Entry   MO; démarrage 
8h35  mise sous tension: PSS, LB9000, modulateur, chillers
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020; demarrage a blanc 3 dec 2020 
Bilan démarrage à blanc 3 dec 2020 : (H Monard, S Cavalier)

but : verification etat IHM pour conditionnement RF avec H Monard + JN Cayla

Sur compte H Monard : sur Client2 plateforme IHM ne se lance pas
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020; signal photodiode laser photodiode-laser2.png
 
Entry   IC, VK, AM, VC, ND; Beam requirements for the ring 
The following parameters are required for ring operations:

- At least 50pC on TL/DG/ICT.01 with std <20pC

- At least 20pC on TL/DG/ICT.02 with std <20pC
    Reply   ND; RE: Beam requirements for the ring 
An IHM to check some of these parameters has been created (git/panneaux/StatusInfoIHM_ring_vars.py) and added to Plateforme_IHM...




Quote:



The following parameters are required for ring operations:
Entry   ND, IC; Steerers and BPM map for the ring BPM_ring.pngBPM_ring.pptx
See attached files.
Entry   VK, IC, VM, JH, KD, ND; Summary of the ring commissioning meeting 
The ring orbit has been re-established despite some difficulties after the shutdown.

The ring cavity has been started. Whatever the phase it kills the beam.
Two hypothesis:
    Reply   ND; RE: Summary of the ring commissioning meeting 
Regarding the remote control of the RF synthetizer: it can only be controlled via GPIB and RS-232.

=> Phase shift will be done from the synchro synthetiser

=> Power control can be done with a variable attenuator controlled by the synchro synthetiser or a delay generator.
Entry   IC, VM, SC, JH, VC, ND; Summary of the ring commissioning meeting data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png
Excitation (betatron oscillation) on the beam observed by exciting it with the extraction kicker => initial measures of the tune.

Tune measured close from expected value.

Reason for oscillation damping is not understood.
Entry   IC, VK, LS, JH, ND; Summary of the ring commissioning meeting 
=== Summary of last week:

- Frequency was reduced to 500.0202MHz but the beam stayed only for 100s of turns

- Good storage was achieved at 500.40MHz:
Entry   VK, IC, JH, VM, LS, MB, ND; Summary of the ring commissioning meeting 
Main studies:

- Measure bucket width in phase on Thursday at 500.02MHz => no storage beyond 45kV

- Measure frequency with spectrum analyser => 500.39MHz
Entry   Entered by Hayg Guler from 134.158.195.145 on Tue Nov 19 11:16:25 2019;  
Salle de controle :


installer Xlib pour tout le monde
mettre les environnements en place


IHM vide :


couleurs ??


Chiller :
Entry   Entered by bruni from 134.158.195.142 on Tue Jul 7 14:24:55 2020; test régulation températures canon/section screenshotIHM_RF.png
Ouverture des chillers et du frigo sur place.

Ouverture de l'IHM plateforme

Mise frigo ON et les chillersV
Entry   Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020; test moteur solénoide en charge 
Prise de mesure relative entre les deux bobines : 18.7cm avec les alimentations éteintes mais du refroidissement.

Mise en route des alimentations 80A sur la contre champ, et 275 sur la focalisante.

Prise de mesure à nouveau : 18.7cm --> ca n'a pas bougé
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020; signal photodiode 03-12-20 plot.pdf
 
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020;  
Signaux RF - REdPitaya 03-12-20

Photodiode laser - RP.04 A

QS RP.04 B
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020;  photodiode-Prc_Qs.pdf
signaux photodiode PrC Qs test avec generateur impulsion ! 2 V , 3 µs (bleu ciel)  et signal avec rampe, 1V (moire), photodiode (rose)
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:35:53 2021; Tests IHM RF  IHM_RF.png
De nouveaux tests ont été fait sur l'IHM RF amélioré (M. Omeich, H. Guler, S. Chance, JN. Cayla)

Tous les redpitayas ont été testés via un générateur de retard.
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:45:48 2021;  RDP.01_voie1.pngRDP.01_voie2.png
Test du repitaya 1 voie 1 (Pi section) et 2 (Pr section)

 
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:56:07 2021; redpitaya 2 RDP.02_voie1.png
Tests du redpitaya 2 voie 1 (Boucle section) voie 2 est libre