demarrage chauffage 8H20
test nouveau code synchro 50Hz => ne fonctionne pas
Le nouveau code 25Hz ne fonctionne pas => code installé 25Hz (juin 2024)
10:30 Beam ON
Loading recipe: LI_TL_RI_good_20241114_15_27_46
11:30 RF section phase: 191 deg, Att=2.56dB
Start position feedbacks...
Beam seen in the LE (but very weak).
Recipe saved as TL_test_20241129_12_06_24
12:15 Access in Fosse nord for ALTO => 1h30 break.
13:45 Restart beam
Difficulty to tune...
15:12 Extraction at t=92.3
LIB.01 was at -7.48 moved to -4
15:41 Ext kicker very stable
Beam seen in EL/DG/BPM.01
Beam intensity on the BPM is varying with a long period. We can not identify the source of the variation.
Transmission is about 20% but most of the losses probably occur in the EL.
17:00 Beam OFF
|