  Draft   Wed Jul 1 11:24:44 2026 Entered by Super Team from 127.0.0.1 on Wed Jul 1 11:24:31 2026       

 

 
  
  1240   Tue May 12 08:42:45 2026 Entered by Super Team from 127.0.0.1 on Tue May 12 08:42:31 2026Under ProcessOtherLI manip Gplast Demarrage machine 8h40

pB reflechi canon... temp consigne
27.7C
 Screenshot_from_2026-05-12_10-33-26.png 
  Draft   Tue Jun 30 09:49:22 2026 Entered by Super Team from 127.0.0.1 on Tue Jun 30 09:48:28 2026      Maher started the modulator

9h50 HV is on

09h53 Beam is in the ring w/o RF
  
  Draft   Tue Jun 23 09:43:31 2026 Entered by Super Team from 127.0.0.1 on Tue Jun 23 09:43:18 2026 Shift summary  Vaccum in the FPC 09h00 Start-up modulator, laser, fridge,
chillers

After discussion with Daniele
  
  1247   Tue Jun 16 13:43:30 2026 Entered by Super Team from 127.0.0.1 on Tue Jun 16 13:43:02 2026 FixLI   Hello,

I short-circuit the MPS input to
modulator, we can trig modulator, the klystron
  
  Draft   Tue Jun 9 10:13:24 2026 Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026      10h02 Start-up modulator, laser, fridge,
chillers

The SF6 pressure is low. Magnet
  
  1190   Tue Feb 10 18:34:33 2026 Entered by Super Team from 127.0.0.1 on Tue Feb 10 18:34:13 2026Under ProcessShift summaryLI | RF D1 Demarrage Linac icon1.gif Mesures après remontage de la cale
: 1215 V sur le modulateur.
ça tient mais
  
  Draft   Thu Mar 19 07:46:50 2026 Entered by Super Team from 127.0.0.1 on Thu Mar 19 07:46:39 2026    , entered from 127.0.0.1 7h45: mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)

8h46 The photocathode laser image
  
  Draft   Thu Apr 16 07:32:25 2026 Entered by Super Team from 127.0.0.1 on Thu Apr 16 07:32:14 2026    , entered from 127.0.0.1 7h30 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

9h00 HV is ON
 Screenshot_from_2026-04-16_20-53-14.pngScreenshot_from_2026-04-16_20-53-34.png 
  Draft   Mon Mar 9 12:55:30 2026 Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026    Restart after strange last shift  12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen
put last motor positions (2266 &&
  
  Draft   Fri Mar 13 08:33:25 2026 Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026      08h32 Warm-up ThomX: Modulator, Laser,
Fridge

08h37 Chillers were started, cycling
  
  1192   Fri Feb 13 17:38:15 2026 Entered by Super Team from 127.0.0.1 on Fri Feb 13 17:38:00 2026Under ProcessShift summaryLI SHift du jour The code for laser alignment does not work
properly --> done by hand 
H 5.244
  
  1189   Fri Feb 6 08:26:41 2026 Entered by Super Team from 127.0.0.1 on Fri Feb 6 08:26:22 2026Under ProcessShift summaryRF D1   08h25 Warm-up ThomX: Modulator, Laser,
Fridge

08h33 Chillers were started, cycling
 Screenshot_from_2026-02-06_10-52-58.png 
  Draft   Fri Apr 24 08:05:11 2026 Entered by Super Team from 127.0.0.1 on Fri Apr 24 08:05:02 2026    , entered from 127.0.0.1 8h00 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)
  
  24   Tue Jun 8 17:40:20 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:40:07 2021FixedShift summaryresumes Résumé de la journée - Pour les atténuateurs : les butées
ont été trouvées, ATT02-MOT01
c'est la canon, ATT01-MOT01 c'est
  
  23   Tue Jun 8 17:30:12 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:29:26 2021FixedInfoetc   Capture ecran modulateur  HT_1100.png 
  22   Tue Jun 8 17:27:35 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:27:21 2021Under ProcessInfoPrise de donnees HT sur modulateur et radioprotection Contrôle radioprotection en cours
HT = 1240V tension max, vide klystron : 1.2
uA
  
  21   Tue Jun 8 17:16:10 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:15:58 2021FixedInfoetc   Modulateur OK, HT = 500 V en trig   
  20   Tue Jun 8 17:04:44 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:04:28 2021FixedInfoetc Hv sur modulateur Sur le MPS, Vérifiez qu'on est
bien en PARAMETRES/ Linac pour autorisation
HV sur modulateur
  
  19   Tue Jun 8 15:58:08 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 15:57:55 2021Under ProcessInfoetc   Modulateur remis en chauffe car interlock   