    Reply   Beam size and finesse, posted by Loïc Amoudry at Optical room about lasers and optics 
Measurement behind P4 (planar mirror)




Loïc
Amoudry wrote:



FSR initiale : 33.34 MHz (S3 = -825000 et S4 = -825000)
Entry   Beam pulse duration, posted by Ronic Chiche at Optical room about lasers and optics interferences.avipulse_duration.png
We installed the 2 CVBG for compression after the amplifier.
We used an interferometric technique with a delay line and combining the two paths in a CCD to measure interferences... see interferences.avi video
file
    Reply   Beam pulse duration, posted by Ronic Chiche at Optical room about lasers and optics pulse_width.png
Yesterday, Loic installed a telescope before CVBG's to reduce the spot size on CVBG's and reduced the incident angle 0.5-1° on them (on the
datasheet the specified incident angle is 2.8°).

We used an interferometric technique with a delay line and combining the two paths in a CCD to measure interferences.
    Reply   Beam pulse duration, posted by Ronic Chiche at Optical room about lasers and optics interferences_pulse_duration.png
Yesterday, Loïc put the CVBG's back to their specified angles.

We used an interferometric technique with a delay line and combining the two paths in a CCD to measure interferences.

After supressing the global shape of the superposed pulses, one measures the amplitude of the remaining fringes (standard deviation) each 50µm
    Reply   Beam pulse duration, posted by Ronic Chiche at Optical room about lasers and optics Interferences_pulse_width.png
Last Thursday (20th of February), Loïc and Titouan realigned the stretcher CVBG to its nominal angle and they used an interferometric technique
with a delay line and combining the two paths in a CCD to measure interferences.

After supressing the global shape of the superposed pulses, one measures the amplitude of the remaining fringes (standard deviation) each 50µm
Entry   Basic alignment & alignment motors check, posted by Loïc Amoudry at Optical room about mechanics | lasers and optics 
14/02/19: The 4 motors but Mby control works. Mby motor home does not bring it to its "middle" position but to the end of its range.
Issue circumvented using the higher rights software.

The beam is now going through the cavity windows (from P1 to S2).
Entry   Amplifier output power , posted by Loïc Amoudry at Optical room about lasers and optics dichroic.PNGcourbe.PNGpower.xlsx
The ouput power of the ThomX amplifier has been measured as a function of the 3rd stage pumps current (0A is 1st and 2nd stage turned on).

We measured the total power, the total power without the "donuts" pump signal dumped by an iris and the transmission of a dichroic
mirror (for ref see image).
    Reply   Amplifier output power , posted by Loïc Amoudry at Optical room about lasers and optics courbedichro.PNG
 




Loïc
Amoudry wrote:



The ouput power of the ThomX amplifier has been measured as a function
    Reply   Amplifier output power , posted by Loïc Amoudry at Optical room about lasers and optics 
We checked the Dichroic mirror we have : it is a DMSP1000 shortpass dichroic mirror as specified in this post.

The Arrow engraved on the edge of the mirror points on the AR surface !
not on the HR surface...
Entry   Amplifier mission Bordeaux, posted by Loïc Amoudry at Other about mechanics | lasers and optics 1st_and_2nd_stage.jpg3rd_stage_pumps.jpg3rd_stage_signal.jpg
Voyage Bordeaux au CELIA avec Jérôme LHERMITE (Loïc et Titoutan)

1er jour (34°) :

Mesure du spectre et de la puissance des 4 diodes de pompe 3ème étage jusqu’à ~60W (12A).
    Reply   Amplifier mission Bordeaux, posted by Loïc Amoudry at Other about mechanics | lasers and optics Ampli_ThomX.PNGM2_ThomX.png
M² mesuré à 10W.
M²x = 1.17
M²y = 1.14
Entry   Amplifier laser diodes issue, posted by Ronic Chiche at Optical room about lasers and optics Problem_TEC.PNGparam_diode_1.csvparam_diode_2.csv
This is a long time issue for the ThomX amplifier : on the 4 pumping diodes available, the 1st diode has a higher temperature than the others around
40°C (see the picture).
the problem comes from the TEC which is not activated (see diodes parameter files in execel format). the related software windows are shaded.
Entry   Amplifier Beam Profile over time , posted by Manar Amer at ThomX igloo about lasers and optics | detectors and electronics comparision_Between_Beam_profile_over_time.jpg
This morning, with Ronic, we opened the compressor box to observe if there is any misalignment of the mounts or the CVBG's

a comparison slide between the Beam Profile over time and measurements we have taken, is included.

 

we noticed
today that the images need a rotation, and I took the assumption we did not rotate last year and did the rotation of the previous images.

Comparing
    Reply   Amplifier Beam Profile over time , posted by Manar Amer at ThomX igloo about lasers and optics | detectors and electronics 10x
This morning we took data of the beam profile at 4 different points to see the evolution of


the beam shape
divergence


over distance for all amplification percentages

Data plotted for the distance vs radius for all and divergence in rad is extracted and plotted as a variation of amplification power.
    Reply   Amplifier Beam Profile over time , posted by Manar Amer at ThomX igloo about lasers and optics | detectors and electronics 
Information about today's work is added to logBook !!




Manar
Amer wrote:



This morning we took data of the beam profile at 4 different points
Entry   Alphanov amplifier power measurement, posted by Ronic Chiche at ThomX igloo about lasers and optics power_after_compressor_vs_current_for_133MHz_laser.png
This morning, with Manar and Aurélien, we measure the power directly at the output of the Alphanov amplifier with the 2 compressors CVBG
(seeding laser at Frep = 133MHz)
(we had to remove the base plate where the deflector mirrors were mounted to put the large powermeter).
    Reply   Alphanov amplifier power measurement, posted by Ronic Chiche at ThomX igloo about lasers and optics 
answers from Guillaume:

- the chiller temperature has to be set to 25°C
- the power measured with the software can change a little from what Alphanov measured with their laser.
Entry   Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics 
on Monday morning 7/11, we tried to restart the Alphanov amplifier which was not turned on since end of april 2022, but it didn't start.

we did a standard "turn ON" procedure :
- check the safety button on the front panel (which has to be released).
    Reply   Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics 
I just tested the fuse inside the black ON/OFF switch on the rear panel => it is OK ! :-(




Ronic
Chiche wrote:



on Monday morning 7/11, we tried to restart the Alphanov amplifier
    Reply   Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics 
The laser amplifier controller has been sent yesterday and received today by Alphannov.

they should do the assessment quickly...




Ronic