Draft
|
Wed Jun 17 08:36:20 2026 |
IC, VM | Under Process | Problem | Vide |
|
Restart of the accelerator | | 08h35 Start-up modulator (it was already
on standby), laser, magnets, cycling.
As yesterday there is a problem |
 |
|
854
|
Tue Mar 5 15:10:32 2024 |
IC, VM, VK | Under Process | Shift summary | Ring Commissioning |
|
Restart and tuning of the injector | | 10h Intervention to repair the water leakage.
It was repaired.
New problem with vacuum |
|
|
Draft
|
Mon Mar 9 12:55:30 2026 |
Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026 | | | |
|
Restart after strange last shift | | 12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen
put last motor positions (2266 && |
|
|
798
|
Fri Sep 29 10:19:52 2023 |
ND, Marie Labat | Under Process | Shift summary | Diag |
|
Reglage Cerenkov 29/9 | | 9:07 Mise en chauffe
Verifucation Alignement laser
Maher: changement de dosimetres |
 |
|
763
|
Mon Jun 12 14:52:39 2023 |
VK, IC. VM | | Shift summary | Ring Commissioning |
|
Reestablishing running conditions at 500.38 MHz | | Goal of the shift: Reestablish the good
storage at 500.38 and then try to optimize
the storage and orbit. |
    |
|
76
|
Mon Sep 27 14:49:10 2021 |
Entered by Nicolas Delerue from 134.158.88.175 on Mon Sep 27 14:46:15 2021 | Under Process | Problem | Linac Commissionning |
|
Redémarrage suite coupure Électrique, entered from 134.158.88.175 | | Bonjour,
Selon Astor, il y a encore des problèmes |
|
|
827
|
Thu Jan 11 14:47:37 2024 |
ND | Fixed | Info | Diag |
|
Redémarrage diags + synchro | | Pour la synchro, les generateurs de
retard ont ete redemarres.
Pour les diags: redemarrage de |
 |
|
658
|
Mon Jan 2 15:21:11 2023 |
ND/PG/JNC/MO/SC/VC/NE | Under Process | Linac | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique |
|
Redémarrage ThomX | | Bonne Année à tous !
Redémarrage de ThomX
- Mise en route du CC (PG, JNC) |
|
|
Draft
|
Mon Sep 27 14:46:31 2021 |
Entered by Nicolas Delerue from 134.158.88.175 on Mon Sep 27 14:46:15 2021 | Under Process | Problem | Linac Commissionning |
|
Redémarrage suite coupure Électrique | | Bonjour,
Selon Astor, il y a encore des problèmes |
|
|
719
|
Fri Mar 24 08:52:49 2023 |
SC/JNC/VC | Under Process | Problem | CC |
|
Redémarrage ThomX | | 8h53 Serveur DNS et DHCP non redémarré,
ping ne fonctionne pas, en attente d'une
solution |
    |
|
446
|
Mon May 2 14:02:58 2022 |
Entered by VC/SC from 134.158.195.141 on Mon May 2 14:02:42 2022 | Not Fixed | Linac | Linac Commissionning |
|
Redpitaya et modulateur |
| Remise en chauffe du modulateur
Reboot des redpitayas pour avoir
le signal HF sur l'IHM |
|
|
927
|
Fri Sep 27 17:03:34 2024 |
MJ HG | | Shift summary | Linac Commissionning |
|
Redemarrage machine apres probleme de synchro et/ou alim | | Apres un OFF/ON des baies alim et des transfo
+ baie synchro OFF/ON la synchro semble etre
de nouveau alive |
 |
|
149
|
Fri Nov 5 09:35:19 2021 |
Entered by Super Team from 134.158.195.141 on Fri Nov 5 09:35:02 2021 | Fixed | Info | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning |
|
Redemarrage 05/11 9h35 |
| Après coupure électrique
de cette nuit. Rédemarrage de tous
les systèmes : |
|
|
853
|
Mon Mar 4 08:58:01 2024 |
Entered by Super Team from 134.158.195.141 on Mon Mar 4 08:57:45 2024 | Under Process | Shift summary | Ring | Ring Commissioning |
|
Recomissioning of the SR, search for the revolution frequency | | 08h50 Start up of the machine
- Problem with the vaccum,
the valves around the RF cavity are down. |
|
|
850
|
Fri Mar 1 10:30:38 2024 |
VK, VM, IC | Under Process | Shift summary | Ring | Ring Commissioning |
|
Recomissioning of the SR, search for the revolution frequency | | 8h50 Start of the machine
Laser amplifier was somehow OFF.
Very strange situation and not clear why |
13x |
|
851
|
Fri Mar 1 10:39:04 2024 |
VK, VM, IC on Thu Feb 29 | Under Process | Shift summary | Ring | Ring Commissioning |
|
Recomissioning of the SR, search for the revolution frequency | | Start of the machine 9h
Optimization of the beam transport
to the Ring. |
  |
|
Draft
|
Thu Mar 7 08:58:28 2024 |
VK, VM, IC | Under Process | Shift summary | Ring Commissioning |
|
Recomissioning of the SR, search for the X-rays | | 8h50 Warming up the machine
Problem with the vaccum around
the RF cavity (see screenshot attached). |
|
|
1062
|
Wed Apr 30 08:51:08 2025 |
VC, DN, MJ, IC, VM | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
Recherche position image camera MRSV | | Start chauffage 9H
There were some problems: the phase
section motor was in the wrong position, |
   |
|
168
|
Wed Nov 17 14:00:28 2021 |
Entered by Super Team from 134.158.195.142 on Wed Nov 17 14:00:15 2021 | Fixed | Fix | Diag | Linac Commissionning |
|
Recherche du signal ICT après la section | | Alexandre Moutardier :
Signal ICT (ER/CA/RAC.05-ELR.01-WAC.02
channel CH3) pas visible après |
 |
|
330
|
Mon Feb 14 10:12:10 2022 |
Entered by Moutardier Alexandre from 134.158.195.142 on Mon Feb 14 10:11:53 2022 | Under Process | Fix | SY |
|
Recette synchro | | Nouvelle recette synchro par défault
enregistré : 20220201_reference.xml
A tester en faisceau dans la journée. |
|