1083
|
Thu Jun 5 08:26:31 2025 |
VM, IC, DN, RC | Under Process | Shift summary | Ring Commissioning |
|
Interaction region studies | | Goals: Optimization
of the IP. Verification of the llaser waist |
6x | |
Draft
|
Fri Jun 6 08:17:31 2025 |
MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025 | Under Process | Shift summary | Ring Commissioning |
|
| | 08h15 ThomX was started; Modulator,
Frig, Laser
08h21 Chillers were started, |
 | |
1094
|
Thu Jun 26 08:55:15 2025 |
IC, DN, RC, HG, ME | Under Process | Shift summary | Ring Commissioning |
|
Improve ring for X-rays | | Goal: Vertical orbit and angle
at the IP with I3 and I4 X-ray signals
8h55 Switch ON the modulator and |
7x | |
Draft
|
Wed Oct 1 07:42:45 2025 |
KD, IC, VM | Under Process | Shift summary | Ring Commissioning |
|
shift du 1e octobre 2025 | | 7h40: mise en chauffe à distance
(modulateur, frigo/chiller, laser, cyclage)
==> IHM cyclage très longue |
| |
1163
|
Fri Dec 5 08:31:59 2025 |
Entered by Super Team from 134.158.195.141 on Fri Dec 5 08:31:45 2025 | Under Process | Shift summary | Ring Commissioning |
|
| | 08h31 Warm-up ThomX: Modulator, Laser,
Fridge
08h36 Chillers were started, cycling |
| |
1168
|
Fri Dec 12 08:40:50 2025 |
VM, IC | Under Process | Shift summary | Ring Commissioning |
|
Check of the 70 MeV with MRSV, Ring studies | | 08h40 Warm-up ThomX: Modulator, Laser,
Fridge
8h45 Chillers were started, cycling |
    | |
1196
|
Fri Feb 20 07:54:25 2026 |
IC, VM | Under Process | Shift summary | Ring Commissioning |
|
| | 7h50: mise en chauffe en remote (chillers/frigo,
modulateur, cyclage)
08h57 HV is on |
  | |
564
|
Fri Sep 23 08:48:20 2022 |
Entered by Super Team from 134.158.195.141 on Fri Sep 23 08:39:36 2022 | | Shift summary | Ring |
|
Shift du 23/09/2022 | | AM :
État a l'arrivé
: |
6x | |
622
|
Thu Nov 3 09:18:49 2022 |
ND, IC, VK, VM | New Solution | Shift summary | Ring |
|
Shift àf 3/11/2022 | | 9:10 Air pressure: 8 bars, water resistivity
6,33Mohm
9:15 Modulator warm-up |
9x | |
641
|
Tue Dec 6 09:54:56 2022 |
ND, VC | Under Process | Info | Ring |
|
Intervention synchro | | 9:55 Intervention synchro en cours pour
regler l'ajustement de la phase et la
puissandce de la cavite RF. |
| |
649
|
Fri Dec 9 11:07:57 2022 |
Entered by Super Team from 134.158.195.141 on Fri Dec 9 11:07:40 2022 | Under Process | Anneau | Ring |
|
| | Phase Qmax = 138
Phase Emax = 88
energy jitter |
 | |
661
|
Thu Jan 5 01:18:58 2023 |
ND, SC, VM, VK | Under Process | Shift summary | Ring |
|
Prise de donnee 5/01 | | 9h15 Mise en chauffe modulateur
9h30 Fin ronde casemate
9h40 Resisivite eau B18: 4.71 |
8x | |
662
|
Fri Jan 6 09:17:54 2023 |
ND, IC, VK, VM | Under Process | Shift summary | Ring |
|
Prise de donnee 6/01 | | 9:15 Mise en chauffe modulateur
10:23 Temperature chiller incorrecte
11h Optilization of the beam for |
9x | |
710
|
Fri Mar 10 09:34:09 2023 |
IC, VM, ND, VK | New Solution | Shift summary | Ring |
|
Prise de donnee 10/3/2023 | | 9h20 Start modulator, cycle magnets
10h20 Intevention Vincent sur PA
10h40 Scan charge phase |
7x | |
Draft
|
Tue Apr 25 09:11:29 2023 |
ND,DN,SC,NE, EM | New Solution | Shift summary | Ring |
|
Quart collectif 25/4 | | 9h10 (ND): Mise en chauffe modulateur et
laser
9h15 mise en chauffe Chiller (SC) |
| |
744
|
Fri Apr 28 09:20:00 2023 |
ND, LS, IC, VM, VK | New Solution | Shift summary | Ring |
|
Prise de donnee 27/4/2023 | | 9:19: Mise en chauffe
10:24 Cycling magnets
10:50 Demarrage faisceau |
10x | |
757
|
Thu May 25 15:08:18 2023 |
NC,IC, VM,lS | | Shift summary | Ring |
|
| | 9:10 warm up modulator
10:30: cycling of magnets
10:20 : scan charge phase |
  | |
762
|
Wed Jun 7 16:02:33 2023 |
LS, MB, VC, ND | Reference Solution | Shift summary | Ring |
|
Programme prise de donnees 8/06 | | 9:23 Mise en chauffe
Nombreux pb vide dans health check
Acces casemate pour verification |
   | |
Draft
|
Thu Jun 29 13:09:57 2023 |
LS, ND | New Solution | Shift summary | Ring |
|
shift du 29 juin 2023 | | 9:45 Git pull
Test des interfaces... OK
Probleme sur les ecrans du compte |
| |
Draft
|
Fri Jun 30 13:14:30 2023 |
LS,ND | Under Process | Shift summary | Ring |
|
run du 30 juin 2023 | | 9:00 Warm up machine
10:40 Start the beam
10:50 Scan charge phase |
 |
|