback sur l'injection dans la section (1essai = erreur de signe sur le signal d'erreur), 2e essai (1min plus
Entry   KD, RC; shift du 22 novembre 2024 TL_BPM4_locked.dat
9h30 : mise en chauffe

intervention casemate pour alignement laser et nettoyage optique.

11h : démarrage, charge énergie max 100pC pour atténuateur à 330pas, phase 187°
Entry   KD; laser PC  2024-11-22_11_07_23_li_op_las_02_RAW.png2024-11-22_11_07_57_li_op_las_02_RAW.png
Mesure de ce matin et réalignement:

sortie laser : 298uJ

sortie ligne de transport : 209uJ
Entry   VM Entered by Super Team from 134.158.195.141 on Thu Nov 21 08:26:43 2024;  
08H25 Start ThomX

09H45 HV is 'ON'

09h49 Breakdown in the RF Gun
icon3.gif   MJ VC KD RC DN; Shift summary 19/11/2024 YAG_TL3_beam.pnginjection_ring.pngFluo_det.png
8h20 demarrage machine

iris 1.3mm
att 440
Entry   Entered by Nicolas Delerue from 134.158.195.144 on Fri Nov 15 12:13:26 2024; Charge excess in the TL Screenshot_from_2024-11-15_12-12-55.pngScreenshot_from_2024-11-15_12-12-46.png
By looking at the BPM transmission tool one can see that there is more charge on TL/BP.03 than on TL/BPM.02 (see attached image).

The BPM seetings have been checked and they are similar.

One can see a similar effect when comparing TL/ICT.01 and TL/ICT.02.
Entry   IC, VK, VM, ND; Ring studies, MRSV 36x
07h50 Start ThomX

09h20 HV is 'ON'

09h25 HV  1215 V
Entry   Entered by Viktor Soskov from 134.158.195.153 on Thu Nov 14 09:21:36 2024; Etat laser 
Bonjour, rien n'a change au faisceau laser (distribution reste le meme,l'energie sur la cathode =60mkJ, Iris = 1.3mm, Att =420).

J'ai termine les mesures. On peut demarrer.

Viktor.
Entry   Entered by Super Team from 134.158.195.141 on Thu Nov 14 08:33:03 2024;  15x
08h30 Start ThomX

10h00 HV is 'ON'

11h03 RF Gun phase 230 dg. Att. 0.0 dB, Laser Att. 360.00, Charge -145 pC, Section Att. 2.59 dB, Phase 207 dg.
Entry   VC; Shift summary 13/11/24 Q_transport_vs_Soleno.pngQ_transport_vs_Soleno_Align_917_1.pngQ_transport_vs_Soleno_Align_917_2.pngICT_Att_320_to_400.pngSPSum_LI_Att_320_to_400.png
demarrage machine 8h30
demarrage puissance RF
Phase charge max 286° Qmax 103pC sDev 13pC
Entry   Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 12 10:36:24 2024; Salle laser ThomX 
Bonjour , l'intervention du Dalkia sur le CTA de la salle laser est terminee.

Viktor.
Entry   MJ KD VC; shift du 12 novembre 2024 
8h10 : mise en chauffe en remote (modulateur, laser, chillers).

redemarrage serveur camera UV
vide canon à sauté
Entry   IC, VK, JN; ring studies 13x
8h50 Start of the modumator and all subsystems

Beam studies.

Orbit Correction.
Entry   IC, VK, VM, JN;  6x
8h50 Start of the modumator and all subsystems

PC client 1 was frozen => we restarted

10h20 HV on 1215 V
Entry   VC MJ; shift  BPMLI_align_photocathode_13h15.pngBPMLI_align_photocathode_13h56.pngLaser_sur_cameraUV_16h19.png
demarrage chauffage 8h
autorisation PSS zone modulateur  interdite => il faut venir valider la zone
PB MPS  appel nourredine
Entry   Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 5 17:29:48 2024; Laser-cathode 
Bonjour, le laser (miroirs du parcours optique) a ete realigne.

L'etat actuel: l'enrgie sur la cathode ~ 80µJ ( Iris 1.3mm, Att 420)

Viktor.