Entered by Super Team from 127.0.0.1 on Wed Jul 1 11:24:31 2026;
|
|
Entered by Super Team from 127.0.0.1 on Tue May 12 08:42:31 2026; manip Gplast
|
Demarrage machine 8h40
pB reflechi canon... temp consigne 27.7C
10h50 redemarrage chiller gun ... |
Entered by Super Team from 127.0.0.1 on Tue Jun 30 09:48:28 2026;
|
Maher started the modulator
9h50 HV is on
09h53 Beam is in the ring w/o RF |
Entered by Super Team from 127.0.0.1 on Tue Jun 23 09:43:18 2026; Vaccum in the FPC
|
09h00 Start-up modulator, laser, fridge, chillers
After discussion with Daniele
Goal/Priority: Check for leakage in the FPC |
Entered by Super Team from 127.0.0.1 on Tue Jun 16 13:43:02 2026;
|
Hello,
I short-circuit the MPS input to modulator, we can trig modulator, the klystron filmant time goes to full time , need 45 min, you can start at 14:35 |
Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026;
|
10h02 Start-up modulator, laser, fridge, chillers
The SF6 pressure is low. Magnet power supplies filed to start.
11h17 Stop ThomX |
Entered by Super Team from 127.0.0.1 on Tue Feb 10 18:34:13 2026; Demarrage Linac
|
Mesures après remontage de la cale : 1215 V sur le modulateur. ça tient mais encore des claquages
dans le Canon à 0dB. Il faut faire travailler encore un peu demain.
la suite demain |
Entered by Super Team from 127.0.0.1 on Thu Mar 19 07:46:39 2026; , entered from 127.0.0.1
|
7h45: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
8h46 The photocathode laser image on the camera is very weak, I can't initiate feedback. Help needed.
08h56 HV is on |
Entered by Super Team from 127.0.0.1 on Thu Jul 16 09:10:34 2026;
|
09h00 Start-up modulator, laser, fridge, chillers, cycling remotly
09h20 HV ON
board 0 Mean/1e3: 6016.12427481845 |
Entered by Super Team from 127.0.0.1 on Thu Apr 16 07:32:14 2026; , entered from 127.0.0.1 
|
7h30 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
9h00 HV is ON
10h33 Energy = 50 MeV, Laser Phase 77 dg., Sect. Phase 217 dg., Sect. Att. 2.546 dB, I_Gun -98.9021 pC, I_Linac -131.1291 pC, I_TL -120.2702 |
Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026; Restart after strange last shift
|
12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen put last motor positions (2266 && 4158) --> No spot on screen :(
13h05 : Gun activities incresed (Vac > 1e-7 && reflected power) |
Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026;
|
08h32 Warm-up ThomX: Modulator, Laser, Fridge
08h37 Chillers were started, cycling all magnets
09h48 HV is ON |
Entered by Super Team from 127.0.0.1 on Fri Jul 17 08:20:39 2026;
|
08h15 Start-up modulator, laser, fridge, chillers, cycling remotly
09h20 HV ON
board 0 Mean/1e3: 6016.12427481845 |
Entered by Super Team from 127.0.0.1 on Fri Feb 13 17:38:00 2026; SHift du jour
|
The code for laser alignment does not work properly --> done by hand
H 5.244
V 4.654 |
Entered by Super Team from 127.0.0.1 on Fri Feb 6 08:26:22 2026;
|
08h25 Warm-up ThomX: Modulator, Laser, Fridge
08h33 Chillers were started, cycling all magnets.
09h31 HV is on. Vacuum: Li/Vac1 4e-9, Li/Vac2 3e-9, Li/Vac3 3e-9, Li/Vac4 1e-9 |
Entered by Super Team from 127.0.0.1 on Fri Apr 24 08:05:02 2026; , entered from 127.0.0.1
|
| 8h00 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage) |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:40:07 2021; Résumé de la journée
|
- Pour les atténuateurs : les butées ont été trouvées, ATT02-MOT01 c'est la canon, ATT01-MOT01 c'est la section.
- Des difficultés ont été rencontrés avec le modulateur : Interlock à cause de l'eau, interlock alim HT,
reboot modulateur et vérification de l'autorisation de tir MPS faite. |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:29:26 2021;
|
| Capture ecran modulateur |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:27:21 2021; HT sur modulateur et radioprotection
|
Contrôle radioprotection en cours HT = 1240V tension max, vide klystron : 1.2 uA
|
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:15:58 2021;
|
| Modulateur OK, HT = 500 V en trig |