  1083   Thu Jun 5 08:26:31 2025 VM, IC, DN, RCUnder ProcessShift summaryRing Commissioning Interaction region studies Goals: Optimization
of the IP. Verification of the llaser waist
 6x 
  Draft   Fri Jun 6 08:17:31 2025 MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025Under ProcessShift summaryRing Commissioning   08h15 ThomX was started; Modulator,
Frig, Laser

08h21 Chillers were started,
 ThomX_PhaseChargeScan20250606.pngThomX_FPC_TableVerticalScan20250606.png 
  1094   Thu Jun 26 08:55:15 2025 IC, DN, RC, HG, MEUnder ProcessShift summaryRing Commissioning Improve ring for X-rays  Goal: Vertical orbit and angle
at the IP with I3 and I4 X-ray signals

8h55 Switch ON the modulator and
 7x 
  Draft   Wed Oct 1 07:42:45 2025 KD, IC, VMUnder ProcessShift summaryRing Commissioning shift du 1e octobre 2025 7h40: mise en chauffe à distance
(modulateur, frigo/chiller, laser, cyclage)

==> IHM cyclage très longue
 Capture_d’écran_2025-10-01_074548_IHM_cyclage.png 
  1163   Fri Dec 5 08:31:59 2025 Entered by Super Team from 134.158.195.141 on Fri Dec 5 08:31:45 2025Under ProcessShift summaryRing Commissioning   08h31 Warm-up ThomX: Modulator, Laser,
Fridge

08h36 Chillers were started, cycling
  
  1168   Fri Dec 12 08:40:50 2025 VM, ICUnder ProcessShift summaryRing Commissioning Check of the 70 MeV with MRSV, Ring studies 08h40 Warm-up ThomX: Modulator, Laser,
Fridge

8h45 Chillers were started, cycling
 Screenshot_from_2025-12-12_14-02-43.pngScreenshot_from_2025-12-12_14-02-27.pngScreenshot_from_2025-12-12_14-02-14.pngScreenshot_from_2025-12-12_14-02-02.pngScreenshot_from_2025-12-12_14-01-35.png 
  1196   Fri Feb 20 07:54:25 2026 IC, VMUnder ProcessShift summaryRing Commissioning   7h50: mise en chauffe en remote (chillers/frigo,
modulateur, cyclage)

08h57 HV is on
 Screenshot_from_2026-02-20_16-34-18.pngScreenshot_from_2026-02-20_16-15-37.pngScreenshot_from_2026-02-20_12-00-27.png 
  564   Fri Sep 23 08:48:20 2022 Entered by Super Team from 134.158.195.141 on Fri Sep 23 08:39:36 2022 Shift summaryRing Shift du 23/09/2022 AM :


État a l'arrivé
:
 6x 
  622   Thu Nov 3 09:18:49 2022 ND, IC, VK, VMNew SolutionShift summaryRing Shift àf 3/11/2022 9:10 Air pressure: 8 bars, water resistivity
6,33Mohm

9:15 Modulator warm-up
 9x 
  641   Tue Dec 6 09:54:56 2022 ND, VCUnder ProcessInfoRing Intervention synchro 9:55 Intervention synchro en cours pour
regler l'ajustement de la phase et la
puissandce de la cavite RF.
  
  649   Fri Dec 9 11:07:57 2022 Entered by Super Team from 134.158.195.141 on Fri Dec 9 11:07:40 2022Under ProcessAnneauRing   Phase Qmax = 138

Phase Emax = 88

energy jitter
 Screenshot_from_2022-12-09_16-53-05.pngScreenshot_from_2022-12-09_16-52-44.png 
  661   Thu Jan 5 01:18:58 2023 ND, SC, VM, VKUnder ProcessShift summaryRing Prise de donnee 5/01 9h15 Mise en chauffe modulateur

9h30 Fin ronde casemate

9h40 Resisivite eau B18: 4.71
 8x 
  662   Fri Jan 6 09:17:54 2023 ND, IC, VK, VMUnder ProcessShift summaryRing Prise de donnee 6/01 9:15 Mise en chauffe modulateur

10:23 Temperature chiller incorrecte

11h Optilization of the beam for
 9x 
  710   Fri Mar 10 09:34:09 2023 IC, VM, ND, VKNew SolutionShift summaryRing Prise de donnee 10/3/2023 9h20 Start modulator, cycle magnets

10h20 Intevention Vincent sur PA

10h40 Scan charge phase
 7x 
  Draft   Tue Apr 25 09:11:29 2023 ND,DN,SC,NE, EMNew SolutionShift summaryRing Quart collectif 25/4 9h10 (ND): Mise en chauffe modulateur et
laser

9h15 mise en chauffe Chiller (SC)
  
  744   Fri Apr 28 09:20:00 2023 ND, LS, IC, VM, VKNew SolutionShift summaryRing Prise de donnee 27/4/2023 9:19: Mise en chauffe

10:24 Cycling magnets

10:50 Demarrage faisceau
 10x 
  757   Thu May 25 15:08:18 2023 NC,IC, VM,lS Shift summaryRing   9:10 warm up modulator

10:30: cycling of magnets

10:20 : scan charge phase
 ring_storage_quality__2023_05_25_15_10_phase_scan_frm_1000_atx300_to_2500_at_x360.pngring_storage_quality__2023_05_25_15_31_phase_scan_from_0_atx300_to_250_atx3230_30kV.pngring_storage_quality__2023_05_25_15_39_phase_scan_from_0_atx4320_to_2500_atx4470_35kV.png 
  762   Wed Jun 7 16:02:33 2023 LS, MB, VC, NDReference SolutionShift summaryRing Programme prise de donnees 8/06 9:23 Mise en chauffe

Nombreux pb vide dans health check

Acces casemate pour verification
 health_check_2023_06_08_09_30.pnghealth_check_RF_2023_06_08_09_30.pnghealth_check_Vide_2023_06_08_09_30.pnghealth_check_Alimentation_2023_06_08_09_31.png 
  Draft   Thu Jun 29 13:09:57 2023 LS, NDNew SolutionShift summaryRing shift du 29 juin 2023 9:45 Git pull

Test des interfaces... OK

Probleme sur les ecrans du compte
  
  Draft   Fri Jun 30 13:14:30 2023 LS,NDUnder ProcessShift summaryRing run du 30 juin 2023 9:00 Warm up machine

10:40 Start the beam

10:50 Scan charge phase 
 health_check_2023_06_30_13_20.pngscan_charge_phase_min_280.0_max_320.0_10_54_10.png 