  Toutes les notes concernant les Commissionning de ThomX, Page 62 of 62  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   C. Bruni/ H. Guler; alignement BBA en cours 
Entry   C. Bruni; visite fausse nord ce matin 
icon14.gif   BM/NE/JNC; passage TL MPS 
Entry   AM/SC/CB/JNC; camera TL/SST2 + fente 
Entry   AM, VI, VK, IC, VC, ND; Shift du 30/09/2022 16x
Entry   AM, IC, VK, VI, SC, ND; Shift du 29/09/2022 9x
Entry   AM ND LP KD et al; Démarrage de la machine 
Entry   7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage); , entered from 127.0.0.1 
Entry   VK, IC. VM, AL, ND, LS; Orbit correction, optimization of the storage, study of the RF frequency 8x
Entry   M ELK; Suite conditionnement section 13/08 pour validation  Scope_RF_signals_0.1dB_3µs_25Hz_13082024.pngRedpitaya_RFsignals_0.1_dB_3µs_25_Hz_13082024.png
Entry   ; , entered from 134.158.195.141 