  1155   Fri Nov 21 08:02:04 2025 KD MJ DN StudentsUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 21 novembre 2025 8h: mise en chauffe en remote (modulateur,
frigo/chillers, laser, cyclage)
9h: start 
 IMG-20251121-WA0003.jpgIMG-20251121-WA0005.jpg20251121_185206.JPG 
  1154   Thu Nov 20 09:26:33 2025 VM, ICUnder ProcessUrgentLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning BBA Ring Goal: Ring BBA

09h14 Unable to start thomx. Need
help. Probably problem with cooling water.
 Errors.jpegScreenshot_from_2025-11-20_14-04-53.png 
  1153   Wed Nov 19 10:43:41 2025 HG + JM + ND (aprem)Under ProcessInfoLI | TL | LE Shift mesure Twiss + Simu icon1.gif 8:30 : demarrage à distance 
 

12:10 : QP7 Scan 1 (Phase section
 7x 
  1152   Tue Nov 18 11:11:33 2025 HG, JM, NDUnder ProcessShift summaryLI Prise de données 18/11 9h Intervention laser

Intervention pour realignement
el/dg/sst.01
  
  1151   Tue Nov 18 07:56:42 2025 KDUnder ProcessShift summaryLinac Commissionning shift du 18 novembre 2025 7h50: mise en chauffe en remote de la machine
(laser, frigo/chiller, cyclage)

==> le modulateur ne répond
 2025-11-18_10_56_51_li_op_las_02_RAW.png 
  Draft   Thu Nov 13 08:00:59 2025 KD MJ VM HGFixedShift summaryLI | TL | LE | Ring | Opt | Linac Commissionning | Ring Commissioning shift du 13 novembre 2025 - spectres a differentes valeurs de bpmTL2_X Apres que Kevin a regle tous les problemes
synchro signal bpm etc etc etc

L'interface SST ne fonctionne
  
  1149   Wed Nov 12 10:29:49 2025 Entered by Super Team from 134.158.76.9 on Wed Nov 12 10:29:34 2025Under ProcessShift summaryLI | TL | Ring   15h09 Cycling all magnets

15h12 HV is ON

15h15 The modulator was set to
  
  1148   Mon Nov 10 16:15:53 2025 KD, M2 GIFixedShift summaryLI | TL | Linac Commissionning shift du 10 novembre 2025 8h: mise en chauffe en remote (modulateur,
laser, frigo/chiller)

10h: Démarrage machine
  
  1147   Fri Nov 7 18:45:54 2025 Entered by Super Team from 134.158.205.4 on Fri Nov 7 18:45:38 2025Under ProcessShift summaryLinac Commissionning   08h34  Warm-up ThomX: Modulator, Laser,
Fridge

08h40 Chillers were started,
 Screenshot_from_2025-11-07_16-24-10.pngScreenshot_from_2025-11-07_16-24-35.pngScreenshot_from_2025-11-07_16-23-58.png 
  Draft   Thu Nov 6 08:30:52 2025 Entered by Super Team from 134.158.195.141 on Thu Nov 6 08:30:37 2025Under ProcessUrgentTL | LE   08h30  Warm-up ThomX: Modulator,
Laser, Fridge

08h36 Chillers were started,
 SectOutput20251030.pngSectOutput20251106.png 
  Draft   Wed Nov 5 12:50:55 2025 Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025      Matin :

Soucis synchro :
- Nicolas les a redémarré
 Screenshot_from_2025-11-05_17-49-33.pngScreenshot_from_2025-11-05_17-51-14.pngScreenshot_from_2025-11-05_17-50-44.png 
  Draft   Thu Oct 30 07:21:22 2025 Entered by Marie Jacquet from 134.158.205.9 on Thu Oct 30 07:21:05 2025Under ProcessShift summaryLI | TL | LE | Ring Programme shift (X-rays spectres vs atte & phases) 08h17 Warm-up ThomX: Modulator, Laser,
Fridge

08h24 Chillers were started, cycling
  
  Draft   Tue Oct 28 08:40:22 2025 Entered by Super Team from 134.158.195.141 on Tue Oct 28 08:40:06 2025Under ProcessShift summary    08h40 Warm-up ThomX: Modulator, Laser,
Fridge

08h45 Chillers were started, cycling
 Screenshot_from_2025-10-28_11-48-31.pngScreenshot_from_2025-10-28_11-47-12.pngScreenshot_from_2025-10-28_11-46-55.pngScreenshot_from_2025-10-28_15-34-03.png 
  Draft   Fri Oct 24 08:33:30 2025 Entered by Super Team from 134.158.195.141 on Fri Oct 24 08:33:07 2025Under ProcessShift summary    08h32 Warm-up ThomX: Modulator, Laser,
Fridge

08h37 Chilers were started, cycling
  
  1141   Thu Oct 23 07:45:25 2025 KD RC VC MJUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning shift du 23 octobre 2025 7h45: mise en chauffe en remote (modulateur,
laser, frigo/chillers, cyclage)
8h45 : mise en route Modulateur
  
  Draft   Tue Oct 21 12:29:35 2025 HG, DN. VM, MJ      11h40 Thomx warm-up

12h35 HV is ON

12h40 HV 1215 V
 mrsv_2_positions_fente.png 
  1139   Fri Oct 17 09:07:03 2025 MO VC ND VM Shift summaryLI | TL | LE | Linac Commissionning Shift summary demarrage machine 8H35
9H45 hV on 1215V
Q linac 100pC
  
  Draft   Thu Oct 16 07:37:52 2025 KD, IC, VMUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 16 octobre 2025 7h30: mise en chauffe en remote (chillers/frigo,
laser, cyclage)

==> impossible de passer en
 6x 
  1137   Tue Oct 14 08:00:18 2025 KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 14 octobre 2025 7h55: mise en chauffe en remote (laser,
frigo/chiller, modulateur, cyclage)

==> Nouvelle interface de cyclage,
 8x 
  1136   Mon Oct 13 13:40:05 2025 HaygUnder ProcessInfoLinac Commissionning Emittance QP3  QP3 scan

vary Soleno
Iris 1mm ATT 400 (150 pC)
  