Entry   Entered by Super Team from 127.0.0.1 on Wed Jul 1 11:24:31 2026;  
 

 

 
Entry   Entered by Super Team from 127.0.0.1 on Tue May 12 08:42:31 2026; manip Gplast Screenshot_from_2026-05-12_10-33-26.png
Demarrage machine 8h40

pB reflechi canon... temp consigne 27.7C

10h50 redemarrage chiller gun ... 
Entry   Entered by Super Team from 127.0.0.1 on Tue Jun 30 09:48:28 2026;  
Maher started the modulator

9h50 HV is on

09h53 Beam is in the ring w/o RF
Entry   Entered by Super Team from 127.0.0.1 on Tue Jun 23 09:43:18 2026; Vaccum in the FPC 
09h00 Start-up modulator, laser, fridge, chillers

After discussion with Daniele

Goal/Priority: Check for leakage in the FPC
Entry   Entered by Super Team from 127.0.0.1 on Tue Jun 16 13:43:02 2026;  
Hello,

I short-circuit the MPS input to modulator, we can trig modulator, the klystron filmant time goes to full time   , need 45 min, you can start at 14:35
Entry   Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026;  
10h02 Start-up modulator, laser, fridge, chillers

The SF6 pressure is low. Magnet power supplies filed to start.

11h17 Stop ThomX
icon1.gif   Entered by Super Team from 127.0.0.1 on Tue Feb 10 18:34:13 2026; Demarrage Linac 
Mesures après remontage de la cale : 1215 V sur le modulateur. ça tient mais encore des claquages
dans le Canon à 0dB. Il faut faire travailler encore un peu demain. 

la suite demain
Entry   Entered by Super Team from 127.0.0.1 on Thu Mar 19 07:46:39 2026; , entered from 127.0.0.1 
7h45: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

8h46 The photocathode laser image on the camera is very weak, I can't initiate feedback. Help needed.

08h56 HV is on
Entry   Entered by Super Team from 127.0.0.1 on Thu Jul 16 09:10:34 2026;  
09h00 Start-up modulator, laser, fridge, chillers, cycling remotly

09h20 HV ON

board 0  Mean/1e3:  6016.12427481845
Entry   Entered by Super Team from 127.0.0.1 on Thu Apr 16 07:32:14 2026; , entered from 127.0.0.1 Screenshot_from_2026-04-16_20-53-14.pngScreenshot_from_2026-04-16_20-53-34.png
7h30 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

9h00 HV is ON

10h33 Energy = 50 MeV, Laser Phase 77 dg., Sect. Phase 217 dg., Sect. Att. 2.546 dB, I_Gun -98.9021 pC, I_Linac -131.1291 pC, I_TL -120.2702
Entry   Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026; Restart after strange last shift  
12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen put last motor positions (2266 && 4158) --> No spot on screen :(
13h05 : Gun activities incresed (Vac > 1e-7 && reflected power)
Entry   Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026;  
08h32 Warm-up ThomX: Modulator, Laser, Fridge

08h37 Chillers were started, cycling all magnets

09h48 HV is ON
Entry   Entered by Super Team from 127.0.0.1 on Fri Jul 17 08:20:39 2026;  
08h15 Start-up modulator, laser, fridge, chillers, cycling remotly

09h20 HV ON

board 0  Mean/1e3:  6016.12427481845
Entry   Entered by Super Team from 127.0.0.1 on Fri Feb 13 17:38:00 2026; SHift du jour 
The code for laser alignment does not work properly --> done by hand 
H 5.244
V 4.654
Entry   Entered by Super Team from 127.0.0.1 on Fri Feb 6 08:26:22 2026;  Screenshot_from_2026-02-06_10-52-58.png
08h25 Warm-up ThomX: Modulator, Laser, Fridge

08h33 Chillers were started, cycling all magnets.

09h31 HV is on. Vacuum: Li/Vac1 4e-9, Li/Vac2 3e-9, Li/Vac3 3e-9, Li/Vac4 1e-9
Entry   Entered by Super Team from 127.0.0.1 on Fri Apr 24 08:05:02 2026; , entered from 127.0.0.1 
8h00 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
Entry   Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:40:07 2021; Résumé de la journée 
- Pour les atténuateurs : les butées ont été trouvées, ATT02-MOT01 c'est la canon, ATT01-MOT01 c'est la section.

- Des difficultés ont été rencontrés avec le modulateur : Interlock à cause de l'eau, interlock alim HT,
reboot modulateur et vérification de l'autorisation de tir MPS faite.
Entry   Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:29:26 2021;  HT_1100.png
Capture ecran modulateur
Entry   Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:27:21 2021; HT sur modulateur et radioprotection 
Contrôle radioprotection en cours HT = 1240V tension max, vide klystron : 1.2 uA

 
Entry   Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:15:58 2021;  
Modulateur OK, HT = 500 V en trig