work with HV voltage on the Laselock, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics
|
presently, the voltage on the laser PZT is 0-10V, but during the several runs we did, this voltage is too low to compensate low frequency fluctuations:
we need to change often the motors position implying a cavity lock loss.
we have to check if running the laser PZT with the HV output of the Laselock is possible without too much additionnal noise. |
work with HV voltage on the Laselock, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics
|
Yesterday, I checked the 2 output HV channels of the LaseLock : they work properly but the noise is bigger than the low voltage outputs
~ 1mV rms on 0-10V outputs
~ 8 mv rms on 0-100V output |
work with HV voltage on the Laselock, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics
|
This afternoon, I connected the HV output of the Laselock (instead of the standard 0-10V output) to the FP-cavity PZT to increase the locking range.
I didn't see any degradation of the FP-cavity/synthesizer lock.
Ronic |
test des vérins ISP 20mm et 6mm, posted by Ronic Chiche at Optical room about mechanics | cabling
|
Après avoir utilisé la chaine : driver ISP - cable ISP DB9 - Feedthrough enceinte DB9-DB9 - cable perlé DB9-SUB-C - Capsule SUB-C,
l'ensemble de tous les vérins 6mm et 20mm ont été testés => ils fonctionnent TOUS.
Les vérins 6mm ont TOUS subis un HOME. cette commande cherche une fin de course du vérin et le place ensuite en position médianne. |
test des vérins ISP 20mm et 6mm, posted by Ronic Chiche at Optical room about mechanics | cabling
|
Ronic
Chiche wrote:
Après avoir utilisé la chaine : driver ISP - cable ISP |
test des vérins ISP , posted by Ronic Chiche at Optical room about mechanics | cabling | software
|
* les vérins de 20mm (axe Z) ont été testés sur table grace à une rallonge SUB-C - DB9, au chassis ISP et au soft
SUPERVISEUR écrit en labwindows CVI par Didier.
pour rappel, la course soft va de -1 650 000 à +1 650 000 pour 20mm de course, soit 0.6mm pour 100 000 de course soft. |
test des vérins ISP , posted by Ronic Chiche at Optical room about mechanics | cabling | software
|
Ronic
Chiche wrote:
* les vérins de 20mm (axe Z) ont été testés |
telescope for Koheras, posted by Huan Wang at Optical room about lasers and optics
|
telescope of Koheras is removed, information record here:
- distance between collimator edge and -50 lens mount edge is 14.7cm,
- distance between another edge of -50 lens mount and +250 lens mount edge is 14.3cm, |
strange drift (new effect !?!), posted by Ronic Chiche at ThomX igloo about software
|
today, we had a strange effect :
both the laser and the FP cavity were locked on the RF frequency (500.10045 MHz), and we were producing X-rays but with a slowing (several seconds)
fluctuation exactly as the electrons-photons phase was drifting and the fluctuation can goes to 0 Xrays produced even at the "right" phase. |
some changes in the feedback scheme, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
|
from several weeks, the maximum power stored in the FP-cavity was ~ 5kW.
today with Daniele, we finished to investigate the problem, and now the power inside the FP-cavity is back
to ~50kW for 30% of laser amplifier ratio (~16W). |
restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
|
temperature in the casemate ~ 19.5°C stable
this morning, I measured the power directly at the output of the fiber coupler (through the output fiber), after the strecher : ~5mW
then, I connected the EOM used for the PDH technic : ~2.5mW |
restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software
|
I refilled the chiller and the stabilized temperature is @ 25°C
we started the 3rd stage of the Alphanov amplifier at 30% => PD_OUT is fluctuating around 1-1.4W => it's not related to the real output
power ! |
restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software
|
we had to move the laser cavity motor to find the resonances and change a lot the CEP.
the CEP motor is at -524.1µm
we got ~75kW in the FP cavity without alignment but with CEP optimization. |
restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software
|
after doing some alignment (walking procedure on the Y axis), and CEP optimization, I got 83kW for 33% on the laser amplifier with a coupling of ~60%
=> we have to check the input power after the amplifier.
I adjusted the FP and laser cavity motors to have a small 33MHz detuning with the RF reference (~10 Hz of beating @ 33MHz) |
restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software
|
this morning with Daniele, we are measuring the amplifier power just before the FP-cavity.
Casemate temperature @19.5°C
@0% : 205mW |
restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software
|
After the summer power shutdown, I restarted all the equipements and got quickly ~80kW for 33% amplifier ratio with CEP optimization and without Alignment
optimization.
CEP motor position : -506µm |
restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software
|
amplifier power measurement before the compressor CVBG.
we used a mirror in between the amplifier output and the compressor + a 2-mirror periscope to match the powermeter height.
amp ratio (%) power (W) |
restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software
|
after redoing the alignment of the CVBG, we got back the initial power in the FPC (87kW)
now, I checked the RF locking signals on the 2nd oscilloscope.
I get a strange ratio between the 33MHz beating and the 500MHz beating signals. |
restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software
|
now, the Ring RF frequency is set to 500.067MHz.
so the CFP/laser frequency should be 500.067MHz/15 = 33.3378MHz.
the frequency was set to 33.378MHz !!! => it explains the frequency shift only on the 33MHz beating => I corrected the frequency on the |
restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software
|
I changed a little bit the locking parameters (see picture) for the RF/FPC loop and it locked rapidely.
I asked Vincent to connect on the same scope the synchro signals to check if the FPC lock was OK => he connected 33MHz signals coming from
the laser and from the 33MHz RF generator. |