HOME
Prise de donnees
MML
Controle commande
Simulations
Notes
Hardware
Ligne X
Laser Interaction
Diagnostiques
Synchronisation
Commissionning
Commissionning Preparation
Pannes
ShiftCheck
Toutes les notes concernant les Commissionning de ThomX, Page 43 of 63
Not logged in
Find
|
Last day
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
1245 Entries
Goto page
Previous
1
,
2
,
3
...
42
, 43,
44
...
61
,
62
,
63
Next
Entered by Super Team from 134.158.195.141 on Thu Dec 16 09:34:53 2021; éléments pulsés
Réglage des largeurs d'impulsion pour les kickers d'injection:
GENERATOR_2_CHANNEL_1: 'Ring pulsed injection'
GENERATOR_2_CHANNEL_2: 'Ring pulsed extraction'
Entered by Super Team from 134.158.195.141 on Thu Dec 9 12:56:32 2021; Alignements tete de machine
Operateurs : EG, HG
On continue sur les alignements avec un laser toujours dégradé.
LASER :
L'energie du laser a été mesurée ce matin autours de 20 µJ ....
Entered by Super Team from 134.158.195.141 on Thu Dec 4 08:58:52 2025; Preparation/check of the 70 MeV WP for X-ray run
Goal: preparation and checking the machine operation at 70 MeV and 40 MeV (ideally with X-rays)
8h54 Warming up
RF section 29.20 C -> 28.5 C
Entered by Super Team from 134.158.195.141 on Thu Dec 2 14:54:39 2021; Run Linac alignement
Laser:
Viktor est intervenu pour tourner le hublot afin d'améliorer la distribution du spot laser sur la photocathode. La stabilité
reste très bonne.
Energie : on est revenu à 50 µJ
Entered by Super Team from 134.158.195.141 on Thu Apr 14 08:04:41 2022; ThomX -commitionning diag
Demarrage modulateur et chiller 8h06
Entered by Super Team from 134.158.195.141 on Thu Apr 6 12:57:15 2023; Faisceau Linac
12h57 Mise en chauffe modulateur et refroiddissement canon et section
Vide dans l'anneau de l'ordre de 10-8
Mise en route faisceau
Entered by Super Team from 134.158.195.141 on Mon Sep 19 11:15:38 2022; Démarrage technique
Démarrage modulateur et chillers (MO)
Problème avec les icepap qu'il a fallu rebooter (probablement du à la coupure réseau, à vérifier) (FW)
IHM RF ok
Entered by Super Team from 134.158.195.141 on Mon Sep 5 15:58:08 2022; Shift Linac + TL
15h30 : intervention equipe Diag : redemarrage wavecatcher et DS associés
16h claquage qui stoppe la machine : seuil des pompes à vide ?
scan charge phase 1 : iris a 4 mm : Qmax = 62 pC @ 345 deg phase
Entered by Super Team from 134.158.195.141 on Mon Oct 24 14:07:57 2022; positions en mm ont disparu sur lIHM SST
Les positions en mm ont disparu sur lIHM SST !
est-il possible de les remettre comme c'etait la semaine derniere ??
Entered by Super Team from 134.158.195.141 on Mon Oct 7 09:30:50 2024;
pression SF6: 2.3 bar
(nb: redémarrage pc modulateur demain mardi 8/10 à 9h00)
Entered by Super Team from 134.158.195.141 on Mon May 23 09:11:49 2022;
9h10 Démarrage modulateur et chillers
casemate ouverte
- 11H : casemate fermée TRIG --> 1060 V HT sinon interlock (réflechis)
Entered by Super Team from 134.158.195.141 on Mon May 19 17:56:57 2025; Data : Sole scan, Q scan, random linac Yag_TL1
Today's data :
- coil scan (+ images)
- Q3 scan
Entered by Super Team from 134.158.195.141 on Mon May 12 16:26:53 2025; Conditionnement
7x
Demarrage du conditionnement :
Température : 30.90 pour accorder le canon
20dB 19dB ..... 15.5dB à 16h20: vide travaille cf plot.
Entered by Super Team from 134.158.195.141 on Mon Mar 31 09:46:30 2025; Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.
09h45 Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.
10h03 Fixed!
10h22 From time to time TO-V3 and EL-V1 close. Septum vacuum is 2.6e-10
Entered by Super Team from 134.158.195.141 on Mon Mar 27 13:55:24 2023; Etat ThomX
Cavité FP a terminé son intervention
Mise sous vide possible cette après-midi
14h Intervention IHM cavité RF
Entered by Super Team from 134.158.195.141 on Mon Mar 7 16:30:22 2022; PSS redemarre
Intervention Maher : PSS ok
Entered by Super Team from 134.158.195.141 on Mon Mar 4 08:57:45 2024; Recomissioning of the SR, search for the revolution frequency
08h50 Start up of the machine
- Problem with the vaccum, the valves around the RF cavity are down. Eric came. He checked and the problem is with the cable. it should
be changed. Intervention is ongoing.
Entered by Super Team from 134.158.195.141 on Mon Jun 28 15:53:02 2021; Conditionnement de la section
Conditionnement de la section
Verification et correction de la chaine de mesure
Ajustement des atténuations des 3 voies
:
PiS (Incident section)
PrS(Réflechis Section)
PCS (Charge fin section)
Mise en place de
Entered by Super Team from 134.158.195.141 on Mon Jun 28 11:24:57 2021; Attenuations
RF attenuations :
GUN (Maximun atténuation) Limite Hard = 1667 steps
Section (Minimum attenuation
= 0 steps)
Notez la limite maximul d'attenuation. Les valeurs calibrées s'arretent avant.
Entered by Super Team from 134.158.195.141 on Mon Jun 13 09:49:41 2022;
9h45 Mise en chauffe modulateur
11h : enfin du faisceau
Nous avons 50 uJ en sortie Diphragme Laser PC (ouverture = 1.5mm)