HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 8 of 62  Not logged in ThomX    logo
Entry   MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025;  ThomX_PhaseChargeScan20250606.pngThomX_FPC_TableVerticalScan20250606.png
Entry   IC, DN, RC, HG, ME; Improve ring for X-rays  7x
Entry   KD, IC, VM; shift du 1e octobre 2025 Capture_d’écran_2025-10-01_074548_IHM_cyclage.png
Entry   Entered by Super Team from 134.158.195.141 on Fri Dec 5 08:31:45 2025;  
Entry   VM, IC; Check of the 70 MeV with MRSV, Ring studies Screenshot_from_2025-12-12_14-02-43.pngScreenshot_from_2025-12-12_14-02-27.pngScreenshot_from_2025-12-12_14-02-14.pngScreenshot_from_2025-12-12_14-02-02.pngScreenshot_from_2025-12-12_14-01-35.png
Entry   IC, VM;  Screenshot_from_2026-02-20_16-34-18.pngScreenshot_from_2026-02-20_16-15-37.pngScreenshot_from_2026-02-20_12-00-27.png
Entry   Entered by Super Team from 134.158.195.141 on Fri Sep 23 08:39:36 2022; Shift du 23/09/2022 6x
Entry   ND, IC, VK, VM; Shift àf 3/11/2022 9x
Entry   ND, VC; Intervention synchro 
Entry   Entered by Super Team from 134.158.195.141 on Fri Dec 9 11:07:40 2022;  Screenshot_from_2022-12-09_16-53-05.pngScreenshot_from_2022-12-09_16-52-44.png
Entry   ND, SC, VM, VK; Prise de donnee 5/01 8x
Entry   ND, IC, VK, VM; Prise de donnee 6/01 9x
Entry   IC, VM, ND, VK; Prise de donnee 10/3/2023 7x
Entry   ND,DN,SC,NE, EM; Quart collectif 25/4 
Entry   ND, LS, IC, VM, VK; Prise de donnee 27/4/2023 10x
Entry   NC,IC, VM,lS;  ring_storage_quality__2023_05_25_15_10_phase_scan_frm_1000_atx300_to_2500_at_x360.pngring_storage_quality__2023_05_25_15_31_phase_scan_from_0_atx300_to_250_atx3230_30kV.pngring_storage_quality__2023_05_25_15_39_phase_scan_from_0_atx4320_to_2500_atx4470_35kV.png
Entry   LS, MB, VC, ND; Programme prise de donnees 8/06 health_check_2023_06_08_09_30.pnghealth_check_RF_2023_06_08_09_30.pnghealth_check_Vide_2023_06_08_09_30.pnghealth_check_Alimentation_2023_06_08_09_31.png
Entry   LS, ND; shift du 29 juin 2023 
Entry   LS,ND; run du 30 juin 2023 health_check_2023_06_30_13_20.pngscan_charge_phase_min_280.0_max_320.0_10_54_10.png
Entry   IC, VK, VM, JN;  6x