348
|
Fri Feb 18 09:02:51 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Fri Feb 18 09:02:37 2022 | Fixed | Info | Linac Commissionning |
|
faisceau | |
Y a t'il un fasceau aujourd'hui? |
|
355
|
Mon Feb 21 08:59:50 2022 |
Entered by Christelle Bruni from 109.190.253.15 on Mon Feb 21 08:59:29 2022 | Under Process | Info | Infra |
|
entretien pont roulant en cours | |
les portes de l'igloo seront ouvertes |
|
356
|
Mon Feb 21 13:57:08 2022 |
Entered by Super Team from 134.158.195.141 on Mon Feb 21 13:56:51 2022 | Fixed | Info | Linac Commissionning |
|
fin tests du pont roulant | |
Tests du pont roulant Igloo terminés
vantaux grande porte entrée fermés (crinoline et ventaux ok sur PSS)
|
|
362
|
Tue Feb 22 15:11:28 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Tue Feb 22 15:11:12 2022 | Fixed | Info | Linac Commissionning |
|
Démarrage - arrêt laser-cathode | |
Status initial = l'oscillateur fonctionne (LI/OP/OPT.02-LAS.01-OSL : START Oscillator) et synchronisé sur la horloge.
1. Démarrage l'ampli : LI/OP/OPT.02-LAS.01-ASP.01 : START_Ampli
2. Blocage temporair du faisceau laser (l'ampli fonctionne) : LI/OP/OPT.02-LAS.01-ASP.01 : Gate_Int - False
3. Delocage faisceau laser (l'ampli fonctionne) : LI/OP/OPT.02-LAS.01-ASP.01 : Gate_Int - True
4. Arrêt l'ampli (l'oscillateur reste fonctionnel) :LI/OP/OPT.02-LAS.01-ASP.01 : STOP_Ampli |
|
367
|
Wed Feb 23 11:49:38 2022 |
CB/JNC/MO | Fixed | Info | Linac Commissionning |
|
repérage sens moteur solénoides | |
Mise en place par Jean Noel, d'un système de repérage visuel des déplacements.
Xtranslation correspond à une translation horizontale, négatif vers le mur et positif vers l'anneau
Ztranslation correspond à une translation verticale, négatif ca descend, et positif ca monte
Rotation X inclinaison négative vers le bas et positive vers le haut
Rotation Z inclinaison positive vers l'anneau et négative vers le mur |
|
375
|
Mon Feb 28 17:13:12 2022 |
Entered by Super Team from 134.158.195.141 on Mon Feb 28 17:12:48 2022 | | Info | Linac Commissionning |
|
IHM | |
apres un balayage de l ecran nous avons trouve l IHM
desoler pour l alerte
cordialement |
|
380
|
Wed Mar 2 11:57:59 2022 |
CB/VC | Fixed | Info | Laser | SY |
|
suivi mesure de phase | |
taurustrend test/cc/osc.01/measurement1
A mettre dans l'archivage |
|
385
|
Thu Mar 3 19:12:31 2022 |
Entered by Super Team from 134.158.195.142 on Thu Mar 3 19:12:16 2022 | Under Process | Info | Linac Commissionning |
|
Mesure energie fin linac | |
Mesures d'énergie en fin de linac en fonction de la phase section.
- A 60° de phase

A 110° de Phase :

18h40 ; le laser s'est délocké. Ensuite difficile de le récupérer.
Nouvelle phase : 238
en plus la charge est bien tombée ...

