7h40: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage)
==> IHM cyclage très longue à lancer, (a planté hier, pas aujourd'hui), des nan apparaissent (cf. screenshot)
08h45 Start modulator
09h09 There is a problem with the HV increasing above 1212 V
09h21 HV=1215 V
09h35 Beam is in the ring
RF gun phase 272 dg. Laser Att. 280 for -100 pC, Sect. Att. 2.38 dB, Phase 207 dg. Linac steerers: H [0.85 -3.17 ], V [-2.24 2.78]
09h49 RF gun phase 282 dg. Laser Att. 280 for -100 pC, Sect. Att. 2.38 dB, Phase 210 dg. Linac steerers: H [0.85 -3.17 ], V [-2.24 2.78]
Laser feedback does not seem to support maximum laser spot density
09h55 Modulator set to standby
Magnet offset: output Ri_C2 DP04 rise 6/12 turns, output Ri_C1 DP04 fall 3/12 turns,
12:00 HV in standby mode
14h30 HV is ON
Several accesses in the casemat with Rodolphe to rotate the dipoles. 4 dipoles are totated.
The vertical orbit seems to go in the good direction. Work in progress.
Still need one iteration tomorrow morning with Rodolphe.
18h20 STOP THOMX |