| ID |
Date |
Author |
Status |
Type |
Category |
Important |
Subject |
Icon |
Text |
 |
|
955
|
Thu Nov 7 08:53:22 2024 |
IC, VK, VM, JN | Under Process | Shift summary | Ring |
|
| | 8h50 Start of the modumator and all subsystems
PC client 1 was frozen => we
restarted |
6x |
|
956
|
Fri Nov 8 09:35:41 2024 |
IC, VK, JN | Under Process | Shift summary | Ring |
|
ring studies | | 8h50 Start of the modumator and all subsystems
Beam studies.
Orbit Correction. |
13x |
|
990
|
Thu Jan 9 08:35:10 2025 |
IC, VK, VM, ND | Under Process | Shift summary | Ring |
|
| | 08h35 Start ThomX: Modulator, Frigo, All
magnets.
08h40 Cicling all magnets, Start |
15x |
|
Draft
|
Fri Apr 4 09:05:06 2025 |
ML, VM, DN, ND | Under Process | Shift summary | Ring |
|
Prise de données 4/04 | | 8:59 Mise en chauffe
9:15 Installation laser alignement
SR |
10x |
|
Draft
|
Thu Sep 11 08:49:20 2025 |
IC, VM | | | Ring |
|
BBA | | 08h50 Warm up of the modulator |
|
|
Draft
|
Thu Sep 11 11:12:36 2025 |
IC, VM | | | Ring |
|
BBA | | 8h50 Thomx warmup
10h20 HV is 'ON'
RF Gun phase is 254 dg. Sect phase |
  |
|
1178
|
Fri Jan 9 08:05:32 2026 |
KD, IC, VM, RC | Under Process | Shift summary | RF D1 | Linac Commissionning | Ring Commissioning |
|
shift du 9 janvier 2026 | | 8h05: mise en chauffe en remote (modulateur,
frigo/chillers, laser, cyclage)
09h06 HV is ON |
6x |
|
41
|
Fri Jun 25 16:35:18 2021 |
Entered by Christelle Bruni from 82.64.20.144 on Fri Jun 25 16:35:00 2021 | Fixed | Shift summary | RF D1 | Linac Commissionning |
|
Bilan du 25 juin 2021 : commissioning linac | | -Le canon a été |
|
|
42
|
Mon Jun 28 11:45:12 2021 |
Entered by Super Team from 134.158.195.141 on Mon Jun 28 11:24:57 2021 | Under Process | Linac | RF D1 | Linac Commissionning |
|
Attenuations |
| RF attenuations :
GUN
(Maximun atténuation) Limite Hard
= 1667 steps
Section |
 |
|
43
|
Mon Jun 28 15:53:17 2021 |
Entered by Super Team from 134.158.195.141 on Mon Jun 28 15:53:02 2021 | Under Process | Linac | RF D1 | Linac Commissionning |
|
Conditionnement de la section |
| Conditionnement de la section
Verification
et correction de la chaine de mesure
Ajustement
des atténuations des 3 voies : |
|
|
44
|
Tue Jun 29 15:20:43 2021 |
Entered by Hayg Guler from 86.247.24.134 on Tue Jun 29 15:20:25 2021 | Not Fixed | Linac | RF D1 | Linac Commissionning |
|
Conditionnement de la section |
| Preparation au conditionnement de la Section
Soucis avec le modulateur
Modulateur
se met en chauffage suite à un interlock |
|
|
49
|
Tue Jul 6 18:38:26 2021 |
Entered by Hayg Guler from 134.158.195.141 on Tue Jul 6 18:38:12 2021 | Under Process | Linac | RF D1 | Linac Commissionning |
|
Mesures de PiK | |
alim(V)
UHT(kV)
Puissance
sortie de PA (W) avec cable
mesure
Power meter (dBm)
couplage+attenuation+IL |
|
|
192
|
Tue Nov 30 10:31:04 2021 |
Entered by Super Team from 134.158.195.141 on Tue Nov 30 10:30:47 2021 | Not Fixed | Problem | RF D1 | Linac Commissionning |
|
Soucis modulateur | | problèmes pour démarrer,
il se met encore en défait pendant
la periode de chauffe. Le probleme vu hier |
|
|
234
|
Wed Jan 5 15:25:30 2022 |
Entered by Super Team from 134.158.195.141 on Wed Jan 5 15:25:13 2022 | Under Process | Problem | RF D1 | Linac Commissionning |
|
Interventon Modulateur | | Soucis modulateur qui ne passe pas en HV.
--> [MO, JN] : Intervention
sur le modulateur. |
|
|
236
|
Wed Jan 5 17:41:03 2022 |
Entered by Super Team from 134.158.195.141 on Wed Jan 5 15:25:13 2022 | Under Process | Problem | RF D1 | Linac Commissionning |
|
RE: Interventon Modulateur | | soucis Modulateur toujours pas réglé.
Un signal (dans un module d'automate
du modulateur) semble poser problème. |
|
|
244
|
Thu Jan 13 16:22:09 2022 |
Entered by Super Team from 134.158.195.141 on Thu Jan 13 16:21:55 2022 | Under Process | Linac | RF D1 | Linac Commissionning |
|
Demarrage machine | | Démarrage :
Rondiers
: coup de poing d'arret d'urgence
étaient enfoncés, on a du appeler |
    |
|
284
|
Fri Jan 28 15:26:02 2022 |
Entered by Super Team from 134.158.195.141 on Fri Jan 28 15:25:46 2022 | Under Process | Info | RF D1 | Linac Commissionning |
|
Shift du jour | | 14h30 : Machine démarée :
15h20 : Modulateur en défaut
|
|
|
357
|
Mon Feb 21 14:35:18 2022 |
Entered by Super Team from 134.158.195.141 on Mon Feb 21 14:35:03 2022 | Not Fixed | Problem | RF D1 | Linac Commissionning |
|
message debit eau modulateur | | un message de debit insuffisant est apparu
ce matin (40 l/min au lieu de 80 l/min)
une intervention est demandée |
|
|
386
|
Mon Mar 7 13:40:56 2022 |
Entered by HM from 134.158.195.141 on Mon Mar 7 13:40:36 2022 | Not Fixed | Problem | RF D1 | Linac Commissionning |
|
PSS en sdc arreté | | Le PSS ne tourne plus en SdC (roue crantée
figées) depuis le 5 mars 7:40
HM |
|
|
387
|
Mon Mar 7 16:30:36 2022 |
Entered by Super Team from 134.158.195.141 on Mon Mar 7 16:30:22 2022 | Fixed | Problem | RF D1 | Linac Commissionning |
|
PSS redemarre | | Intervention Maher : PSS ok
|
|