Bon on arrete, on ne comprend pas cette chutte de charge qui est venue apres la perte de la phase.
|
|
397
|
Fri Mar 11 14:10:11 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Fri Mar 11 14:09:56 2022 | Fixed | Info | Laser |
|
Laser status | |
Actuellement on a 50 µJ sur la cathode après une rotation du hublot. |
|
398
|
Mon Mar 14 13:57:12 2022 |
Entered by Maher OMEICH from 134.158.91.212 on Mon Mar 14 13:56:48 2022 | | Info | RF D1 |
|
| |
Bonjour,
Je recommande de mettre une consigne de tension modulateur de 1000 V au démarrage puis monter à la valeur de 1090 V afin d'éviter un réfléchi au démarrage à froid
Maher |
|
406
|
Fri Mar 18 10:34:19 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Fri Mar 18 10:34:03 2022 | Fixed | Info | Linac Commissionning |
|
Laser status | |
L'energie UV sur la cathode = 30µJ |
|
407
|
Mon Mar 21 09:53:11 2022 |
Entered by Iryna Chaikovska from 134.158.195.144 on Mon Mar 21 09:52:37 2022 | | Info | Aimants |
|
Cyclage QUAD (TL) | |
The cycling of the following quads ( to zero current) were tested. The corresponding cycling cuves were loaded in the DS (checked).
TL/PS/cycleQP.01
TL/PS/cycleQP.02
TL/PS/cycleQP.03 |
|
424
|
Mon Apr 4 10:50:19 2022 |
Entered by Super Team from 83.202.31.199 on Mon Apr 4 10:50:04 2022 | Fixed | Info | Linac Commissionning |
|
Planning cette semaine | |

|
| Attachment 1: Planning_linac_semaine_du_4_avril.pptx
|
|
426
|
Mon Apr 4 17:00:13 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Mon Apr 4 16:59:57 2022 | Fixed | Info | Linac Commissionning |
|
Laser status | |
Un hublot a ete change Si->CaF2. Energie UV sur la cathode 52µJ, Iris est dispo. |
|
429
|
Wed Apr 6 10:47:31 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Wed Apr 6 10:47:13 2022 | Fixed | Info | Linac Commissionning |
|
Laser status | |
L'image du laser a été aligné au centre de la camera. L'énergie sur la cathode=37µJ. Diamètre IRIS a été augmenté de 2.8 à 5mm. Signal photodiode =75mV.
|
|
430
|
Wed Apr 6 11:22:03 2022 |
JNC/HG/CB | Fixed | Info | Linac Commissionning |
|
avant démarrage | |
Test steerers avec le gaussemètre de PHIL
ajout de mumetal pour arreter le champ de la pompe au niveau de l'entrée
Visite
intervention Olivier et Maher pour le pilotage des aimants pulsés
intervention de Viktor, pour réaligner la camera sur la table photocathode
|
|
432
|
Wed Apr 6 11:32:25 2022 |
Entered by Maher OMEICH from 134.158.91.212 on Wed Apr 6 11:32:06 2022 | | Info | Aimants |
|
intervention sur CC EP | |
Intervention términée sur le EP |
|
433
|
Thu Apr 7 11:31:31 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Thu Apr 7 11:31:17 2022 | Fixed | Info | Linac Commissionning |
|
Laser status | |
Hublot_1 (dans la salle laser) a été enlevé, hublot_2 (casemate) - changé pour CaF2.
L'nergie sur la cathode = 62µJ (IRIS=3mm) |
|
434
|
Thu Apr 7 12:51:41 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Thu Apr 7 11:31:17 2022 | Fixed | Info | Linac Commissionning |
|
RE: Laser status | |
| Entered by Viktor Soskov from 134.158.195.153 on Thu Apr 7 11:31:17 2022 wrote: |
|
Hublot_1 (dans la salle laser) a été enlevé, hublot_2 (casemate) - changé pour CaF2.
L'nergie sur la cathode = 62µJ (IRIS=3mm)
|
Stabilité :
La stabilité reste bonne
mean x 5460.00 µm +/- 10.14 µm
mean y 3173.65 µm +/- 8.58 µm
FWHM x 928.64 µm +/- 67.32 µm
FWHM y 918.32 µm +/- 26.75 µm
Iris : on est passé de 3mm à 1.5 mm.
 
|
|
438
|
Tue Apr 12 09:08:20 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Tue Apr 12 09:08:05 2022 | Fixed | Info | Linac Commissionning |
|
Laser status | |
Laser est allumé. Gate - False. |