  Status of commissioning, report also here plots are reports., Page 22 of 24  Not logged in ELOG logo
Entry   Alignment procedure, posted by Ronic Chiche at Optical room about mechanics | lasers and optics 
we did again the complete alignment procedure starting with iris and optimizing injection motors Ma and Mb, then installing mirror S2, S3, P4 and P1,
optimizing thetaX and thetaY axis for each motor.

everything was fine until we installed P1. we tried to optimize thetaX and thetaY of P1 and we clearly observed a strange motion when doing that
    Reply   Alignment procedure, posted by Ronic Chiche at Optical room about mechanics | lasers and optics montage.jpg
Picture of the installed mirrors inside the FP cavity.

To install an Iris instead of a mirror :

One has to remove manually the orange nuts and replace the mirror mount with the Iris mount.
Entry   Alignment correction during the summer break, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
I restarted the FPC system this morning.

after some classic alignement procedure (some LEFT steps on the cavity injection motors X & Y) and CEP tuning,
I got 92kW for 33% amplifier ratio.
Entry   Adding one photodiode in reflection, posted by Ronic Chiche at ThomX igloo about detectors and electronics 
this morning, I added a DET36 photodiode in reflection (I used a thin beam splitter) to better measure the coupling over the full beam size.
this DET36 photodiode is sent to the "laser locking" oscilloscope with the other signals :
CH1 :transmission
Entry   Accelerometer measurement, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics Capture.JPG
with Daniele, we placed the accelerometer on top of the fiber amplifier box which is inside the housing.
the goal was to try to detect a correlation with some possible accoustic noise coming from the bubbles of the water, cooling the amplifier box baseplate.

we monitored a long trend of the transmission which is perturbated when high frequency noise arises, and the accelerometer signal.
Entry   33MHz phase adjustment, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
the 33MHz beating signal (phase) is used to start and stop automatically the lock on the 500MHz beating signal.

this 33MHz beating phase has a fixed range (typically +/-0.5V), so it is important to center this beating phase in the middle of its own range
when the 500MHz signal is locked
Entry   33MHz oscillator + Alphanov amplifier lock, posted by Ronic Chiche at ThomX igloo about lasers and optics 120705_Displacement_of_cylindrical_piezo_ceramics.xls
the last tries to lock the 33MHz + amplifier to the 30k Finesse FP-cavity were unsuccessful.

during a laser Frep scan using the Laselock, one observes that the main cavity resonance is not able to stay inside the PZT scan range from one
scan to another (500ms-1s period)
    Reply   33MHz oscillator + Alphanov amplifier lock, posted by Ronic Chiche at ThomX igloo about lasers and optics 
finding the right modulation/demodulation PDH phase is very difficult on the main resonance because the we get non stationnary signals with a lot of
oscillations.
changing the phase, in this condition, does not really change the error signal.
    Reply   33MHz oscillator + Alphanov amplifier lock, posted by Ronic Chiche at ThomX igloo about lasers and optics M250_Video_Amplifier.pdfM250_manual.pdf
today with Daniele, we locked easily (but with a noisy lock) on the secundary resonance and we tried to lock on the main resonance (with very low coupling
~10% which mean a CEP ~Pi)
the lock was possible but was very noisy.
    Reply   33MHz oscillator + Alphanov amplifier lock, posted by Ronic Chiche at ThomX igloo about lasers and optics 
After removing the 2 generators from the optical table, the lock is much more stable and now, it is possible to lock on the main resonance with a poor
CEP but with quite good stability.
the coupling is still very low ~ 5% for that CEP but if one improves it (CEP ->0), using the laser double-wedge motor, one clearly sees an improvement
    Reply   33MHz oscillator + Alphanov amplifier lock, posted by Ronic Chiche at ThomX igloo about lasers and optics PDH_error_signal_with_Smaract_motors_ON-OFF.jpgLock_at_amp_@30%.jpg10kW_in_remote.jpg
this morning, I tested the laser+amplifier @ 30% lock on the FP cavity with and without Smaract motors.

I recorded the PDH error signal during a lock:
- blue   : with Smaract motors controller powered ON but motors are stopped
    Reply   33MHz oscillator + Alphanov amplifier lock, posted by Ronic Chiche at ThomX igloo about lasers and optics ThomX_FP_intracavity_signal.m
I checked with the Matlab code below the CEP detuning effect (2nm sech² spectrum... not exactly the same as in ThomX)
@ CEP = 0 => coupling = 100% and Gcav = 10.5k
if all the coupling loss comes from the CEP detuning effect :
    Reply   33MHz oscillator + Alphanov amplifier lock, posted by Ronic Chiche at ThomX igloo about lasers and optics 
we checked yesterday morning the real input power @ 30% for the amp => it is 16W in agreement with the previously measured values




Ronic
Chiche wrote:



I checked with the Matlab code below the CEP detuning effect (2nm
    Reply   33MHz oscillator + Alphanov amplifier lock, posted by Ronic Chiche at ThomX igloo about lasers and optics 
Today, we locked the cavity with input power @ 30% for the amp => we got 40kW with only 30% of coupling (and a bad lock => we could have more power
inside cavity).

P@30% = 16W
    Reply   33MHz oscillator + Alphanov amplifier lock, posted by Ronic Chiche at ThomX igloo about lasers and optics 
redoing the PDH error signal scheme with discrete components is more flexible and it is easier to check the signal/noise ratio.
now, we are able to get a quite clean lock only with the PZT correction (w/o fast feedback correction using the EOM) even with both motors controllers
ON (cavity and laser).
Entry   33MHz laser SN2439 back to Orsay, posted by Ronic Chiche at Optical room about lasers and optics Capture.PNG
On the 8th of July, the SN2439 33MHz laser was returned from NKT to our lab, being repaired.

it stayed all the weekend to warm up in the optical room and has been turned on on Monday.

the mode-locking was not working (28mW output power and a CW line for the optical spectrum), thus I "kicked" the laser with 100µm
    Reply   33MHz laser SN2439 back to Orsay, posted by Ronic Chiche at Optical room about lasers and optics 
This morning, with Aurélien and Daniele, we did the swap between the 33MHz and 133MHz oscillators.

now, the 33MHz oscillator is on ThomX inside the casemate.
it has been restarted and some laser is going out.
    Reply   33MHz laser SN2439 back to Orsay, posted by Ronic Chiche at Optical room about lasers and optics Stick-Slip_Positioners_Mechanical_and_Electrical_Interface_Data_Sheet.pdf
Yesterday with Aurélien, we try to make the laser modelock using the Smaract translation stages embedded inside the laser head.

unfortunately, we got some errors when we try to do the "calibration" and "reference" of both Smaract stages !
we contacted by email M. Nicoul to help us on this topic
    Reply   33MHz laser SN2439 back to Orsay, posted by Ronic Chiche at Optical room about lasers and optics 
Today, we used an "ELI-NP" Smaract controller made with these 2 references :
MCS-3CC-ETH-TAB (SN 2271) => main controller
MCS-3S-EP-SDS15-TAB (SN 2472) => sensor module
    Reply   33MHz laser SN2439 back to Orsay, posted by Ronic Chiche at Optical room about lasers and optics 
Yesterday, we put back the 33MHz oscillator into the casemate with the new Smaract controller.
after switching ON the laser controller, we saw some power at the output but we have to check if the laser is modelock or not.




Ronic