HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Notes concernant la preparation du Commissionning, Page 1 of 3  Not logged in ThomX    logo
Entry   VM, VK, ND; Summary of the ring commissioning meeting 
Entry   VK,IC, SC, VM, ND; Summary of the ring commissioning meeting 
Entry   VK, VM, SC, ND, HG; Summary of the ring commissioning meeting 
Entry   VK, IC, VM, JH, ND; Summary of the ring commissioning meeting 
Entry   VK, IC, VM, JH, KD, ND; Summary of the ring commissioning meeting 
Entry   VK, IC, VI, JH, SC, ND; Summary of the ring commissioning meeting #5 
Entry   VK, IC, VI, JH, ND; Summary of the ring commissioning meeting #4 
Entry   VK, IC, LS, ND; Summary of the ring commissioning meeting 
Entry   VK, IC, JH, VM, LS, MB, ND; Summary of the ring commissioning meeting 
Entry   VK, IC, AM, ND; Summary of the ring commissioning meeting #2 
Entry   ND, IC; Steerers and BPM map for the ring BPM_ring.pngBPM_ring.pptx
    Reply   ND; RE: Beam requirements for the ring 
    Reply   ND; RE: Summary of the ring commissioning meeting 
Entry   ND; Notes from ThomX Physics meeting 
Entry   ND; Verification variables pour l'anneau ring_vars_2023_02_09_12_15.png
    Reply   ND; RE: Notes from ThomX Physics meeting 
Entry   ND; Réunion Physique ThomX 
Entry   MO HM; test RF modulateur longue durée (journée) Screenshot_from_2022-08-18_15-56-17.png
Entry   MO; démarrage 
Entry   KD; mesures et shifts Linac 
ELOG V3.1.4-395e101