Entry   IC, VK, VI (ND); Summary of the ring commissioning meeting #3 

Shift summaries for the ring for last week are at

https://elog.lal.in2p3.fr/THOMX/Commissionning/568

https://elog.lal.in2p3.fr/THOMX/Commissionning/570

https://elog.lal.in2p3.fr/THOMX/Commissionning/571

The
problem with the pulse jumpis with 12ns delays has been identified and fixed (it was related to the synchronisation system).

The main issue identified
Entry   VK, IC, VI, JH, ND; Summary of the ring commissioning meeting #4 
- 300 turns achieved.

- Probably more but limited by libera cut-off frequency.

- Need to measure the injection axis
Entry   VK, IC, VI, JH, SC, ND; Summary of the ring commissioning meeting #5 
See slides attached to the indico page https://indico.ijclab.in2p3.fr/event/8885/

Pb with BPM => visual check of electrodes + hardware swap

Pb with steerer => Need to identify who will do the intervention and when
Entry   VK, IC, VM, JH, ND; Summary of the ring commissioning meeting 
Discussed recent orbit correction of the expanded orbit. 

Need to make run with  cavity detuning from its resonant conditions
used in the conditioning. 

 

Discussed measurement of tune, and possible origins of inconsistant/noisy measurements.
 Either BPMs signal processing or  weak excitation. Beam size?

Need to do measurements with scope, to see if we can interpret TbT
Entry   CB/HG/SC/KD; Programme linac semaine 5 décembre 
Lundi 5 décembre : redémarrage technique

Pb refroidissement  Pb réglé le mercredi matin concomitance (anneau/linac), sensible à la pression qui est dans
le réseau primaire, à surveiller
Entry   IC, VK, VM, SC, ND; Summary of the ring commissioning meeting 20_injections.jpg
Notes from last week:


Beam was very unstable (probably energy instabilities), lot of time was spent tuning the injector.
Beam instabilities prevented
us from having a good storage.
Unable to start the extraction line dipole.


Comments:
Entry   VK, VM, SC, ND, HG; Summary of the ring commissioning meeting 
Summary of last week:

- On Thursday the beam energy was very different from usual (magnets current higher 172A for TL; 176A for RI) => made it impossible to re-use
previous settings for the ring and to find new settings.
Entry   VK,IC, SC, VM, ND; Summary of the ring commissioning meeting 
No beam last week. No beam this week.

Machine recovery on 2/2 => Nicolas may try to tune the machine with students.

Data taking on 9/2 for diags and machine characterization.
Entry   VM, VK, ND; Summary of the ring commissioning meeting 
This week: beam on Thursday.

So far we did not see any screenshot of Ring variables check.

Looking at last week's data, shot to shot charge instability seems to be > 15%
Entry   IC, VK, VM, JH, ND; Summary of the ring commissioning meeting 
- Went up to 100kV in the cavity once it was tuned.

- Achieved nice storage stable for 2500 turns and some beam for > 100ms

- Measured the tune: several peaks around 0.35[1] (near the expected value) and one peak not understood at 0.5
Entry   ND; Réunion Physique ThomX 
Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/

Quelques notes de la réunion de Physique de ThomX:

- Présentation de Marie sur les mesures dans le linac
Entry   IC, VK, VM, LS, JH, SC, ND; Summary of the ring commissioning meeting 
Report from last week:

- Attempted the strategy suggested by Alex

- Comparison of orbit with RF ON and RF OFF helped understand the "natural" frequency of the ring: 500.33MHz
Entry   VK, IC, LS, ND; Summary of the ring commissioning meeting 
Discussion mécanique

- Tous les dipoles ont été alignés par rapport à des surfaces de référence

- Le décalage du centre magnétique par rapport au centre mécanique a été mesuré par Cynthia et pris
Entry   Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020; Clients 1, 4 et 5 non fonctionnels 
En complément du message de Hayg, client 4 et 5 ne fonctionnent pas non plus (en plus de client 1).

Nicolas
Entry   Hayg; WC tests TANGO 

CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean


 

Dans les variables MeanStd :


Charge 1 :

er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean 


Charge 2 :

er_ca_rac.05-elr.01-wac.02_Ch0_chargeMean   
er_ca_rac.05-elr.01-wac.02_Ch3_chargeMean  
er_ca_rac.05-elr.01-wac.02_Ch4_chargeMean  


Charge
    Reply   Hayg; RE: WC tests TANGO Screenshot_from_2021-03-03_11-29-57.png
 




Hayg
wrote:




CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean


 
Entry   CB/SC; liste des actions à menées 
 
Entry   Entered by Sophie Chance from 134.158.195.143 on Thu Jul 16 09:50:21 2020; demarrage à blanc 
debut du démarrage à blanc 9h45. Démarrage prévu par étape.
Entry   Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020; re-organisation PC-client en SdC 
suite à la discussion de lundi 7 /12/20, les PC clients en SdC ont été déplacés et re-organisé avec les numeros
client1 ,2 , 3 ,4 ,5 dans le sens horaire en salle de controle, en commencant par la gauche en entrant

+----------------------------------------------------------------+
    Reply   Hayg; RE:  
Pour info :


client 1 ne fonctionne pas encore. Il n'a pas été utilisé depuis longtemps, Guillaume a été prévenu
pour y jeter un oeil.
Client 3 et 5 sont maintenant aux places qui n'ont qu'un seul écran. Une MAJ de la salle devra être
ELOG V3.1.4-395e101