203
|
Wed Dec 8 15:11:18 2021 |
Entered by Super Team from 134.158.195.141 on Wed Dec 8 15:10:57 2021 | Under Process | Info | Linac Commissionning |
|
Run Linac alignement | | Operateurs : EG, HG
but : travailler sur l'alignement
de la tete de machine |
 |
|
Draft
|
Tue Dec 13 11:31:17 2022 |
KD, HG | Under Process | Linac | LI | TL | LE |
|
Run Linac | |
Energie laser : 240 µJ en sortie
Laser |
|
|
Draft
|
Fri Nov 15 07:56:03 2024 |
IC, VK, VM, ND | | Shift summary | |
|
Ring studies, MRSV | | 07h50 Start ThomX
09h20 HV is 'ON'
09h25 HV 1215 V |
36x |
|
Draft
|
Thu Jan 15 09:09:37 2026 |
IC | Under Process | Shift summary | |
|
Ring studies | | 08h56 Warm-up ThomX: Modulator, Laser,
Fridge
Chillers were started, cycling all |
    |
|
1187
|
Fri Jan 23 07:42:45 2026 |
IC, VM | Under Process | Shift summary | Laser |
|
Ring studies | | 7h45: mise en chauffe en remote (modulateur,
cyclage, laser, frigo/chillers)
08h43 HV is on |
|
|
Draft
|
Mon Feb 23 09:43:36 2026 |
IC | | | |
|
Ring studies | | 9h40: mise en chauffe (chillers/frigo,
modulateur, cyclage)
HV ON |
|
|
Draft
|
Wed Mar 25 07:28:22 2026 |
Entered by Super Team from 127.0.0.1 on Wed Mar 25 07:28:09 2026 | | Shift summary | Linac Commissionning | Ring Commissioning |
|
Ring studies | | 7h30 : mise en chauffe en remote (frigo/chiller,
modulateur, laser, cyclage)
08h40 HV ON |
|
|
752
|
Tue May 16 10:28:43 2023 |
LS, ND, IC, VK | Under Process | Shift summary | Ring Commissioning |
|
Ring operation 16/5 | | 9:33 Start warming up
9:45 Ducre is working on the plumbing
but it shuld not affect operations |
   |
|
751
|
Mon May 15 11:31:43 2023 |
ND, LS, IC, VK, VM, SW | Under Process | Shift summary | Ring Commissioning |
|
Ring operation 15/5 | | 10:00 Machine warm up
Magnets cycling
11:00 Start machine |
7x |
|
624
|
Fri Nov 4 18:28:58 2022 |
VK, VM, IC, KD | | Shift summary | Ring Commissioning |
|
Ring commissioning | | Start of the machine by KD
11h20 The beam is in the ring
Optimization of the injection with |
7x |
|
Draft
|
Thu Jan 23 17:03:45 2025 |
Ring team | | Anneau | Ring Commissioning |
|
Ring Working Points 50 MeV/ 61.5 MeV / 70 MeV | | 50 MeV
Configuration: |
8x |
|
1078
|
Mon May 26 09:38:46 2025 |
VM, IC | Under Process | Shift summary | Ring Commissioning |
|
Ring BLM and charge linearity | | Goals:
- |
6x |
|
160
|
Tue Nov 9 18:30:37 2021 |
Entered by Hayg Guler from 134.158.195.141 on Tue Nov 9 18:30:22 2021 | Under Process | Shift summary | Linac Commissionning |
|
Resumé du jour |
| Shift consacré à la calibration
des moniteurs de pertes ainsi qu'à
l'allignement de la tete de machine (Laser |
|
|
34
|
Thu Jun 10 17:40:35 2021 |
Entered by Sophie Chance from 134.158.195.142 on Thu Jun 10 17:40:23 2021 | Under Process | Shift summary | resumes |
|
Resume shift 100621 | | Tests RFs réalisés : difficultés
avec le signal du réfléchi,
la forme du signal est étrange. |
|
|
998
|
Thu Jan 16 11:57:51 2025 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Jan 16 11:57:39 2025 | Fixed | Shift summary | LI | TL | Ring | Aimants |
|
Resultats Tour de cle Q1-Q3 - Shift 15/01 | | Prise de donnees axe Q1Q3 du 14/01
Steerers
Axe q1q3 |
|
|
813
|
Thu Nov 2 16:52:14 2023 |
Entered by Super Team from 134.158.195.141 on Thu Nov 2 16:51:56 2023 | | Info | LI |
|
Restauration Base de donnée TANGO | | Restauration de la base de donnée
TANGO faite aujourd'hui.
Tests des DSs prévus demain |
|
|
748
|
Thu May 4 11:41:53 2023 |
VK, VM, IC, LS | | Shift summary | Ring Commissioning |
|
Restart storage in the Ring | | ~9h Start of the modulator
10h Tuning of the injector with
KD |
|
|
Draft
|
Wed Jun 3 08:41:41 2026 |
IC, HG, JNC | | Shift summary | |
|
Restart of the accelerator | | 02/06/2026
~15h30 Starting all system
16h Start up of the modulator, |
|
|
Draft
|
Wed Jun 3 08:54:55 2026 |
IC, VM | Under Process | Urgent | LI | RF Anneau |
|
Restart of the accelerator | | 08h45 Start-up modulator, laser, magnets
09h38 Shutter Laser Linac is yellow.
Tuning off the gun operation key does not |
 |
|
Draft
|
Tue Jun 16 11:34:11 2026 |
IC, VM | | Shift summary | |
|
Restart of the accelerator | | 11h20 Try to restart the accelerator. Start-up
modulator, laser, fridge, chillers
Problem, with all magnets control |
|