  Status of commissioning, report also here plots are reports., Page 2 of 24  Not logged in ELOG logo
    Reply   restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
this morning, with Vincent :

- we added the 10Hz trigger to the CH2 on the remote scope (192.168.229.21) to check the synchronization at the right timing.
CH1 : 33MHz RING
Entry   removing of the M1 mirror, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | vacuum 
after trying to increase the power and after moving S3 to try to change the size of the beam on the mirrors, the FPC power suddenly droped.

so, we need to remove M1 to check if it has been damaged.

we placed an iris in reflection of the FPC to keep the alignment for the new mirror M1.
    Reply   removing of the M1 mirror, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | vacuum 6x
this morning, with Daniele, we took some images of the M1 mirror HR surface :

1- large image span of the mirror surface (~center) before being cleaned :
one can see a lot of spots
    Reply   removing of the M1 mirror, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | vacuum 
This afternoon, we installed a new M1 mirror, the only one for which the box was not already opened.

as the mirror should be "brand new", as the LMA has packaged it, we decided not to clean it with ultra-pure water and to install it
out of the box.
    Reply   removing of the M1 mirror, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | vacuum 
the pressure level with the ionic pump was limited to ~ 1.5 .10**-7 mbar after several days of pumping, due to some leakage located on the bottom screws
of the large flange.

so we decided to reopen the flange and change the copper joint.
    Reply   removing of the M1 mirror, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | vacuum 
this morning, the vacuum level is still around 1.9 10**-7.

the vacuum guys said that last time, the pumping was much faster.

they ask if baking the vessel (with the mirrors inside ?) is absolutely impossible...
Entry   polarization measurement of the FP cavity beam, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
today, with Daniele, we did a simple polarization measurement in transmission of the FP cavity beam.

1) we locked the FP cavity and measured 82.5kw (for 33% amplifier ratio) with the power-meter moved a little bit further (this is maybe the reason
why the power is a little bit lower than usually measured).
Entry   optical attenuator added on the diffuser + new PID parameters, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
Today we did several long runs (~1h each) at ~23kW, 46kW, 66kW with different PID parameters which seems better.

P = 0.1
I  = 0.0015
Entry   mirrors removing, posted by Ronic Chiche at ThomX igloo about lasers and optics 
This morning with Viktor, we opened the 2 vessels and removed the 4 FP-cavity mirrors.

all the mirrors have been put in plastic boxes with labels to indicate which mirror it is,

and with all the HR coatings face down.
Entry   long run to test the appearance of high frequency noise, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics long_run_with_different_FPC_power.png
Today with Daniele, we did 6 long runs at different power (23kW, 46kW, 66kW, 73kW, 92kW, 92kW)

All the lock loss in between these several runs are due to FPC locking parameters change.
most of the few lock losses during the stable power duration, are due to 20Hz oscillation noise or because we forgot to center properly the PZT
    Reply   long run to test the appearance of high frequency noise, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 2025-07-10_-_long_run.png
today, long run directly at full power (33% amplifier ratio) => 98kW in the FPC at the very begining of the run.
(P=0.05 / I=0.0005 / D=0.6)

10-40 min : almost misalignment effect (CEP did not change so much)
Entry   locking, posted by Ronic Chiche at ThomX igloo about detectors and electronics Capture.JPGCapture.JPG
during the last days we changed the FP-cavity - RF reference locking system to force the right bucket:
in addition to the 500MHz beating which is the signal input to the PID, we added a 33MHz beating signal which is the trigger signal of the PID.
then, the lock is triggered only when this trigger signal is close to 0.
Entry   lock oscillateur 33MHz - synthé 500MHz, posted by Ronic Chiche at Optical room about detectors and electronics 
pour préparer le lock cavité-anneau, j'ai un setup de lock en salle optique entre le laser OneFive 133MHz et un synthé à
533MHz (133MHz x4).
ce matin, j'ai pu locker les 2 ensembles avec le laselock avec une stabilité RMS, je pense inférieure à la ps.
    Reply   lock oscillateur 33MHz - synthé 500MHz, posted by Ronic Chiche at Optical room about detectors and electronics lock_anneau-cavite.pdf

régler le problème 1:
Kevin m'a apporté un déphaseur Minicircuits JSPHS-661 (400-660MHz / 180° de phase) qui permet de déphaser le 500MHz
de ~ 1ns avec une tension DC 0-10V.
    Reply   lock oscillateur 33MHz - synthé 500MHz, posted by Ronic Chiche at Optical room about detectors and electronics CFP_-_piezo_intra_cavité.pdfImage_of_P4_S2_window_open_Oxidization_shown.jpeg
Today, I installed a DB9-DB9 female-male cable on the PZT connector of the FP-cavity.
the PZT is connected between pins 1 and 2, with a capacitance around 70nF.
I need to make a prolongator cable BNC-DB9 female to connect it to the feedback system.
    Reply   lock oscillateur 33MHz - synthé 500MHz, posted by Ronic Chiche at Optical room about detectors and electronics FP-cavity_PZT_@0V.jpgFP-cavity_PZT_@10V.jpg
Today, I connected the BNC-DB9 female prolongator cable to the FP-cavity PZT cable (DB9-DB9) and to the channel B of the Laselock.

I additionnaly connected the reflected laser beam (normally connected to scope ch2) to the spectrum analyzer @ 1GHz to observe the 30th harmonic
of the laser comb.
    Reply   lock oscillateur 33MHz - synthé 500MHz, posted by Ronic Chiche at Optical room about detectors and electronics 20230908_190054.jpg
this afternoon, I installed the frequency detection scheme in the bunker :

- I changed the large reflected photodiode DET100 by a fast small DET10.

- a 50ohms splitter is connected to the photodiode :
    Reply   lock oscillateur 33MHz - synthé 500MHz, posted by Ronic Chiche at Optical room about detectors and electronics 
this afternoon, I tried to lock the FP-cavity on a local 500MHz synthesizer as a frequency reference
(it's faster to change the frequency from the sythesizer than from the FP cavity !!!)

I found some parameters on the PID of the Laselock to phase-lock the reference and the FP-cavity
    Reply   lock oscillateur 33MHz - synthé 500MHz, posted by Ronic Chiche at Optical room about detectors and electronics 20230913_114202.jpg
this morning, I added a Thorlabs lowpass filter at 1kHz after the mixer and a resistor at the Laselock output to the FP-cavity PZT.
I set the PID with P=10 and I=D~0

in attachement, a plot of the 500MHz mixer output, before and during the lock.
    Reply   lock oscillateur 33MHz - synthé 500MHz, posted by Ronic Chiche at Optical room about detectors and electronics 
this afternoon, I firstly connected the HV output of the Laselock to the FP-cavity PZT : https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/248

locking the FP-cavity on the local synthesizer works better with the improved HV output range.
the ~20Hz oscillation in the beating signal of the FP-cavity/synthesizer is still there.