  47   Mon Feb 20 10:06:36 2023 VM, VK, NDNew SolutionInforesumes Summary of the ring commissioning meeting This week: beam on Thursday.

So far we did not see any screenshot
of Ring variables check.
  
  44   Mon Jan 23 09:54:14 2023 VK,IC, SC, VM, NDNew SolutionInforesumes Summary of the ring commissioning meeting No beam last week. No beam this week.

Machine recovery on 2/2 => Nicolas
may try to tune the machine with students.
  
  43   Mon Jan 16 09:38:16 2023 VK, VM, SC, ND, HGNew SolutionInforesumes Summary of the ring commissioning meeting Summary of last week:

- On Thursday the beam energy was
very different from usual (magnets current
  
  38   Mon Nov 7 23:53:29 2022 VK, IC, VM, JH, NDNew SolutionInforesumes Summary of the ring commissioning meeting Discussed recent orbit correction of
the expanded orbit. 

Need
to make run with  cavity detuning from
  
  39   Mon Dec 5 10:05:11 2022 VK, IC, VM, JH, KD, NDNew SolutionInfoanalyse Summary of the ring commissioning meeting The ring orbit has been re-established
despite some difficulties after the shutdown.

The ring cavity has been started.
  
  37   Mon Oct 17 10:02:07 2022 VK, IC, VI, JH, SC, NDReference SolutionInforesumes Summary of the ring commissioning meeting #5 See slides attached to the indico page
https://indico.ijclab.in2p3.fr/event/8885/

Pb with BPM => visual check
  
  35   Mon Oct 10 10:04:49 2022 VK, IC, VI, JH, NDUnder ProcessShift summaryresumes Summary of the ring commissioning meeting #4 - 300 turns achieved.

- Probably more but limited by
libera cut-off frequency.
  
  59   Mon Jun 26 09:57:52 2023 VK, IC, LS, NDNew SolutionShift summaryresumes Summary of the ring commissioning meeting Discussion mécanique

- Tous les dipoles ont été
alignés par rapport à des surfaces
  
  54   Tue May 30 10:12:30 2023 VK, IC, JH, VM, LS, MB, NDNew SolutionInfoanalyse Summary of the ring commissioning meeting Main studies:

- Measure bucket width in phase
on Thursday at 500.02MHz => no storage
  
  29   Mon Sep 26 09:39:15 2022 VK, IC, AM, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #2 Slides are at https://indico.ijclab.in2p3.fr/event/8750/

- There is a difference in BPM
numbering in Tango and MML => we should
  
  32   Wed Sep 28 09:56:44 2022 ND, ICReference SolutionInfodocs Steerers and BPM map for the ring See attached files.  BPM_ring.pngBPM_ring.pptx 
  31   Tue Sep 27 17:45:54 2022 NDUnder ProcessInfodocs RE: Beam requirements for the ring An IHM to check some of these parameters
has been created (git/panneaux/StatusInfoIHM_ring_vars.py)
and added to Plateforme_IHM...
  
  41   Tue Dec 6 00:15:55 2022 NDNew SolutionInfoanalyse RE: Summary of the ring commissioning meeting Regarding the remote control of the RF
synthetizer: it can only be controlled via
GPIB and RS-232.
  
  45   Tue Jan 24 10:14:20 2023 NDNew SolutionInfoPrise de donnees Notes from ThomX Physics meeting Present: IC, VK, VM, VC, SC, MEK, KD, MJ,
HG, ND, MO (sous réserve d'oublis)

Visio: CB
  
  46   Thu Feb 9 12:16:41 2023 NDNew SolutionInfoPrise de donnees Verification variables pour l'anneau L'IHM de verification des variables
pour l'anneau a ete mis a jour.

Il est accessible dans plateforme
 ring_vars_2023_02_09_12_15.png 
  48   Fri Feb 24 10:34:58 2023 NDNew SolutionInfoPrise de donnees RE: Notes from ThomX Physics meeting Présent: VK, SC, KD, MJ, HG, ND

Présentation par Marie.
Cf indico https://indico.ijclab.in2p3.fr/event/9242/
  
  51   Thu Mar 23 12:29:05 2023 NDNew SolutionInforesumes Réunion Physique ThomX Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/

Quelques notes de la réunion
de Physique de ThomX:
  
  24   Wed Aug 17 11:42:41 2022 MO HMUnder ProcessInfoPrise de donnees test RF modulateur longue durée (journée) but : test fonctionnement modulateur et
RF sur la journée

8h55 démarrage modulateur
 Screenshot_from_2022-08-18_15-56-17.png 
  25   Fri Sep 2 08:51:46 2022 MO Shift summaryetc démarrage 8h35  mise sous tension: PSS, LB9000,
modulateur, chillers
  
  52   Fri Mar 31 10:37:18 2023 KDUnder ProcessOtherPrise de donnees mesures et shifts Linac Réunion 31/03

Prochaines mesures à faire
:
  