|
HOME
Prise de donnees
MML
Controle commande
Simulations
Notes
Hardware
Ligne X
Laser Interaction
Diagnostiques
Synchronisation
|
|
Commissionning
Commissionning Preparation
Pannes
ShiftCheck
|
| Notes concernant la preparation du Commissionning, Page 1 of 3 |
Not logged in |
 |
|
| New entries since: | Thu Jan 1 01:00:00 1970 | |
VK, IC, LS, ND; Summary of the ring commissioning meeting
|
KD; Mise en place Ligne X 
|
KD; RE: Mise en place Ligne X
|
IC, VK, VM, LS, JH, SC, ND; Summary of the ring commissioning meeting
|
IC, VK, VM, LS, JH, MB, ND; Summary of the ring commissioning meeting
|
VK, IC, JH, VM, LS, MB, ND; Summary of the ring commissioning meeting
|
IC, VK, LS, JH, ND; Summary of the ring commissioning meeting
|
KD; mesures et shifts Linac
|
ND; Réunion Physique ThomX
|
IC, VK, VM, JH, ND; Summary of the ring commissioning meeting
|
IC, VM, SC, JH, VC, ND; Summary of the ring commissioning meeting    
|
ND; Notes from ThomX Physics meeting
|
ND; RE: Notes from ThomX Physics meeting
|
VM, VK, ND; Summary of the ring commissioning meeting
|
ND; Verification variables pour l'anneau
|
VK,IC, SC, VM, ND; Summary of the ring commissioning meeting
|
VK, VM, SC, ND, HG; Summary of the ring commissioning meeting
|
IC, VK, VM, SC, ND; Summary of the ring commissioning meeting
|
VK, IC, VM, JH, KD, ND; Summary of the ring commissioning meeting
|
ND; RE: Summary of the ring commissioning meeting
|
CB/HG/SC/KD; Programme linac semaine 5 décembre
|
VK, IC, VM, JH, ND; Summary of the ring commissioning meeting
|
VK, IC, VI, JH, SC, ND; Summary of the ring commissioning meeting #5
|
|