  Draft   Wed Jun 3 08:41:41 2026 IC, HG, JNC Shift summary  Restart of the accelerator 02/06/2026

~15h30 Starting all system

16h Start up of the modulator,
  
  Draft   Wed Jun 3 08:54:55 2026 IC, VMUnder ProcessUrgentLI | RF Anneau Restart of the accelerator 08h45 Start-up modulator, laser, magnets

09h38 Shutter Laser Linac is yellow.
Tuning off the gun operation key does not
 GunCharge_vs_LaserAtt.pngGunDarkCurrent_vs_Att.png 
  Draft   Tue Jun 16 11:34:11 2026 IC, VM Shift summary  Restart of the accelerator 11h20 Try to restart the accelerator. Start-up
modulator, laser, fridge, chillers

Problem, with all magnets control
  
  Draft   Wed Jun 17 08:36:20 2026 IC, VMUnder ProcessProblemVide Restart of the accelerator 08h35 Start-up modulator (it was already
on standby), laser, magnets, cycling.

As yesterday there is a problem
 Screenshot_from_2026-06-17_15-54-18.pngScreenshot_from_2026-06-17_15-50-21.png 
  1250   Fri Jun 19 09:51:28 2026 IC, VMNot FixedUrgentLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Restart of the accelerator 09h35 Start-up modulator

09h52 Start the fridge

09h55 Start chillers
  
  1252   Fri Jun 26 08:27:22 2026 IC, VMUnder ProcessProblemLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Restart of the accelerator 08h26 Start-up modulator, laser, fridge,
chillers, cycling

09h31 Low SF6 pressure => JN
 Screenshot_from_2026-06-26_15-41-00.pngIMG-20260626-WA0001.jpgScreenshot_from_2026-06-26_16-07-50.pngScreenshot_from_2026-06-26_17-17-00.png 
  Draft   Mon Jun 29 07:42:22 2026 IC, VM    Restart of the accelerator 07h30 Start-up modulator, laser, fridge,
chillers, cycling remotly

Vacuum in the FPC is still ~1e-7
  
  854   Tue Mar 5 15:10:32 2024 IC, VM, VKUnder ProcessShift summaryRing Commissioning Restart and tuning of the injector 10h Intervention to repair the water leakage.
It was repaired.

New problem with vacuum
 Screenshot_from_2024-03-05_15-13-48.png 
  Draft   Mon Mar 9 12:55:30 2026 Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026    Restart after strange last shift  12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen
put last motor positions (2266 &&
  
  798   Fri Sep 29 10:19:52 2023 ND, Marie LabatUnder ProcessShift summaryDiag Reglage Cerenkov 29/9 9:07 Mise en chauffe

Verifucation Alignement laser

Maher: changement de dosimetres
 health_check_2023_09_29_11_58.pngscan_Laser_vs_RF_phase_2023_09_29_12_02.png 
  763   Mon Jun 12 14:52:39 2023 VK, IC. VM Shift summaryRing Commissioning Reestablishing running conditions at 500.38 MHz Goal of the shift: Reestablish the good
storage at 500.38 and then try to optimize
the storage and orbit.
 scan_charge_phase_min_0.0_max_360.0_14_32_59.pngScreenshot_from_2023-06-12_15-23-07.pngScreenshot_from_2023-06-12_15-40-14.pngScreenshot_from_2023-06-12_17-38-24.pngScreenshot_from_2023-06-12_17-32-48.png 
  76   Mon Sep 27 14:49:10 2021 Entered by Nicolas Delerue from 134.158.88.175 on Mon Sep 27 14:46:15 2021Under ProcessProblemLinac Commissionning Redémarrage suite coupure Électrique, entered from 134.158.88.175 Bonjour,

Selon Astor, il y a encore des problèmes
 Capture_2021-09-27_14.43.51.png 
  827   Thu Jan 11 14:47:37 2024 NDFixedInfoDiag Redémarrage diags + synchro Pour la synchro, les generateurs de
retard ont ete redemarres.

Pour les diags: redemarrage de
 health_check_Diag_2024_01_11_14_54.pnghealth_check_2024_01_11_14_55.png 
  658   Mon Jan 2 15:21:11 2023 ND/PG/JNC/MO/SC/VC/NEUnder ProcessLinacDiag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique Redémarrage ThomX Bonne Année à tous !

Redémarrage de ThomX

- Mise en route du CC (PG, JNC)
  
  Draft   Mon Sep 27 14:46:31 2021 Entered by Nicolas Delerue from 134.158.88.175 on Mon Sep 27 14:46:15 2021Under ProcessProblemLinac Commissionning Redémarrage suite coupure Électrique Bonjour,

Selon Astor, il y a encore des problèmes
  
  719   Fri Mar 24 08:52:49 2023 SC/JNC/VCUnder ProcessProblemCC Redémarrage ThomX 8h53 Serveur DNS et DHCP non redémarré,
ping ne fonctionne pas, en attente d'une
solution
 ping_automate.pngcamera_lidgsst.01.pngrf_gun_ihm.pngsrv4_astor.pngredpitaya_ihm.png 
  446   Mon May 2 14:02:58 2022 Entered by VC/SC from 134.158.195.141 on Mon May 2 14:02:42 2022Not FixedLinacLinac Commissionning Redpitaya et modulateur icon8.gif Remise en chauffe du modulateur

Reboot des redpitayas pour avoir
le signal HF sur l'IHM
  
  927   Fri Sep 27 17:03:34 2024 MJ HG Shift summaryLinac Commissionning Redemarrage machine apres probleme de synchro et/ou alim Apres un OFF/ON des baies alim et des transfo
+ baie synchro OFF/ON la synchro semble etre
de nouveau alive
 ICT.pngbpmLI.png 
  149   Fri Nov 5 09:35:19 2021 Entered by Super Team from 134.158.195.141 on Fri Nov 5 09:35:02 2021FixedInfoDiag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning Redemarrage 05/11 9h35 icon4.gif Après coupure électrique
de cette nuit. Rédemarrage de tous
les systèmes :
  
  853   Mon Mar 4 08:58:01 2024 Entered by Super Team from 134.158.195.141 on Mon Mar 4 08:57:45 2024Under ProcessShift summaryRing | Ring Commissioning Recomissioning of the SR, search for the revolution frequency  08h50 Start up of the machine

- Problem  with the vaccum,
the valves around the RF cavity are down.
  