  203   Wed Dec 8 15:11:18 2021 Entered by Super Team from 134.158.195.141 on Wed Dec 8 15:10:57 2021Under ProcessInfoLinac Commissionning Run Linac alignement Operateurs : EG, HG

but : travailler sur l'alignement
de la tete de machine
 laser_8Dec_16h40.pngRedpitaya_08Dec.png 
  Draft   Tue Dec 13 11:31:17 2022 KD, HGUnder ProcessLinacLI | TL | LE Run Linac   

Energie laser : 240 µJ en sortie
Laser
  
  Draft   Fri Nov 15 07:56:03 2024 IC, VK, VM, ND Shift summary  Ring studies, MRSV 07h50 Start ThomX

09h20 HV is 'ON'

09h25 HV  1215 V
 36x 
  Draft   Thu Jan 15 09:09:37 2026 ICUnder ProcessShift summary  Ring studies 08h56 Warm-up ThomX: Modulator, Laser,
Fridge
Chillers were started, cycling all
 Screenshot_from_2026-01-15_11-04-16.pngScreenshot_from_2026-01-15_11-33-33.pngRi_C1_Quads_is_off_Screenshot_from_2026-01-15_18-19-14.pngScreenshot_from_2026-01-15_16-42-27.pngScreenshot_from_2026-01-15_17-36-28after1LOCO.png 
  1187   Fri Jan 23 07:42:45 2026 IC, VMUnder ProcessShift summaryLaser Ring studies 7h45: mise en chauffe en remote (modulateur,
cyclage, laser, frigo/chillers)

08h43 HV is on
  
  Draft   Mon Feb 23 09:43:36 2026 IC    Ring studies 9h40: mise en chauffe (chillers/frigo,
modulateur, cyclage)

HV ON
  
  Draft   Wed Mar 25 07:28:22 2026 Entered by Super Team from 127.0.0.1 on Wed Mar 25 07:28:09 2026 Shift summaryLinac Commissionning | Ring Commissioning Ring studies 7h30 : mise en chauffe en remote (frigo/chiller,
modulateur, laser, cyclage)

08h40 HV ON
  
  752   Tue May 16 10:28:43 2023 LS, ND, IC, VKUnder ProcessShift summaryRing Commissioning Ring operation 16/5 9:33 Start warming up

9:45 Ducre is working on the plumbing
but it shuld not affect operations
 health_check_2023_05_16_12_02.pngscan_charge_phase_min_0.0_max_360.0_12_8_7.png2023-05-16_12_13_52_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngring_storage_quality__2023_05_16_16_06.png 
  751   Mon May 15 11:31:43 2023 ND, LS, IC, VK, VM, SWUnder ProcessShift summaryRing Commissioning Ring operation 15/5 10:00 Machine warm up

Magnets cycling

11:00 Start machine
 7x 
  624   Fri Nov 4 18:28:58 2022 VK, VM, IC, KD Shift summaryRing Commissioning Ring commissioning Start of the machine by KD

11h20 The beam is in the ring

Optimization of the injection with
 7x 
  Draft   Thu Jan 23 17:03:45 2025 Ring team AnneauRing Commissioning Ring Working Points 50 MeV/ 61.5 MeV / 70 MeV 50 MeV

Configuration:
 8x 
  1078   Mon May 26 09:38:46 2025 VM, ICUnder ProcessShift summaryRing Commissioning Ring BLM and charge linearity Goals:


-
 6x 
  160   Tue Nov 9 18:30:37 2021 Entered by Hayg Guler from 134.158.195.141 on Tue Nov 9 18:30:22 2021Under ProcessShift summaryLinac Commissionning Resumé du jour icon1.gif Shift consacré à la calibration
des moniteurs de pertes ainsi qu'à
l'allignement de la tete de machine (Laser
  
  34   Thu Jun 10 17:40:35 2021 Entered by Sophie Chance from 134.158.195.142 on Thu Jun 10 17:40:23 2021Under ProcessShift summaryresumes Resume shift 100621 Tests RFs réalisés : difficultés
avec le signal du réfléchi,
la forme du signal est étrange.
  
  998   Thu Jan 16 11:57:51 2025 Entered by Marie Jacquet from 134.158.89.45 on Thu Jan 16 11:57:39 2025FixedShift summaryLI | TL | Ring | Aimants Resultats Tour de cle Q1-Q3 - Shift 15/01 Prise de donnees axe Q1Q3 du 14/01

Steerers 
Axe q1q3    
 Tour_de_cle_Q1Q3.png 
  813   Thu Nov 2 16:52:14 2023 Entered by Super Team from 134.158.195.141 on Thu Nov 2 16:51:56 2023 InfoLI Restauration Base de donnée TANGO Restauration de la base de donnée
TANGO faite aujourd'hui.

Tests des DSs prévus demain
  
  748   Thu May 4 11:41:53 2023 VK, VM, IC, LS Shift summaryRing Commissioning Restart storage in the Ring ~9h Start of the modulator

10h Tuning of the injector with
KD
  
  Draft   Wed Jun 3 08:41:41 2026 IC, HG, JNC Shift summary  Restart of the accelerator 02/06/2026

~15h30 Starting all system

16h Start up of the modulator,
  
  Draft   Wed Jun 3 08:54:55 2026 IC, VMUnder ProcessUrgentLI | RF Anneau Restart of the accelerator 08h45 Start-up modulator, laser, magnets

09h38 Shutter Laser Linac is yellow.
Tuning off the gun operation key does not
 GunCharge_vs_LaserAtt.pngGunDarkCurrent_vs_Att.png 
  Draft   Tue Jun 16 11:34:11 2026 IC, VM Shift summary  Restart of the accelerator 11h20 Try to restart the accelerator. Start-up
modulator, laser, fridge, chillers

Problem, with all magnets control
  